HomeMy WebLinkAbout07.a.1) Comprehensive Wastewater Master Plan UpdateReal Estate & Environmental Planning (REEP) Committee Update
Central Contra Costa Sanitary District
Comprehensive Wastewater Master Plan
December 18, 2015
Comprehensive Wastewater Master Plan Highlights
• The Master Plan Project is on track to be completed on time and on budget.
• Master Plan Workshop with District staff on Universe of Alternatives for the Wastewater Treatment
Plant Master Plan
• Finalized Goals and Levels of Service at 10/3/15 Board Meeting
• Recent Deliverables: Draft Flow and Loads TM, Draft Collection System Existing Facilities TM
• Upcoming Deliverables: Final Draft WWTP Existing Facilities TM, Final Draft Flow and Loads TM, Final
Draft Basis of Costs TM, Draft Parcel Loading TM, Draft RD 1/1 Loading Process, Draft WWTP Condition
Assessment TM, Draft Collection System Asset Management TM, Draft Data Flow and Business
Processes TM, Draft WWTP Process Performance and Capacity TM
Wastewater Treatment Plant Master Plan Update
• Work Completed
Task
Task
Completed Work Highlights
• Meetings
1
Planning Objectives and Approach
• Update project schedules
• Presented Levels of Service at REEP Committee Oct.
13 and 16, and Board Meeting Nov. 5
2
QA/QC Plan
• Performed QA/QC on TM deliverables
• Presented at Oct. 15 Board Meeting
• Coordination with FM3 for customer research/focus
groups
3
Community Outreach
• Conducted key stakeholder interviews and
scheduled additional interviews
• Further developed questionnaires and developed
interview themes for final stakeholder interview
reports
4
Evaluate Existing Information
• Submitted Draft TM TP -5 Existing Facilities
5
Flow and Load Analysis
• Submitted Draft TM TP -6 Flows and Loads
• Compiled data for BioWin treatment plant process
model
6
Existing Facilities Analysis
• Began evaluation of treatment plant hydraulic
model
• Began baseline greenhouse gas evaluation
• Began baseline energy evaluation
Real Estate & Environmental Planning (REEP) Committee Update
Central Contra Costa Sanitary District
Comprehensive Wastewater Master Plan
December 18, 2015
Task
Task
Completed Work Highlights
• Reviewed past repdrts related to capacity and
performance
• Completed 2 -day Condition Assessment
Orientation/Walk-Through
7
Condition Assessments
• Completed Mechanical, Electrical, and Piping
Condition Assessment Workshops
• Began condition assessment summaries
8
Recycled Water Facilities Evaluation
• Coordination on full-scale filter capacity testing plan
9
Identify and Evaluate Regulatory Scenarios
• Reviewed preliminary regulatory drivers
10
Evaluate Immediate and Future Needs
• None
• Reviewed potential technologies with Staff
11
Identify and Develop Project Alternatives
• Performed staff universe of alternatives workshop
on 12/9/15
12
Develop Recommended Master Plan Program
• None
13
Financial Analysis
• None
14
Research and Development
• None
15
1 Prepare Master Plan Documents
• None
16
1 Environmental Documentation
• Continued coordination re: CEQA/EIR
• Project Schedule: See attached Schedule (as of 12/11/2015)
• Total % Complete: 16% (Period: June 16, 2015 —October 31, 2015)
• Total % Expended: 15% (Period: June 16, 2015 — October 31, 2015)
ID Task Name 2016 2017
eJun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Seo Oct Nov Dec Jan Feb Mar Apr May Jun
1 1 Planning Objectives and Approach
2 1.1 GTM I Project Control Plan and QA/QC Plan t .t
3 1.2 GTM 2 - Project Goals/Objectives & Decision Criteria t
4 1.3 GTM 3 - Basis of Costs tftox
5 1.4 Kickoff Meeting
6 1.5 Bi-monthly Conference Calls t
7 1.6 Monthly Progress Meetings t asy i��- = Y:as •- y ��:;yr_,._ ,-.x,c� . ss,:> s.Y "y _rr _ �: -- 7
8 2 QA/QC - Ongoing, scheduled into other tasks -+ ss — —. _ �� �c-� r: r _ z,=qua_ , r .•=-t
t-=-tea_,...• _ ._ _ _� .,_�- �_r -�
9 3 Community Outreach
10 3.1 GTM 4 - Outreach Plan
11 3.2 Outreach Implementation Activities,,
12 4 Evaluate Existing Information
13 4,1 TPTM 5 Existing Facilities t_. �;_. _ •ct.a
14 5 Flow and Loads
15 5.1 TPTM 6 - Historical and Projected Flow and Loads
16 6 Existing Facilities
17 6.1 TPTM 7 - Treatment Process Performance and Capacity
18 6.2 TPTM 8A - Vulnerability t;=
19 6.3 TPTM 8B - Resiliency 1
20 7 Condition Assessment
21 7.1 TPTM 9 -Condition Assessment
22 8 Recycled Water
23 8.1 TPTM 10 - Recycled Water Facilities s
24 9 Regulatory
25 9.1 TPTM 11 - Existing and Future Regulations t.- -�
26 10 Immediate/Future Needs
27 10.1 TPTM 12 - Immediate and Future Needs
28 11 Project Alternatives
29 11.1 TPTM 13 Alternatives Identification and Analysis 4
30 11.2 Alternatives Worksops (Staff) + 04/13
31 11.3 Alternatives Workshop (Board) 06/23
32 12 Recommended MP Program/CIP
33 12.1 TPTM 14 - Recommendations 4
34 12.2 Recommendations/CIP Workshops (Staff) 09114
35 12.3 Recommendations/CIP Workshops (Board) j 11/10
36 13 Financial Analysis
37 14 Research and Development
38 15 Master Plan Documents
39 15.1 Draft Report
40 15.2 Final Report and Executive Summary
41 16 Environmental Documentation
42 16.1 TPTM 15 - Environmental Documentation Strategy
Task _ - -.. - Project Summary Manual Task Start•only [ Deadline Baseline Milestone
Project: TPMP_PrcjectSchedule spire _ inactive Task Duration-only E Finish-only 1 Critical Baseline Summary t t
Date: Fri 12/11/15 ..__ 11 1 1_ _ - . _ . _
Page 1
Real Estate & Environmental Planning (REEP) Committee Update
Central Contra Costa Sanitary District
Comprehensive Wastewater Master Plan
December 18, 2015
Collection System Master Plan Update
• Work Completed
Task
Task
Completed Work Highlights
• Meetings
1
Planning Objectives and Approach
• Update Project Schedules
. Presented Levels of Service at REEP Committee Oct.
13 and 16, and Board Meeting Nov. 5
2
QA/QC Plan
• Performed QA/QC on TM deliverables
• Presented at Oct. 15 Board Meeting
• Coordination with FM3 for customer research/focus
groups
3
Community Outreach
• Conducted key stakeholder interviews and
scheduled additional interviews
• Further developed questionnaires and developed
interview themes for final stakeholder interview
reports
4
Evaluate Existing Information
• Submitted Draft CS TM -5 Existing Facilities
• InfoWorks Model Configuration
• Coordinated with District staff on flow meter site
investigations and permits with V&A
5
Hydraulic Model
• Continued coordination on available HTE and parcel
data requests
• Coordination of pump station data and operational
parameters
6
Develop Land Use Planning Information
• Coordinating with District on acquiring available City
and County GIS layers with land use information.
7
Rainfall Dependent 1/1
• None
8
Long Term Flow Monitoring
• None
• Completed data mapping workshops with
Engineering and CSO staff for InfoMaster
• Completed business mapping workshops with
9
Infrastructure Asset Management
Engineering and CSO staff for InfoMaster
• Continued development of pipeline degradation
model
• Coordination with District on remaining pump
station condition assessments
10
Identify and Evaluate Regulatory Scenarios
• None
Real Estate & Environmental Planning (REEP) Committee Update
Central Contra Costa Sanitary District
Comprehensive Wastewater Master Plan
December 18, 2015
Task
Task
Completed Work Highlights
11
Resiliency Adaptation Plan
• None
12
Optimization
• None
13
Evaluate System Hydraulic Performance
• Submitted Draft PICS/MOST modeling results of
projected peak hourly flow
14
Develop Recommended Master Plan Program
• None
15
Financial Analysis
• None
16
Prepare Master Plan Documents
• None
17
Environmental Documentation
• Continued coordination re: CEQA/EIR
• Project Schedule: See attached Schedule (as of 12/11/2015)
• Total % Complete: 17% (Period: June 16, 2015 —October 31, 2015)
• Total % Expended: 16% (Period: June 16, 2015 —October 31, 2015)
ID Name
2016
1 Evaluate Existing Information Jun Jul Aug Sep Qct NO Dec Jar Feb Mar Apr May Jun Jul Aug Sep Oct
2 OSTM 5: Existing Facilities �®
3 Hydraulic Model
4 Flow Monitoring and Report?.,-n-aur.-.,,.xs:,_::-ge,—zrs�'.' 5'� �a=n�"r..».�•t•.:s: - r-T.c.;a�u'>z- y-,Sns_C=n_:_,:P:^nv:
5 Model Calibration to 2015/2016 Flow Monitoring Data
6 CSTM 6: Flow Monitoring
7 CSTM 7: Parcel Loading
8 CSTM 8: RDI/I Loading Process
9 CSTM 9: Model Build & OA/QC
10 CSTM 10: Model Implementation
11 Develop Land Use Planning Information
12 CSTM 11: Land Use
13 Rainfall Dependent I&I
14 Program development
15 CSTM 12: RDI/I Analysis Reduction
16 Long Term Flow Monitoring
17 Strategy and Plan
18 CSTM 13: Long -Term Flow Monitoring
19 Infrastructure Management
20 CSTM 14: Collection System Asset Management
21 CSTM 15: Data Flow and Business Process Recommendations
22 Asset Management Workshops (Staff)
23 Asset Management Workshops (Board)
24 Identify and Evaluate Regulatory Scenarios
25 CSTM 16: Future Regulatory Scenarios
26 Resiliency Adaptation Plan
27 CSTM 17: Resiliency
28 Optimization
29 CSTM 18: Operation Optimization
30 Evaluate System Hydraulic Performance
31 CSTM 19: Base Flow
32 CSTM 20: Design Criteria
33 CSTM 21: Capacity
34 Alternatives Workshops (Staff) - TBD
35 Alternatives Workshops (Board) - TBD
36 Develop Recommended Master Plan Program
37 CSTM 22: Recommendations
38 Recommendations Workshops (Staff)
39 Recommendations Workshops (Board)
40 Financial Analysis
41 Prepare Master Pian Documents
42 Draft Report
43 Final Report and Executive Summary
44 Environmental Documentation
45 CSTM 23 - Environmental Documentation Strategy
ProjectCSMP_Project5chedute Task summary
Date Fri 12/11/15 spla ........... Prolect Summary
Milestone ♦ Namo Task
2017
Nov Dec Ian _ - Feb Mar Apr
♦ 09134
t� 11/10
L�
Inxt. MikRone Duratimonly Stam * C External Milestone Critical SPlit
I ' Inactive Summary Manual Summary Rdkup F"sho* J Death i Progress
Manual Task MMUTA Smnary :moi External Tasks Critical Manual Progress
Page 1