As a follow up to the March 2016 Administration Committee, District staff met to review
and revise the strategies and initiatives of the FY 2016-2018 Strategic Plan. The
previously adopted Board vision, mission, values, and strategic goals are the framework
for the proposed plan. These goals reflect the challenges the District faces as it strives
to increase service quality and lower the cost of services to its customers. These
challenges include:
• Enhanced customer expectations and public awareness
• Aging infrastructure
• Continued regulatory requirements
• Financial constraints
• Expanded challenges associated with employee recruitment and retention
• Security and emergency response concerns
• Sustainable regional water supply concerns
• Increased focus on resource recovery
The goals, strategies, initiatives, and key success measures in the proposed Strategic
Plan will enable the District to overcome its challenges, accomplish its mission, and
meet the community's needs in the most efficient and cost-effective ways.
When developing this Strategic Plan, the Effective Utility Management (EUM) model
was used as an overarching tool to define attributes to be considered in implementing
practices and procedures to improve operations and move toward continued
sustainability.
The EUM framework was originally developed by the Environmental Protection Agency
and water industry leaders in 2007. The framework is made up of 10 attributes that
provide a succinct indication of where effectively managed utilities should focus and
what they should strive to achieve. The attributes can be viewed as a continuum of, or
set of building blocks for, management improvement opportunities.
C:\Users\CGranzelia\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\YTOD71 EQ\Strategic Plan Memo
05-09-2016.docx
3
Central Contra Costa Sanitary District
Page 2 of 2
Final Draft Fiscal Year 2016-2018 Strategic Plan
In 2015, the EUM Steering Group modified the original attributes to reflect the impact
that shifts in technology, policy, society, and the natural environmental have on both the
day-to-day operations of water sector utilities, and planning efforts on a long-term scale.
Using the EUM framework, senior management identified critical issues facing the
District. The Fiscal Year 2016-2018 Strategic Plan draws upon the work accomplished
under the Fiscal Year 2014-2016 Strategic Plan. Many of the goals and strategies
remain the same, but the initiatives and work activities have been updated. We
continue to optimize operations, streamline processes, and look for opportunities to
implement innovative technology to manage and contain costs.
The updated Strategic Plan continues our commitment to the mission of the District
while anticipating new challenges. The strategies define our plan for achieving our
Goals. The initiatives describe the tasks and actions we will take to accomplish our
strategy and our key success measures describe how we will evaluate our progress.
Two documents have been attached for your review. The first document is the
strategies, initiatives and the key success measures for evaluating progress. As this is
a two year strategic plan, activities that will be completed in the second year,
FY 2017-2018 are identified and noted. Also included in this document are key metrics
associated with each goal. On a quarterly basis, updates on the progress on each goal
and strategy through the fulfillment of the key success measures and the key metrics
will be reported to the Committee. The second document is a summary of the initiatives
and their alignment with the EUM attributes and the District's values.
The proposed strategic goals and initiatives will be incorporated into the revised Budget
Book.
GOAL ONE - PROVIDE EXCEPTIONAL CUSTOMER SERVICE
Strategy 1 — Foster Customer Engagement and Awareness
1. Invest in business process changes and technologies to effectively increase
access to District information and promote customer care, convenience and self-
service.
Key Success Measures
• Update website to increase customer engagement, efficiency in customer -
District processes, and showcase the District as an industry leader.
• Install kiosk in District Lobby (e.g. live Board of Director Meetings, website
information, service information, touch screen station).
• Develop and monitor growth of social media.
• Evaluate and improve process for managing District electronic records,
including emails.
• Implement on-line permit processing (FY 2017-18).
2. Increase customer understanding and support for key issues facing the District.
Key Success Measures
• Conduct and track outreach for the Comprehensive Wastewater Master
Plan.
• Conduct external presentations that highlight District services and key
initiatives through speaker's bureaus and other presentations.
• Conduct facility tours and track the number of people participating.
• Develop videos and public service announcements to communicate
important District information, programs and services.
3. Build and Maintain Relationships with Federal, State and Local Elected Officials
and Key Stakeholder groups.
Key Success Measures
• Track number of meetings with elected officials and stakeholders.
• Host an annual signature event that includes legislators and stakeholders.
• Plan presentations for Board Members to present to City Councils and
community groups of their liaison cities.
1
4. Provide high quality customer service.
Key Success Measures
• Provide staff with Public Records Act training.
• Respond to all customer field requests within 20 minutes, during working
hours.
• Conduct annual customer service sensitivity training for all District staff.
• Conduct annual political sensitivity training for all District management and
supervisory staff.
• Monitor customer feedback and identify trends and areas for
improvement.
• Survey customers and conduct research to assess customer expectations
(FY 2017-18).
Strategy 2 — Improve Interdepartmental Collaboration
1. Foster employees' understanding of District operations and their role in our
success.
Key Success Measures
• Communicate important District initiatives and information to employees
via print and electronic communication.
• Solicit feedback from employees on efficiency of District operations, and
implement viable solutions.
• Continue review and streamlining of existing Board Policies, and assist
with development of new Board Policies as may be necessary.
• Update OTIS intranet system and update its content (FY 2017-18).
2. Increase internal partnerships.
Key Success Measures
• Develop multi -divisional teams for implementation of Board approved
recommendations from the Comprehensive Wastewater Master Plan.
• Develop multi -divisional teams to implement District -wide business
process efficiency projects.
• Continue the IT Leadership Committee.
2
GOAL ONE - KEY METRICS
Metric Target
Average onsite response time for
collection system emergency calls, during
working hours
Average onsite response time for
collection system emergency calls, after
hours
Less than 20 minutes
Less than 30 minutes
Average customer service rating for At least 3.8 out of 4.0
emergency calls
Average customer satisfaction rating on Greater than 95%
construction projects
Average customer satisfaction rating on Greater than 95%
permit counter interactions
Number of students served by our Greater than 2,200 per year
education programs
Number of District employees attending At least 50% of all district staff
annual customer service training
Number of participants on treatment plant Greater than 150 participants per year
tours
Number of participants at speaker bureau Greater than 400 participants per year
presentations
Number of students attending Citizens Greater than 30 participants per session
Academy
3
GOAL TWO - STRIVE TO MEET REGULATORY REQUIREMENTS
Strategy 1 — Strive to Achieve 100% Permit Compliance in Air, Water, Land and Other
Regulations
1. Renew Treatment Plant NPDES permit which expires on March 31, 2017.
Key Success Measures
• Prepare application and submit application to the RWQCB on or before
September 30, 2016.
• Obtain new permit.
2. Meet existing regulations and plan for future regulations
Key Success Measures
• Comply with all permit requirements for air, wastewater discharges and
recycled water.
• Develop a comprehensive regulatory permit matrix, (i.e. current permits
with which the District must comply) and maintain and track on a quarterly
basis.
• Provide an annual regulatory update to the Board.
3. Foster relationships with regulatory agencies.
Key Success Measures
• Actively participate in meetings of BACWA and the RWQCB.
• Participate in relevant meetings and workshops with regulatory agencies.
• Communicate directly with RWQCB, SWRCB, BAAQMD, CARB and EPA
staff, as needed.
4. Monitor and track, proposed and pending legislation/regulatory changes that may
impact District operations.
Key Success Measures
• Develop an internal system to track relevant proposed
legislation/regulations.
• Analyze, review and comment on relevant proposed
legislation/regulations, as appropriate.
• Actively participate in Professional Associations (NACWA, WEF, CASA,
BACWA, CWEA, etc.).
4
5. Actively manage Greenhouse Gas (GHG) emissions in the most cost effective
and responsible manner.
Key Success Measures
• Keep CO2e anthropogenic GHG emissions below 25,000 metric tons.
• Prepare internal monthly GHG emission inventory updates.
• Prepare and submit annual GHC emission inventory to CARB.
• Prepare internal annual inventory summary and verification report.
Strategy 2 — Strive to Minimize the Number of Sanitary Sewer Overflows
1. Complete the collection system scheduled maintenance on time and optimize
cleaning schedules to improve efficiencies.
Key Success Measures
• Clean at least 800 miles of sewer lines per year.
• Complete scheduled maintenance on time for at least 95% of the
schedules.
2. Continue the pipeline condition assessment and cleaning quality assurance
program using the system wide CCTV program.
Key Success Measures
• Televise at least 150 miles of sewer line per year.
• Identify emergency pipeline projects and included them in the CIP.
• Perform CCTV QA/QC on 3% of lines cleaned on an annual basis with a
goal of having at least a 98% passing rate.
5
GOAL TWO - KEY METRICS
Metric Target
NPDES Compliance Zero violations
Title V Compliance Zero violations
Recycled Water Title 22 Compliance Zero violations
Sanitary Sewer Overflows Less than 3.0 spills per 100 miles of
pipeline
Spills to Public Water Less than 3 per year
Percent of Spills less than 500 gallons Greater than 95%
Pipeline cleaning schedules completed on Greater than 95%
time
Pipeline Cleaning Quality On at least 3% of pipelines cleaned on an
Assurance/Quality Control (QA/QC) annual basis
Pipeline Cleaning QA/QC passing rate Greater than 98%
Annual source controls inspections 100%
completed on time
6
GOAL THREE — BE A FISCALLY SOUND AND EFFECTIVE WATER
SECTOR UTILITY
Strategy 1 — Conduct Lona Ranae Financial Planning
1. Ensure rate structure is consistent with cost of service principles.
Key Success Measures
• Perform rate study to support the Board approved recommendations from
the Comprehensive Wastewater Master Plan
• Review and implement a new rate structure for mixed use businesses.
• Develop a public outreach strategy associated with the rate study and its
recommendations.
• Conduct audit of rates and fees (FY 2017-18)
2. Improve the application and processing of capacity fees for consistency across
user classes.
Key Success Measures
• Conduct annual capacity fee audits to ensure appropriate fees are
assessed and collected.
• Conduct annual review of business establishments to ensure consistent
use with existing permits and capacity fees paid.
3. Develop a long range debt management policy.
Key Success Measures
• Present draft policy to Board by June 2017.
■ Policy will consider intergenerational equity and the use of debt
prudently to stabilize long term rates
• Develop alternative scenarios to utilize debt prudently to optimize the
financing of the Board approved recommendations of the Comprehensive
Wastewater Master Plan.
4. Develop alternatives for new revenues and funding sources (i.e. interagency
agreements, services, recycled water).
Key Success Measures
• Identify District services that could be offered to other regional public
agencies and implement feasible alternatives.
• Identify and pursue State Revolving Fund (SRF) loan and grant
opportunities, as appropriate.
7
Strateav 2 — Manaae Costs
1. Perform targeted audits of critical/high risk functions or processes.
Key Success Measures
• Identify high cost/high risk functions.
• Perform at least three audits of high risk functions (FY 2016-18).
2. Perform optimization studies of treatment plant and field operations to reduce
costs.
Key Success Measures
• Identify treatment plant and field processes for optimization.
• Perform optimization studies on at least three of the processes identified
(FY 2016-18).
3. Evaluate and implement risk management practices to minimize Toss.
Key Success Measures
• Identify and implement lessons learned from previous losses
(FY 2016-18).
• Reduce average cost of overflow claims.
• Offer temporary modified duty to employees with occupational injuries.
• Provide an annual Risk Management Report to the Board.
8
GOAL THREE - KEY METRICS
Metric Target
Standard and Poor's Credit Rating AAA
Debt service coverage ratio Greater than 2.0 times
Maintain service affordability Sewer Service Charge Tess than median
of Bay Area agencies
Actual reserves as a percentage of target 100%
Operating expenditures as a percentage Greater than 90%
of operating budget
Workers Compensation experience Less than 1.0
modifier
Return to Work Provide modified duty for greater than
80% of occupational injuries
Self-insurance
Self-insurance
liability fund
emergency fund
9
Maintain reserve at 3.0 times retained
level
Maintain $5 million reserve
GOAL FOUR — DEVELOP AND RETAIN A HIGHLY TRAINED AND INNOVATIVE
WORKFORCE
Strateav 1 — Ensure Adeauate Staffina and Training to Meet Current and Future
Operational Levels
1. Assess, develop, and implement district -wide training needs.
Key Success Measures
• Hire Training Coordinator position.
• Develop and implement a training plan for each business section
(FY 2016-18).
• Develop and implement a training plan for each employee classification
(FY 2016-18).
• Continue to encourage and track the usage of outside training and tuition
reimbursement programs.
2. Develop and train our future leaders.
Key Success Measures
• Continue the Leadership and Supervisors Academies (alternating years).
• Implement the Mentorship Program.
• Implement Team Building Program for the Management Team.
• Implement one-on-one coaching sessions for Management Team.
Strateav 2 — Enhance Relationship with Employees and Bargaining Units
1. Cultivate a positive work culture and promote teamwork.
Key Success Measures
• Establish and communicate clear performance expectations and
standards.
• Regularly assess and communicate performance against standards.
• Solicit feedback on employee satisfaction and engagement, and
implement viable suggestions.
• Promote opportunities for cross -divisional work teams.
• Provide opportunities to recognize high performing teams at Department
Meetings and Board Meetings.
• Continue the General Manager lunches with the Division workgroups.
• Maintain Lateral Connection employee centered newsletter.
10
2. Sustain and grow collaborative relationships with the labor bargaining units.
Key Success Measures
• Continue the General Manager lunches with the bargaining
representatives.
• Continue the Labor Management Committee meetings.
• Engage the bargaining units in informal discussions on collaborative
solutions to workplace issues.
Strategy 3 — Meet or Exceed Industry Safety Standards
1. Achieve consistent improvement on State of California and Bay Area industry
injury rate.
Key Success Measures
• Continue monitoring of accident/incident causation including type,
mechanism, and body part to identify and mitigate hazards.
• Continue providing accident/incident analysis summary to the District
Safety Committee and Safety Teams on a monthly basis to inform
members about accident/incident causation and corrective measures.
• Continue providing accident/incident analysis summary to District
Management Team on a quarterly basis to inform Managers of their
respective workgroup's performance, accident causation, and corrective
measures.
• Continue providing an Annual Safety Report to the Board.
2. Enhance the Safety culture through improved training and communications.
Key Success Measures
• Continue conducting regulatory required safety training.
• Continue conducting training based upon accident/incident causal factors,
new processes, equipment, or procedures.
• Continue providing relevant safety information to personnel via the Safety
Corner in the Lateral Connection.
• Continue providing upcoming safety related legislation and regulations to
supervisors and managers via the Cal/OSHA Reporter and Safety
Supervisor.
• Continue safety staff participation in Department meetings via tailgate
training sessions or safety updates.
• Implement safety training/tracking system.
11
GOAL FOUR - KEY METRICS
Metric Target
Average time to fill vacancy (from request Less than 60 days
to hire)
Percentage turnover rate to remain at or Less than 3.4%
below industry average
Average annual training hours per Track in FY 2016-17, set target for
employee FY 2017-18
Actual versus budgeted usage of tuition
reimbursement
Percentage of performance evaluations
completed on time
Employee injury and illness lost time Less than BLS California Sewage
incident rate Treatment Facilities Rate
Greater than 80%
100%
12
GOAL FIVE — MAINTAIN A RELIABLE INFRASTRUCTURE
Strateav 1 — Manaae Assets Optimally Throuahout Their Lifecvcle
1. Implement Board approved recommendations from the Comprehensive
Wastewater Master Plan and Condition Assessment.
Key Success Measures
• Implement prioritized Comprehensive Wastewater Master Plan and
Condition Assessment recommendations that are maintenance related
and incorporate these into the maintenance schedule (e.g. corrective work
orders) or adjust maintenance activities (e.g. Preventative Maintenance
Plan) as appropriate.
• Implement the Capital Improvement Projects identified in the
Comprehensive Wastewater Master Plan consistent with Board approved
recommendations.
2. Update the Consequence of Failure Matrices.
Key Success Measures
• Review and update the Consequence of Failure Matrices by June 2017.
3. Implement the Reliability Centered Maintenance (RCM) Program.
Key Success Measures
• Train staff on RCM analysis and software.
• Perform Reliability Centered Maintenance on at least five treatment plant
process systems (FY 2016-18).
4. Manage and maintain current equipment and vehicle fleet to provide maximum
value.
Key Success Measures
• Maintain uptime for vehicles and equipment greater than 95%.
• Install automated vehicle location (AVL) on all District vehicles.
• Develop and implement diagnostics associated with AVL.
13
Strategy 2 — Facilitate Lona -Term Capital Renewal and Replacement
1. Integrate the data from the Asset Management Program into the analysis of long
term Capital Improvement needs based on the Board approved Comprehensive
Wastewater Master Plan.
Key Success Measures
• Complete the implementation of InfoMaster software to determine
prioritization of collection system pipe replacement based on likelihood
and consequence of failures factors.
• Develop a business process to incorporate long-term (10 plus years)
renewal and replacement schedules into the Capital Improvement
Program (CIP) based on the Board approved Comprehensive Wastewater
Master Plan.
• Coordinate near- term CIP projects identified in the condition assessment
findings with the Board approved Comprehensive Wastewater Master
Plan.
2. Implement business case evaluations, including life -cycle cost into proposals for
new CIP projects to determine most cost effective projects and solutions, for
projects that were not identified in the approved Master Plan or already included
in the Capital Improvement Budget (CIB).
Key Success Measures
• Adopt a Business Case Evaluation Process (FY 2016-17) for new projects
not already identified in the CIB or Board approved Comprehensive
Wastewater Master Plan.
• Prepare Business Case Evaluations for all large projects over $1 million if
not already identified in the CIB or Board approved Comprehensive
Wastewater Master Plan.
Strateav 3 — Protect District Personnel and Assets from Threats and Emergencies
1. Enhance our capability to mitigate, prepare, respond and recover from
emergencies.
Key Success Measures
• Implement the minimum readiness requirements of the Continuity Plan.
• Add one continuity, field and treatment plant practical exercise to the
Emergency Management Training Program.
• Complete the five-year update to the multi jurisdictional Local Hazard
Mitigation Plan (LHMP) (Contra Contra County, State, FEMA).
• Update the Emergency Operations Plan.
• Relocate the data center to a more secure location (FY 2016-18)
• Explore cloud -based systems such as email and cloud backup solution.
14
2. Evaluate and implement appropriate improvements to our Security Program to
meet new or evolving threats.
Key Success Measures
• Develop a Comprehensive Security Master Plan.
• Conduct physical security assessments of the Martinez and Walnut Creek
facilities.
• Consolidate security monitoring at all District facilities.
• Enhance the security culture through improved communication.
• Upgrade treatment plant -side network and network equipment to create
redundant paths.
• Develop and implement critical information (IT) security policy/procedure.
GOAL FIVE - KEY METRICS
Metric Target
Safety work orders completed on time 100%
Regulatory Title V work orders completed 100%
on time
Planned treatment plant preventative Greater than 95%
maintenance completed on time
Complete implementation of Infomaster By First Quarter of 2017
Miles of pipeline replaced Greater than 1% of assets
Capital expenditures as a percentage of Greater than 90%
capital budgeted cash flow
Information System uptime (excluding 100%
planned maintenance)
Data Backup and Recovery Zero Lost Data
15
GOAL SIX — EMBRACE TECHNOLOGY, INNOVATION AND ENVIRONMENTAL
SUSTAINABILITY
Strategy 1 — Augment the Region's Water Supply
1. Explore partnering opportunities (e.g. CCWD and EBMUD).
Key Success Measures
• Complete wholesale opportunities next steps.
• Work with regional partners to develop water supply opportunities.
• Support regional development of local water supply.
2. Develop a Satellite Recycled Water Facilities (SRWF) Program.
Key Success Measures
• Complete the Facilities Planning Study, or other alternative, for the
Diablo Country Club's (DDC) SWRF project.
• Finalize the agreement for the DCC SWRF Project.
• Submit the application for a SRF loan for the DCC Project, if applicable.
Strategy 2 — Evaluate Business Processes and Optimize Business Operations
1. Perform business process mapping and re-engineering.
Key Success Measures
• Implement Automated Time Keeping Program.
• Update Purchasing Policy and Procedures to incorporate best practices
and simplify the process.
• Work with the ERP vendor to implement targeted improvements to
processes as identified (FY 2016-18).
• Develop a plan to implement other improvements to existing processes in
key business areas (FY 2017-18).
• Issue a RFP and contract with a consultant to perform business process
mapping to identify opportunities for streamlining administrative business
processes (FY 2017-18).
16
Strateav 3 - Reduce Reliance on Non -Renewable Energy
1. Explore opportunities for self -generation, conservation and efficiency based on
the Board approved Comprehensive Wastewater Master Plan.
Key Success Measures
• Develop energy self-sufficiency assessment.
• Develop criteria for the evaluation of energy generation projects.
• Prepare an Energy policy to be approved by the Board.
• Track and review energy usage and explore options to optimize energy
efficiency.
Strategy 4 — Encourage the review and testing of aromisina and leading technology.
1. Expand and improve the use of cost effective mobile computing and
communication technologies.
Key Success Measures
• Acquire and roll out mobile devices for appropriate staff.
• Train staff on the use of CMMS mobile devices.
• Implement mobile applications.
o CMMS (FY 2016-17)
o Timekeeping (FY 2017-18)
o Construction Inspections (FY2017-18)
o Environmental Compliance (FY2017-18)
o Flexible Spending Account (FY2017-18)
o Ben IQ (FY2017-18)
2. Continue developing and investing in cost effective innovation, technology and
applied Research and Development.
Key Success Measures
• Meet quarterly with the Applied Research Committee to promote
innovation and continuous improvement.
• Track and assign resources to implement applied research projects as
recommended by the Board approved Comprehensive Wastewater Master
Plan or by staff.
17
GOAL SIX - KEY METRICS
Metric
Total gallons of recycled water distributed
to external customers
Maximum residential fill station customer
wait time
Gallons of recycled water distributed at
the residential fill station
Gallons of recycled water distributed at
truck fill program
kWh of Electricity produced
kWh of solar power produced at CSO and
HHW
Pilot Test new and promising technology
Target
Greater than 240 million gallons per year
15 minutes
Greater than 14 million gallons per year
Greater than 4 million gallons per year
Greater than 18 million kWh per year
(reported as a rolling average)
Greater than 200 kWh per year (reported
as a rolling average)
Greater than 3 pilot tests or reviews per
year
Present research papers and findings Greater than 3 papers per year
18
Goal
GOAL 1- PROVIDE
EXCEPTIONAL
CUSTOMER
SERVICE
Central Contra Costa Sanitary District
FY 2016-2018 Strategic Plan and Initiatives
Alignment with Effective Utility Management Attributes and District Values
Strategy
Foster Customer
Engagement and
Awareness
Initiative
Invest in business process changes and
technologies to effectively increase access
to District information and promote
customer care, convenience and self-
service.
Increase customer understanding and
support for key issues facing the District.
Build and maintain relationships with
Federal, State and Local Elected Officials
and key stakeholder groups.
Provide high quality customer service.
Foster employees' understanding of
District operations and their role in our
success.
Improve
Interdepartmental Increase internal partnerships.
Collaboration
EUM Attribute Value
Customer Satisfaction Leadership And
Commitment
Operational
Optimization
Stakeholder
Understanding and
Support
Stakeholder
Understanding and
Support
Community
Community
Customer Satisfaction Community
Customer Satisfaction People
Employee and
Leadership
Development
People,
Community
Goal
GOAL 2 - STRIVE TO
MEET
REGULATORY
REQUIREMENTS
Central Contra Costa Sanitary District
FY 2016-2018 Strategic Plan and Initiatives
Alignment with Effective Utility Management Attributes and District Values
Strategy
Strive to Achieve
100% Permit
Compliance in Air,
Water, Land and
Other Regulations
Strive To Minimize
The Number Of
Sanitary Sewer
Overflows
Initiative
Renew treatment plant NPDES permit.
Meet existing regulations and plan for
future regulations.
Foster relationships with regulatory
agencies.
Monitor and track, proposed and pending
legislation/regulatory changes that may
impact District operations.
Actively manage GHG emissions in the
most cost effective and responsible
manner.
Complete the collection system scheduled
maintenance on time and optimize cleaning
schedules to improve efficiencies.
Continue the pipeline condition assessment
and cleaning quality assurance program
using the system wide CCTV program.
EUM Attribute
Product Quality
Value
Principles
Product Quality Principles
Stakeholder Community
Understanding and
Support
Stakeholder
Understanding and
Support
Community
Sustainability
Infrastructure
Strategy and
Performance
Infrastructure
Strategy and
Performance
Community
Principles
Leadership and
Commitment
Leadership And
Commitment
Central Contra Costa Sanitary District
FY 2016-2018 Strategic Plan and Initiatives
Alignment with Effective Utility Management Attributes and District Values
Goal Strategy Initiative EUM Attribute Value
Ensure rate structure is consistent with cost Financial Viability Community
of service principles. Principles
Improve the application and processing of Financial Viability Community
Conduct Long Range capacity fees for consistency across user Principles
classes.
Financial Planning Develop a long range debt management Financial Viability Principles
policy.
GOAL 3 -BEA
FISCALLY SOUND Develop alternatives for new revenues and Financial Viability Leadership and
AND EFFECTIVE funding sources (i.e. Interagency Commitment
agreements, services, recycled water).
WATER SECTOR
UTILITY Perform targeted audits of critical/high risk Enterprise Resiliency Principles
functions or processes.
Manage Costs
Perform optimization studies of treatment Operational
plant and field operations to reduce costs. Optimization
Leadership And
Commitment
Evaluate and implement risk management Enterprise Resiliency Principles
practices to minimize Toss.
Goal
GOAL 4 — DEVELOP
AND RETAIN A
HIGHLY TRAINED
AND INNOVATIVE
WORKFORCE
Central Contra Costa Sanitary District
FY 2016-2018 Strategic Plan and Initiatives
Alignment with Effective Utility Management Attributes and District Values
Strategy
Ensure adequate
staffing and training
to meet current and
future operational
levels
Enhance relationship
with employees and
bargaining units
Meet or exceed
industry safety
standards
Initiative
Assess, develop, and implement district -
wide training needs.
Develop and train our future leaders.
Cultivate a positive work culture and
promote teamwork.
Sustain and grow collaborative
relationships with the labor bargaining
units.
EUM Attribute
Employee and
Leadership
Development
Employee and
Leadership
Development
Value
People,
Leadership And
Commitment
People,
Leadership And
Commitment
Employee and People,
Leadership Leadership and
Development Commitment
Stakeholder People,
Understanding and Community
Support
Achieve consistent improvement on State Employee and
of California and Bay Area industry injury Leadership
rate. Development
Enhance the safety culture through Employee and
improved training and communications. Leadership
Development
People,
Principles,
Leadership and
Commitment
People,
Principles
Goal
GOAL 5 —
MAINTAIN A
RELIABLE
INFRASTRUCTURE
Central Contra Costa Sanitary District
FY 2016-2018 Strategic Plan and Initiatives
Alignment with Effective Utility Management Attributes and District Values
Strategy
Manage assets
optimally throughout
their lifecycle
Facilitate Tong -term
capital renewal and
replacement
Protect District
personnel and assets
from threats and
emergencies
Initiative
Implement Board approved
recommendations from the
Comprehensive Wastewater Master Plan
and Condition Assessment.
Update the Consequence of Failure
Matrices.
Implement the reliability centered
maintenance (RCM) program.
Manage and maintain current equipment
and vehicle fleet to provide maximum
value.
Integrate the data from the Asset
Management Program into the analysis of
long term capital improvement needs.
Implement business case evaluations,
including life -cycle cost into proposals for
new CIP projects to determine most cost
effective projects and solutions.
Enhance our capability to mitigate,
prepare, respond and recover from
emergencies.
Evaluate and implement appropriate
improvements to our Security Program to
meet new or evolving threats.
EUM Attribute
Infrastructure
Strategy and
Performance
Enterprise Resiliency
Infrastructure
Strategy and
Performance
Infrastructure
Strategy and
Performance
Infrastructure
Strategy and
Performance
Infrastructure
Strategy and
Performance
Enterprise Resiliency
Enterprise Resiliency
Value
Principles,
Community
Principles.
Leadership and
Commitment
Leadership And
Commitment
Leadership And
Commitment
Leadership And
Commitment
Leadership And
Commitment
Principles
Principles
Goal
GOAL 6 — EMBRACE
TECHNOLOGY,
INNOVATION AND
ENVIRONMENTAL
SUSTAINABILITY
Central Contra Costa Sanitary District
FY 2016-2018 Strategic Plan and Initiatives
Alignment with Effective Utility Management Attributes and District Values
Strategy
Augment the
Region's Water
Supply
Evaluate Business
Processes and
Optimize Business
Operations
Reduce reliance on
Non -Renewable
Energy
Encourage the review
and testing of
promising and leading
technology
Initiative
Explore partnering opportunities (e.g.
CCWD and EBMUD).
Develop a Satellite Recycled Water
Facilities (SRWF) Program.
Perform business process mapping and re-
EUM Attribute
Water Resource
Sustainability
Water Resource
Sustainability
Operational
engineering. Optimization
Explore opportunities for self -generation,
conservation and efficiency based on the
Board approved Comprehensive
Wastewater Master Plan.
Expand and improve the use of cost
effective mobile computing and
communication technologies.
Continue developing and investing in cost
effective innovation, technology and
applied research and development.
Community
Sustainability
Operational
Optimization
Operational
Optimization
Value
Community
Community,
Leadership And
Commitment
Leadership And
Commitment
Leadership And
Commitment
Leadership And
Commitment
Leadership and
Commitment