Loading...
HomeMy WebLinkAbout03.g. Award construction contract to D.W. Nicholson Corp for the Plant Control System UPS Replacement, DP 6171Central Contra Costa Sanitary District BOARD OF DIRECTORS r POSITION PAPER Board Meeting Date: December 17, 2015 Subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH D.W. NICHOLSON CORPORATION FOR THE PLANT CONTROL SYSTEM UPS REPLACEMENT REBID, DISTRICT PROJECT 6171 Submitted By. Initiating Dept. /Div.: Clint Shima, Senior Engineer Engineering and Technical Services /Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: E. Lopez — Capital Projects Division Manager A.. j •+�: JM. Petit — Director of Engineering and Technical Services Roger S. Bailey General Manager ISSUE: On December 10, 2015, four (4) sealed bids were received and opened for the construction of the Plant Control System UPS Replacement Rebid, District Project 6171. The Board of Directors must award the contract or reject bids within 50 days of the bid opening. Authorize the General Manager to execute the Contract Documents subject to SUBMITTAL requirements. BACKGROUND: The Capital Improvement Budget (CIB) Priority Ranking for this project is critical and the work aligns with the District's Strategic Plan, specifically Goal No. 6, which is "Maintain a Reliable Wastewater Infrastructure." This project will install a new uninterruptible power supply (UPS) for the treatment plant controls system. The system is critical for supplying stable power to sensitive control equipment and will replace the existing UPS that is over twenty years old and reaching the end of its useful life. Replacement is being recommended since the existing UPS requires an expensive overhaul and a new UPS is highly favorable when compared to the cost for replacement batteries. In addition, the new UPS design will allow for additional reliability with future interconnection and bypass capabilities for future replacement or expansion. The new equipment includes two 30 -kW / 50 -kW frame UPS modules with rectifiers, inverters, battery chargers, static bypass, and control panels. The project scope involves the procurement of the equipment and electrical infrastructure work. The project work area is in the Pump and Blower Building as shown in Attachment 1. District staff prepared the plans and specifications for the project. MWH performed a technical review of the project. The Engineer's estimate for construction is $375,000. This project was advertised on November 25 and December 2, 2015. Four sealed bids ranging from $253,000 to $360,302 were received and publicly opened on December 10, 2015. Page 1 of 5 POSITION PAPER Board Meeting Date: December 17, 2015 Subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH D.W. NICHOLSON CORPORATION FOR THE PLANT CONTROL SYSTEM UPS REPLACEMENT REBID, DISTRICT PROJECT 6171 The Engineering Department conducted a technical and commercial review of the bids and determined that D.W. Nicholson Corporation is the lowest responsive bidder with a bid amount of $253,000. A summary of bids received is shown in Attachment 2. District staff will administer the construction contract and will provide contract administration, office engineering, and submittal review. Inspection will be performed by staff with specialty assistance from one of the District's as- needed inspection companies. CEQA: Staff has concluded that this project is exempt from the California Environmental Quality Act (CEQA) under District CEQA Guidelines Section 15302, because it involves alteration of an existing sewer facility at substantially the same locations and with the same purpose and level of activity as the facilities being replaced. Any capacity increases are for non - growth inducing, wet weather purposes. Approval of this project will establish the Board of Directors' independent finding that this project is exempt from CEQA. ALTERNATIVES /CONSIDERATIONS: Reject all bids, which is not recommended. FINANCIAL IMPACTS: The funds required to complete this project, as shown in Attachment 3, are $356,000. The total project cost of the Plant Control System UPS Replacement is anticipated to be $406,000, which includes design, rebid costs, bid price, construction, contingency, and construction management. This project is being funded under the Equipment Replacement Project included in the Fiscal Year 2015 -16 CIB on page TP -32 with a total estimated project budget of $2.4 million. Staff has conducted a budget analysis of the Treatment Plant Program budget and concluded that adequate funds are available for this project. COMMITTEE RECOMMENDATION: The Engineering and Operations Committee reviewed this subject at the meeting on November 10, 2015 and December 9, 2015, and recommended approval to award the construction contract. Page 2 of 5 POSITION PAPER Board Meeting Date: December 17, 2015 Subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH D.W. NICHOLSON CORPORATION FOR THE PLANT CONTROL SYSTEM UPS REPLACEMENT REBID, DISTRICT PROJECT 6171 RECOMMENDED BOARD ACTION: Staff recommends the following: 1. Find that the project is exempt from CEQA, 2. Award a construction contract in the amount of $253,000 for the construction of the Plant Control System UPS Replacement Rebid, District Project 6171, to D.W. Nicholson Corporation, the lowest responsible and responsive bidder, and 3. Authorize the General Manager to execute the Contract Documents subject to SUBMITTAL requirements. Attached Supporting Documents: 1. Project Location Map 2. Summary of Bids 3. Post -Bid / Preconstruction Estimate Page 3 of 5 PROJECT LOCATION MAP r � N FW � o ZW ertho HQ9 ntra! Contra Costa Sanitary District 0 �i UPS REPLACEMENT District Project 6171 1 Martinez. Callfomla Page 4 of 5 0 ATTACHMENT 2 PLANT CONTROL SYSTEM UPS REPLACEMENT REBID DISTRICT PROJECT 6171 SUMMARY OF BIDS PROJECT NO.: 6171 DATE: DECEMBER 10, 2015 PROJECT NAME: PLANT CONTROL SYSTEM UPS REPLACEMENT REBID PROJECT LOCATION: PUMP AND BLOWER BUILDING NO. OF ADDENDA: 0 ENGINEER'S ESTIMATE: $375,000 NO. BIDDER BID PRICE 1 D.W. Nicholson Corporation $253,000 Hayward, CA 94540 2 Blocka Construction, Inc. $304,000 Fremont, CA 94538 3 Aztec Consultants $315,900 San Ramon, CA 94583 4 Big Valley Electric $360,302 Stockton, CA 95215 BIDS OPENED BY: /s/ Elaine E. Boehme, CMC DATE: 12/10/15 Page 5 of 5 ATTACHMENT 3 PLANT CONTROL SYSTEM UPS REPLACEMENT REBID DISTRICT PROJECT 6171 POST -BID / PRECONSTRUCTION ESTIMATE No. Item Description Amounts % Construction Cost 1. CONSTRUCTION a. Base Construction Contract $253,000 b. Contingency 15% $38,000 SUBTOTAL — CONSTRUCTION $291,000 100% 2. CONSTRUCTION MANAGEMENT a. District Forces - Construction Management, Engineering $30,000 - POD Coordination $25,000 b. Consultants - Inspection $15,000 SUBTOTAL - CONSTRUCTION MANAGEMENT $70,000 24.1% 3. PREBID EXPENDITURES a. District Engineering: Planning, Design and POD Coordination, and Rebid $40,000 b. Peer Review (MWH) $5,000 SUBTOTAL — ESTIMATED EXPENDITURES $45,000 15.5% 4. TOTAL PROJECT COST $406,00 5. FUNDS BUDGETED TO DATE* $50,00 6. ADDITIONAL FUNDS NEEDED TO COMPLETE PROJECT (Line 4 - Line 5) 3 *Project is being funded from Treatment Plant Equipment Replacement, DP 7326 Page 5 of 5