HomeMy WebLinkAbout07.a. Approve Final Goals and Levels of Service re Comprehensive Wastewater Master Plan (CWMP)Central Contra Costa Sanitary District 7. a •
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: December 3, 2015
Subject: APPROVE FINAL GOALS AND LEVELS OF SERVICE FOR THE
COMPREHENSIVE WASTEWATER MASTER PLAN
Submitted By: Initiating Dept. /Div.:
Dan Frost, Senior Engineer Engineering & Technical Services /
Planning & Development Services
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
D. Gemmell — Planning & Development Services Division Mgr.
JM. Petit — Director of Engineering & Technical Services ocwl Roger S. Bailey
General Manager
ISSUE: Board Policies require the review and approval of the Board of Directors.
BACKGROUND: It is critical for the District to establish goals and levels of service
(LOS) that will be used as the basis for identifying and evaluating implementation
strategies in the Comprehensive Wastewater Master Plan (CWMP). Those strategies
will be a combination of existing and proposed policies, programs, and capital
improvement projects. As strategies are developed that require Board approval, District
staff will present those proposed strategies to the Board. The goals and LOS
established for the CWMP will be closely coordinated with the development of the next
District Strategic Plan.
The proposed Draft Goals and LOS were presented to the Board at the November 5,
2015 meeting. Subsequently, the Board Members were each provided an electronic
copy of the draft Goals and LOS so they could provide their separate comments to staff.
Those comments now have been reviewed by staff and are reflected in the attached
Final Draft Goals and LOS, each of which has been refined to ensure that they meet the
following requirements:
• Specific — each LOS should target a specific area of improvement
• Measurable — each LOS should include an indicator of progress
• Assignable — each LOS should be assignable to who will accomplish it
• Realistic — each LOS should be within budget and time constraints
• Time - related — each LOS should include deadlines for results
ALTERNATIVES /CONSIDERATIONS: The Board could request that additional edits
and changes be made to the proposed Final Goals and LOS for the CWMP.
FINANCIAL IMPACTS: None by this action.
C: \Users \danderson\AppData \Local \Microsoft \Windows \Temporary Internet Files\ Content .Outlook \IM9F5ZMU \12 -3 -15 PP CWMP
Goals LOS.docx Page 1 of 2
POSITION PAPER
Board Meeting Date: December 3, 2015
subject: APPROVE FINAL GOALS AND LEVELS OF SERVICE FOR THE
COMPREHENSIVE WASTEWATER MASTER PLAN
COMMITTEE RECOMMENDATION: The Real Estate, Environmental & Planning
Committee reviewed and provided comments on the Draft Goals and Levels of Service
at the October 13, 2015 and October 16, 2015 Committee meetings.
RECOMMENDED BOARD ACTION: Approve Final Goals and Levels of Service for
the Comprehensive Wastewater Master Plan.
Attached Supporting Document(s):
I. Table: Final Draft CWMP Goals and Levels of Service, including strikeout version
2. Presentation: CWMP Goals and Levels of Service
C:\ Users \dandersonWppData \Local \Microsoft \Windows \Temporary Internet Files\ Content .Outlook \IM9F5ZMU \12 -3 -15 PP CWMP
Goals LOS (2).docx Page 2 of 2
Comprehensive Wastewater Master Plan (CWMP) - Goals and Levels of Service
ATTAnuee1-_!uT
CWMP
Goals
Levels of Service (LOS)
Strive to meet regulatory requirements
Comply with local, state and federal regulatory requirements.
Critical facilities will be on -line within prescribed targets after catastrophic events (e.g., sudden
1
failures, earthquakes, floods, fire, acts of terrorism, etc.).
Meet sanitary sewer overflow (SSO) rate of no more than 3.5 (2.75) SSOs per 100 miles
per year (within 5 years).
Be a fiscally sound and effective water sector utility
Develop a cost effective program to recycle water in coordination with local water
agencies to achieve "zero" discharge (within 15 years). The program must have a
benefit/costs ratio of at least one or greater.
Develop a program that maximizes energy efficiency and self- sufficiency that has a
benefit/costs ratio of at least one or greater (within 5 years).
2
Maximize long -term resource recovery projects that have a benefit/costs ratio of at least
one or greater (within 5 years).
Provide value -added service in all Capital Improvement Budget (CIB) programs and
activities while maintaining long -term economic stability.
Evaluate new opportunities for additional funding sources for the Capital Improvement
programs.
Embrace
technology, innovation and environmental sustainability
Reduce adverse impacts on the environment and the public through sustainable practices that
minimize waste, maximize resources recovery, and embrace innovation.
3
Implement reliable, state -of- the -art software and information technology (IT) services that are
consistent with the industry standard to support all of the District's operations.
Incorporate climate change adaptation and resiliency into District programs and projects.
Provide exceptional customer service
Be a good neighbor and community partner.
Provide recycled water (e.g., residential fill stations and commercial hydrants) aligned with
service area customers' demands.
4
Develop a for assessing for District
process customer satisfaction, expectations services, and
desire for general information.
Develop a public education outreach program that provides pollution prevention education and
is aligned with the customer's desire for general information.
Maintain a reliable infrastructure
Implement an Asset Management Program for all District facilities based upon triple bottom
line and business case evaluations.
5
Establish a process for periodic updates to the Capital Improvement Plan (CIP).
Address site access, security and potential impacts to District facilities and operations due to
upply chain disruptions (e.g., chemicals, power, man -made disasters).
FINAL DRAFT Revised December 3, 2015
�IIComprehensive Wastewater Master Plan (CWMP) -Goals and Levels of Servicea° "�
GernpFehensiye WastewateF Master- Plan (GWMP) Goals and Levels of
cue
CWMP
Goals
Levels of Service (LOS)
Strive to meet regulatory requirements Meet existing and - easenably foreseeable
MY l Vl -4 �GtiFAT�
Comply with local, state and federal regulatory requirements.
1
Critical facilities will be on -line within 7-2 ",�,ours of prescribed targets after catastrophic events
(e.g., sudden failures, earthquakes, floods, fire, acts of terrorism, etc.).
Meet sanitary sewer overflow (SSO) Fequirementsrate to maintain no more than 3.5 (2.75)
SSOs per 100 miles per year (within 5 years).
stabilityBe a fiscally sound and effective water
sector utility
Develop a cost effective program to utilize recycled water in coordination with local water
agencies to achieve "zero" discharge (within 15 years). The program to have the
a benefit/costs- ratio te the maximum exteRt feasible of at least one or greater.
2
Develop a program that maximizes energy efficiency and self- sufficiency that has
a benefit/costs ratio of at least one or greater (within 5 years).
Maximize long -term resource recovery projects that have a benefit /costs ratio of at least
one or greater (within 5 years).-
Provide value -added service in all Capital Improvement Budget (CIB) programs and
activities while maintaining long -term economic stability.
(Moved to Goal 3 below)-.Evaluate new opportunities for additional funding sources for
he Capital Improvement programs.
Be c leader an the .. astewate.. indus+r..Embrace technology, innovation and
environmental sustainability
Reduce adverse impacts on the environment and the public through sustainable practices that
minimize waste, maximize resources recovery, , impFeve the GemmuRity,
and embrace innovation.
3
. (Deleted as it is similar to
Goal 2 LOS 1
Implement reliable, state -of- the -art software and information technology (IT) services
that are consistent with the industry standard to support all of the District's operations.
Incorporate climate change adaptation and resiliency into District programs and projects.
Provide exceptional customer service
Be a good neighbor and community partner (e.g., minimize i,,,paGtG)
4
Provide recycled water (e.g.; residential plant -fill stations and commercial hydrants) aligned
with te- service area customer's demands.
Develop a process for assessing customer satisfaction, with -and expectations for District
Revised December 3NOVEMRED [, 2015
Revised December 3NOVEMBER 5, 2015
services, and desire for information.
Develop a eempFeheRE; ^ public education outreach program that provides pollution
prevention education and is aligned with the customer's desire for general information.
Maintain a reliable infrastructure
Develep Implement an Asset Management Program for all District facilities based upon
triple bottom line and business case evaluations.
5
Establish a process for periodic updates to the Capital Improvement Plan (CIP).
Address site access, ate- security and potential impacts to District facilities and operations due
o supply chain disruptions (e.g., chemicals, power), aman -made
isasters: .
Revised December 3NOVEMBER 5, 2015
Review of Goals and
Levels of Service for the
Comprehensive Wastewater
Master Plan
Jean -Marc Petit
Director of Engineering & Technical Services
December 3, 2015
Board Meeting
1', Central Contra Costa Sanitary District
CWMP GOALS*
• Goal 1: Strive to meet regulatory requirements
• Goal 2: Be a fiscally sound and effective water
sector utility
• Goal 3: Embrace technology, innovation and
environmental sustainability
• Goal 4: Provide exceptional customer service
• Goal 5: Maintain a reliable infrastructure
New Goals are based on recently adopted Revised Strategic Plan Goals (Adopted 11/6/15)
ATTACHMENT 2
M�
1
11/24/15
CPmprrAentivr Wastanvnrr Master Pl.n (CWMP) - Gml. and I.rvele.r5.ry
CYIYP
Oe,N
I...Y.YSrv)e.M1OS>
newt e.edernre.
1
Critical facilities will be on -line within prescribed targets after catastrophic events (e.g., sudden failures, earthquakes,
floods, fire, acts of terrorism, etc.).
arssrnw
prama,srr as2*sso.Perrmrow
).
YouJ,nddr..tl.,a,eer...brenipr
. eor. see... a.arwb ya,..r�000�sr.mr,r „�a )ew..a.
' bw.w.Yre•s.erarw(..a . r 1`+>r.n+).7ere wearrr m,.eiw.,
e.r r.ee wr bat an. a Pn.w.
. Pr•a•m era.rv.r,ew.naer �v rtl.Yy,Adasy ere re,
.rq err bW aro aron.w Prl.rr s y.a.).
Zbnp.emr
n..rt. neeMly pn>fO.YtNtrw., ..rrearca.0 nu. elM leertl
or pr.r (rare sywnl.
vr,..aeed.eav,.r n Y c,P.r.Wrwana. Br.ir (C6) PrePPm..rru
..n.e mrrn.r,p brv—eeeronc —ft
.rb row.PPa. nee. br..marrru�arp.oues. a v» orate bq,w.mwe
tr.re.rr..r.re.e.:.e.,ewr
Red..e.drn. +ro.� enw.,.+.nrrn nem. P,a.c e•erNr.,.n.r.d. w.m..• err
..a. r..e w...r..er.,r..,r.meA...a,.a..,.
3
rreb..era.b.ar.e..rr..ro..emrmn rtl.rbGV an..,rn... a
wN TS etsnb,tlb YNer D+ua'�
.sae pr,rb dri9.,deaf.e.n W ..brKry.,b Ormrct Preerenr.ro P.IS. >.
' arte,r.ewlq
iee a 9.ee rorrow,ro <ommuney mmr« �
Prords ncyerd weer (e.p, rsetlsr04 r. era,...,ro o.mrre2ei rrryaro) Nprrd war
,w.aa.nrn'd..rem
4
.. roe.., nr.r.e.ee oa.bm...e..mee, nP.d.mrr. ea ormra..�e.., ra
brdnrni.f >..n..
..,a.r sewn.,,.W.w� P.W ^ert pov,de. Pe.mer, Pnwmoe.?,OWm Yr0
nr.r.
J.b%Wde,rtn,eenr
en Mr lbrpnrr. Pw_ M J DW_ I. )— Iraee Wen tops tretbrn
.ro Eunr. m «Yrmm
5
,.ew.a an.e Weasebe»e.PS.v. .nrn Pw (GA
w.W.r...am,ro Pa.ro.l aa.d, b o.ev twab..ro.Pn.trlr due b
drb e,.,.a.s. .nrn.mee. wren.
�. �Fz' CD_
Goal 1
Strive to meet regulatory requirements
Comply with local, state and federal regulatory requirements.
1
Critical facilities will be on -line within prescribed targets after catastrophic events (e.g., sudden failures, earthquakes,
floods, fire, acts of terrorism, etc.).
Meet sanitary sewer overflow (SSO) rate of no more than 3.5 (2.75) SSOs per 100 miles per year (within 5 years).
Goal 2
11/24/15
Be a fiscally sound and effective water sector utility
Develop a cost effective program to recycle water in coordination with local water agencies to achieve "zero" discharge
(within 15 years). The program must have a benefit/costs ratio of at least one or greater.
3
Develop a program that maximizes energy efficiency and self- sufficiency that has a benefit/costs ratio of at least one or
greater (within 5 years).
standard to support all of the District's operations.
2
Incorporate climate change adaptation and resiliency into District programs and projects.
Maximize long -term resource recovery projects that have a benefit/costs ratio of at least one or greater (within 5 years).
Provide value -added service in all Capital Improvement Budget (CIB) programs and activities while maintaining long-
term economic stability.
Evaluate new opportunities for additional funding sources for the Capital Improvement programs.
M CD_
Goal 3
Embrace technology, innovation and environmental sustainabitity
Reduce adverse impacts on the environment and the public through sustainable practices that minimize waste, maximize
resources recovery, and embrace Innovation.
3
Implement reliable, state- of- the-an software and information technology (IT) services that are consistent with the industry
standard to support all of the District's operations.
Incorporate climate change adaptation and resiliency into District programs and projects.
Goal 4
11/24/15
Provide exceptional customer service
Be a good neighbor and community partner.
5
Provide recycled water (e.g., residential fill stations and commercial hydrants) aligned with service area customers' demands,
4
Develop a process for assessing customer satisfaction, expectations for District services, and desire for general information.
Develop a public education outreach program that provides pollution prevention education and is aligned with the customers
desire for general information.
'BCD_
Goal 5
Maintain a reliable infrastructure
Implement an Asset Management Program for all District facilities based upon triple bottom line and business case evaluations.
5
Establish a process for periodic updates to the Capital Improvement Plan (CIP).
Address site access, security and potential impacts to District facilities and operations due to supply chain disruptions (e.g., chemicals
power, man -made disasters).
Action Requested
Board Approves Goals and Levels of Service for the
CWMP
11/24/15