HomeMy WebLinkAbout09.c. Award contract for Lafayette Sewer Renovations, Phase 10, District Project 8426, to K. J. Woods Construction, Inc. Central Contra Costa Sanitary District
p BOARD OF DIRECTORS . C
POSITION PAPER
Board Meeting Date: March 17, 2016
Subject., AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE
GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS
SUBJECT TO SUBMITTAL REQUIREMENTS WITH K. J. WOODS
CONSTRUCTION, INC. FOR THE CONSTRUCTION OF THE
LAFAYETTE SEWER RENOVATIONS, PHASE 10, DISTRICT
PROJECT 8426
Submitted By. Initiating Dept/Div.:
Nancy A. Molina, Associate Engineer Engineering and Technical
Services/Capital Projects
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
S. Mestetsky—Senior Engineer
E. Lopez—Capital Projects Division Manager
JM. Petit—Director of Engineering and Technical Services Roger S.Bailey
g 9 General Manager
ISSUE: On February 25, 2016, four (4) sealed bids were received and opened for the
construction of the Lafayette Sewer Renovations, Phase 10, District Project 8426. The
Board of Directors must award the contract or reject bids within 50 days of the bid
opening. Authorize the General Manager to execute the Contract Documents subject to
SUBMITTAL requirements.
BACKGROUND: Lafayette Sewer Renovations, Phase 10, is part of the ongoing
Collection System Renovation Program. The work aligns with the District's Strategic
Plan, specifically Goal No. 6, which is "Maintain a Reliable Wastewater Infrastructure."
This project will renovate approximately 9,000 linear feet of 6-, 8-, 10-, 12-, and 15-inch
sewer lines located within the public rights-of-way, easements, and near creeks. The
project location map is identified in Attachment 1.
District staff prepared the plans and specifications for the project. The Engineer's
estimate for construction is $2,540,000. This project was advertised on February 8 and
12, 2016. Four (4) sealed bids ranging from $2,148,000 to $2,869,000 were received
and publicly opened on February 25, 2016. The Engineering Department conducted a
technical and commercial review of the bids and determined that K. J. Woods
Construction, Inc. is the lowest responsive bidder with a bid amount of$2,148,000. A
summary of bids received is shown in Attachment 2. The District will administer the
construction contract and will provide contract administration, inspection, survey, office
engineering, and submittal review.
CEQA: Staff has concluded that this project is exempt from CEQA under District CEQA
Guidelines Section 15302, because it involves replacement of existing sewer facilities at
substantially the same locations and with the same purpose and level of activity as the
facilities being replaced. Any capacity increases are for non-growth inducing, wet
weather purposes. This project also is exempt under District CEQA Guidelines
Page 1 of 6
POSITION PAPER
Board Meeting Date: March 17, 2016
Subject. AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL
MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO
SUBMITTAL REQUIREMENTS WITH K. J. WOODS CONSTRUCTION, INC.
FOR THE CONSTRUCTION OF THE LAFAYETTE SEWER RENOVATIONS,
PHASE 10, DISTRICT PROJECT 8426
Section 15061(b)(3), since it can be seen with certainty that there is no possibility that
the activity in question may have a significant effect on the environment. This certainty
is based on the District's past experience with numerous sewer construction projects of
this nature, the relatively short distances involved, and the District's mitigating
construction specifications. These specifications are standardized general and special
conditions that are made part of the project bid documents to address environmental
considerations, such as protecting trees and riparian areas, as well as compliance with
applicable federal, state, county, district, municipal and local laws, ordinances, orders,
and regulations. Approval of this project will establish the Board of Directors'
independent finding that this project is exempt from CEQA.
ALTERNATIVES/CONSIDERATIONS: Reject all bids, which is not recommended.
FINANCIAL IMPACTS: The total project cost of the Lafayette Sewer Renovations,
Phase 10, is anticipated to be $3,530,000, including design, bid price, contingency, and
construction management. This project is included in the Fiscal Year (FY) 2015-16 CIB
on page CS-16 showing a total project budget of$3,755,000. Staff has conducted a
budget analysis of the FY 2015-16 Collection System Program budget and concluded
that adequate funds are available for this project.
COMMUNITY allTREACH: The District held a public meeting on January 21, 2016, at
the District's Collection System Operations Department office in Walnut Creek to assist
with any questions or concerns by the residents along the alignment.
COMMITTEE RECOMMENDATION: The Engineering and Operations Committee
reviewed this project at the meeting on March 8, 2016, and recommended award of the
project.
RECOMMENDED BOARD ACTION: Staff recommends the following:
1. Find that the project is exempt from CEQA,
2. Award a construction contract in the amount of$2,148,000 for the construction of
the Lafayette Sewer Renovations, Phase 10, District Project 8426, to
K. J. Woods Construction, Inc., the lowest responsive and responsible bidder,
and
3. Authorize the General Manager to execute the Contract Documents subject to
SUBMITTAL requirements.
Page 2 of 6
POSITION PAPER
Board Meeting Date: March 17, 2016
subject. AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL
MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO
SUBMITTAL REQUIREMENTS WITH K. J. WOODS CONSTRUCTION, INC.
FOR THE CONSTRUCTION OF THE LAFAYETTE SEWER RENOVATIONS,
PHASE 10, DISTRICT PROJECT 8426
Attached Supporting Documents:
1. Project Location Map
2. Summary of Bids
3. Post-Bid/Preconstruction Estimate
Page 3 of 6
3
tp A r" AIM24
MA
10 x�n
W.. F
r
—= 1 FOW sr $ xanAr
rias u JfxllSd
OYOtlrNOYO. Y6W}ian ISO
40OTggyxOp WK a woo AVE �.
�. xn�xlan 4i
24
M � g
{
Y
W
v
Em x VALL
no r"4
a
V
a S $ �Z_�
o 0 1200 2100
9 �_ , FEET
Project Areas
{
Central Contra Costa Attachment
Sanitary District Lafayette Sewer Renovation Phase 10
District Project 8426 1
N
o ;
96,
Location Map
Page 4 of 6
ATTACHMENT 2
LAFAYETTE SEWER RENOVATIONS, PHASE 10
DISTRICT PROJECT 8426
SUMMARY OF BIDS
PROJECT NO.: 8426 DATE: FEBRUARY 25, 2016
PROJECT NAME: LAFAYETTE SEWER RENOVATIONS, PHASE 10
PROJECT LOCATION: LAFAYETTE, CA
NO. OF ADDENDA: 0 ENGINEER'S ESTIMATE: $2,540,000
NO. BIDDER BID PRICE
1 K. J. Woods Construction, Inc. $2,148,000
San Francisco, CA 94124
2 JMB Construction, Inc. $2,448,402
South San Francisco, CA 94080
3 Cratus, Inc. $2,625,546
San Francisco, CA 94124
4 A-S Pipelines, Inc. $2,869,000
Pittsburg, CA 94565
BIDS OPENED BY/s/ Elaine R. Boehme, CMC DATE: February 25, 2016
Page 5 of 6
ATTACHMENT 3
LAFAYETTE SEWER RENOVATIONS, PHASE 10
DISTRICT PROJECT 8426
POST-BID / PRECONSTRUCTION ESTIMATE
No. Item Description Amounts %
Construction
Cost
1. CONSTRUCTION
a. Construction Contract $2,148,000
b. Contingency at 15% $322,000
c. Permit $40,000
SUBTOTAL-CONSTRUCTION COST $2,510,000 100%
2. CONSTRUCTION MANAGEMENT
a. District Forces
-Construction Management(Resident $395,000
Engineer, Inspection, Survey)
- Public Relations $10,000
-Right of Way $10,000
b. Consultants
-Material Testing $20,000
-Geotechnical and Arborist $10,000
SUBTOTAL-CONSTRUCTION MANAGEMENT $445,000 18%
3. PREBID EXPENDITURES
a. Engineering (Design, Survey, Drafting) $575,000
SUBTOTAL- PREBID EXPENDITURES $575,000 23%
4. TOTAL ESTIMATED PROJECT COST $3,530,000
Page 6 of 6