HomeMy WebLinkAbout09.d. Award contract for North Orinda Sewer Renovations, Phase 6, District Project 8423, to Pacific Trenchless, Inc. Central Contra Costa Sanitary District
r BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: March 17, 2016
Subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL
MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO
SUBMITTAL REQUIREMENTS WITH PACIFIC TRENCHLESS, INC. FOR THE
CONSTRUCTION OF THE NORTH ORINDA SEWER RENOVATIONS,
PHASE 6, DISTRICT PROJECT 8423
Submitted By. Initiating Dept/Div.:
Mark Wenslawski, Associate Engineer Engineering and Technical
Services/Capital Projects
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
S. Mestetsky—Senior Engineer w w
E. J. Lopez—Capital Projects Division Manager Roger S.Bailey
JM. Petit—Director of Engineering and Technical Services General Manager
ISSUE: On March 1, 2016, five (5) sealed bids were received and opened for the
construction of the North Orinda Sewer Renovations, Phase 6, District Project 8423.
The Board of Directors must award the contract or reject bids within 50 days of the bid
opening. Authorize the General Manager to execute the Contract Documents subject to
SUBMITTAL requirements.
BACKGROUND: North Orinda Sewer Renovations, Phase 6, is part of the ongoing
Collection System Renovation Program. The work aligns with the District's Strategic
Plan, specifically Goal No. 6, which is "Maintain a Reliable Wastewater Infrastructure."
The project will renovate approximately 8,700 lineal feet of 6- and 8-inch sewer lines
located within the public rights-of-way, easements, and near creeks. The project
location map is identified in Attachment 1.
District staff prepared the plans and specifications for the project. The Engineer's
estimate for construction is $2,400,000. This project was advertised on February 8
and 12, 2016. Five (5) sealed bids ranging from $1,966,491 to $2,880,755 were
received and publicly opened on March 1, 2016. The Engineering Department
conducted a technical and commercial review of the bids and determined that Pacific
Trenchless, Inc. is the lowest responsive bidder. The schedule of bid submitted by
Pacific Trenchless was found to contain a minor discrepancy in one of the unit prices
between the price written in words and the price in figures. Per our Instructions to
Bidders and specifications, the price written in words governs. Per the specifications,
the bid was recalculated to a bid amount of$1,967,491. A summary of bids received is
shown in Attachment 2. The District will administer the construction contract and will
provide contract administration, inspection, survey, office engineering, and submittal
review.
Page 1 of 6
POSITION PAPER
Board Meeting Date: March 17, 2016
subject. AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE
GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT
TO SUBMITTAL REQUIREMENTS WITH PACIFIC TRENCHLESS, INC.
FOR THE CONSTRUCTION OF THE NORTH ORINDA SEWER
RENOVATIONS, PHASE 6, DISTRICT PROJECT 8423
CEQA: Staff has concluded that this project is exempt from CEQA under District CEQA
Guidelines Section 15302, because it involves replacement of existing sewer facilities at
substantially the same locations and with the same purpose and level of activity as the
facilities being replaced. Any capacity increases are for non-growth inducing, wet
weather purposes. This project also is exempt under District CEQA Guidelines
Section 15061(b)(3), since it can be seen with certainty that there is no possibility that
the activity in question may have a significant effect on the environment. This certainty
is based on the District's past experience with numerous sewer construction projects of
this nature, the relatively short distances involved, and the District's mitigating
construction specifications. These specifications are standardized general and special
conditions that are made part of the project bid documents to address environmental
considerations, such as protecting trees and riparian areas, as well as compliance with
applicable federal, state, county, district, municipal and local laws, ordinances, orders,
and regulations. Approval of this project will establish the Board of Directors'
independent finding that this project is exempt from CEQA.
ALTERNATIVES/CONSIDERATIONS: Reject all bids, which is not recommended.
FINANCIAL IMPACTS: The total project cost of the North Orinda Sewer Renovations,
Phase 6, is anticipated to be $3,312,500, including design, bid price, contingency, and
construction management. This project is included in the Fiscal Year (FY) 2015-16
Capital Improvement Budget (CIB) on page CS-13 with a total project budget of
$3,649,333. Staff has conducted a budget analysis of the FY 2015-16 Collection
System Program budget and concluded that adequate funds are available for this
project.
COMMUNITY OUTREACH: The District held a public meeting on February 4, 2016, at
the City of Orinda Library to assist with any questions or concerns by the residents
along the alignments.
COMMITTEE RECOMMENDATION: The Engineering and Operations Committee
reviewed this project at its meeting on March 8, 2016, and recommended award of the
project.
RECOMMENDED BOARD ACTION: Staff recommends the following:
1. Find that the project is exempt from CEQA,
2. Award a construction contract in the amount of$1,967,491 for the construction of
the North Orinda Sewer Renovations, Phase 6, District Project 8423, to Pacific
Trenchless, Inc., the lowest responsive and responsible bidder, and
Page 2 of 6
POSITION PAPER
Board Meeting Date: March 17, 2016
subject. AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE
GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT
TO SUBMITTAL REQUIREMENTS WITH PACIFIC TRENCHLESS, INC.
FOR THE CONSTRUCTION OF THE NORTH ORINDA SEWER
RENOVATIONS, PHASE 6, DISTRICT PROJECT 8423
3. Authorize the General Manager to execute the Contract Documents subject to
SUBMITTAL requirements.
Attached Supportinq Document(s):
1. Project Location Map
2. Summary of Bids
3. Post-Bid I Preconstruction Estimate
Page 3 of 6
Q Project Areas
€.
e
CPeek
.A
s
--
Rd "e
�
T
AP ;
Y ttFr j N,.
;
_2-
q
D24 �-
ptA t 0 s M
t � ,
.. 0ZL-
n
r
-Y
Lafayette
Reservoir
i Ul
Its
n
e
a / 9
t .�
E `
4
d
i
z
,
of
�O
:
M
q
N
e
€ 't
0 2,500 5,000
a �
a Feet
Central Contra Costa
North Orinda Sewer Renovation Phase 6 Attachment
d !
Sanitary District District Project 8423 1
zn
�^ Project Location
Z
Page 4 of 6
ATTACHMENT 2
NORTH ORINDA SEWER RENOVATIONS, PHASE 6
DISTRICT PROJECT 8423
SUMMARY OF BIDS
PROJECT NO.: 8423 DATE: MARCH 1, 2016
PROJECT NAME: NORTH ORINDA SEWER RENOVATIONS, PHASE 6
PROJECT LOCATION: NORTH ORINDA, CA
NO. OF ADDENDA: 0 ENGINEER ESTIMATE: $2,400,000
NO. BIDDER BID PRICE
1 Pacific Trenchless, Inc.
Oakland, CA $1,967,491*
2 Bay Pacific Pipelines, Inc. $2,368,855
Novato, CA
3 K. J. Woods Construction, Inc.
San Francisco, CA $2,378,000
4 Precision Engineering, Inc.
San Francisco, CA $2,584,150
5 Ranger Pipelines, Inc.
San Francisco, CA $2,880,755
* Recalculated price based on District review.
BIDS OPENED BY/s/ Elaine R. Boehme, CMC DATE: March 1, 2016
. Page 5 of 6
ATTACHMENT 3
NORTH ORINDA SEWER RENOVATIONS, PHASE 6
DISTRICT PROJECT 8423
POST-BID / PRECONSTRUCTION ESTIMATE
No. Item Description Amounts %
Construction
Cost
1. CONSTRUCTION
a. Construction Contract $1,967,491
b. Contingency at 15% $295,009
c. Permit $40,000
SUBTOTAL-CONSTRUCTION COST $2,302,500 100%
2. CONSTRUCTION MANAGEMENT
a. District Forces
-Construction Management(Resident $405,000
Engineer, Inspection, Survey)
- Public Relations $15,000
- Right of Way $15,000
b. Consultants
- Material Testing $15,000
-Geotechnical and Arborist $10,000
SUBTOTAL-CONSTRUCTION MANAGEMENT $460,000 20%
3. PREBID EXPENDITURES
a. Engineering (Design, Survey, Drafting) $550,000
SUBTOTAL- PREBID EXPENDITURES $550,000 24%
4. TOTAL ESTIMATED PROJECT COST $3,312,500
Page 6 of 6