Loading...
HomeMy WebLinkAbout04. (Handout) PowerPoint Presentation of Sub 16 Replacement Project4. HEADWORKS SCREENING UPGRADE AND SUB 16 SWITCHGEAR REPLACEMENT January 12, 2016 Engineering and Operations Committee Meeting Brad Leidecker, Associate Engineer Central Contra Costa Sanitary District Background and Drivers • Switchgear Installed with Headworks Project, 1993 • Switchgear Feeds Headworks & Influent Pumps • Switchgear Reliability — Parts Availability: Short Production Run, Obsolete Parts — Reconditioning Service: Few Shops Can Service — Breaker Tests: Several Breakers Failed Testing — Significant Corrosion of Components • Sub 16 Switchgear Replacement (DP 7324): — Remove and Replace the Existing Switchgear including Modifications to the Existing Building as Required Sub 16CD Switchgear Sole -Source Pre -Purchase • Compatibility with Existing Equipment, Minimization of Supplies of Spare Parts, Efficiency of Repair and Maintenance • Safety, Training and Productivity • Retrofit Constraints • Schedule K Construction Cost Estimate Contractor Bid AM 000 Construction Subtotal $2400,000 Construction Contingency $200,000 Construction Total $2,300„000 Tentative Schedule Contractor Bid Opening May 2, 2016 E&O Committee May 10, 2016 Board Meeting May 19, 2016 Contractor Notice to proceed lune 2016' Switchgear Replacement Construction October 2016 Complete � ` F E