' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: November 19, 2015
Subject: PRINCIPLES OF AGREEMENT WITH CONTRA COSTA WATER
DISTRICT FOR 0.5 MILLION GALLONS PER DAY REFINERY
RECYCLED WATER PROJECT
Submitted By:
Initiating DeptJDiv.:
Danea Gemmell— Planning & Engineering & Technical Services /
Development Services Division Manager Planning & Development Services
REVIEWED AND RECOMMENDED FOR BOARD ACTION.
JM. Petit — Director of Engineering & Technical Services
Kent Alm
Counsel for the
ISSUE: Board authorization is required for execution of agreements.
Roger S. Bailey
General Manager
BACKGROUND: Recycled Water is an integral part of both the District's mission and
Strategic Plan.
• Strategic Goal Four, Strategy 2 "Collaborate with regional water and wastewater
agencies to augment the region's water supply while expanding access to
recycled water for Central San customers."
• Mission Statement: "Embracing a policy of sustainability for the responsible use
of existing resources."
For many years, the District has worked to develop a joint project with Contra Costa
Water District (CCWD) to develop a refinery recycled water project. The refinery project
is particularly attractive because it represents a large year -round demand for recycled
water and could make use of existing recycled water conveyance and storage facilities
that are already in place. The existing filter plant and treatment facilities, installed in the
1970s, are permitted to produce 3.8 million gallons per day (MGD) of tertiary treated
recycled water. Currently, the District uses approximately 1.1 MGD for internal
operations and provides approximately 1.5 MGD for Zone 1 customers, leaving 1.2
MGD available for new customers with existing infrastructure.
The proposed 0.5 MGD Refinery Recycled Water Project would be a joint project
between the two agencies and utilize the existing infrastructure to provide tertiary
treated recycled water to the refineries or other industrial customers that can use the
existing water quality. As much of the infrastructure has sat idle for the last 24 years,
rehabilitation of the conveyance and storage facilities is necessary.
Page 1 of 2,
POSITION PAPER
Board Meeting Date: November 19, 2015
subject: PRINCIPLES OF AGREEMENT WITH CONTRA COSTA WATER
DISTRICT FOR 0.5 MILLION GALLONS PER DAY REFINERY RECYCLED
WATER PROJECT
Both agencies have been working these last few months to develop general principles
of agreement before starting to draft a comprehensive wholesale agreement. These
terms are outlined in Attachment 1.
ALTERNATIVES /CONSIDERATIONS: The Board of Directors could request additional
terms for the agreement to be addressed.
FINANCIAL IMPACTS: CCWD has initiated a $2.1 million grant application, on behalf
of both agencies, to the State's Proposition 1 program to partially fund the $6 million
rehabilitation project; if successful, the project could commence in 2016.
COMMITTEE RECOMMENDATION: The draft principles of agreement were reviewed
by the Real Estate and Environmental Planning Committee at the October 13, 2015
meeting.
RECOMMENDED BOARD ACTION: Approve the principles of agreement for the
Refinery Recycled Water Project and direct staff to draft a wholesale agreement for a
0.5MGD of recycled water to be delivered to Contra Costa Water District.
Attached Supporting Document(s):
1. Table: CCCSD -CCWD Principles of Agreement: Refinery Recycled Water Project
2. Map: Recycled Water Line Division of Ownership and Point of Delivery
3. Presentation: CCCSD -CCWD Principles of Agreement: Refinery Recycled Water Project
Page 2 of 2
Attachment 1
CCCSD — CCWD
DRAFT Principles of Agreement: Refinery Recycled Water Project
10/21/15
Agreement Items
Terms
Purveyorship:
CCWD retains purveyorship to customers. Purpose of Use includes
industrial, irrigation, or other uses consistent with regulations and level
of recycled water treatment.
Quantity:
0.5 MGD with Annual Demand Schedule. Total Quantity available for
CCWD's use 1.2 MGD.
Annual demand schedule does not obligate CCWD to take delivery of
recycled water.
Water Quality:
CCCSD responsible for water quality up to and at Point of Delivery.
CCWD responsible for water quality from Point of Delivery to customer.
Specific water quality parameters will be reflected in final agreement
Term:
Initial term is 10 Years consisting of two 5 -year terms; renewable
thereafter in 5 -year increments with the approval of each agencies'
General Manager.
Wholesale Rate:
$246 per acre -foot for water provided to the Point of Delivery; reflects
current 0 &M costs upstream from Point of Delivery.
CCCSD has excluded capital recovery for filter plant construction costs
in the wholesale rate for this Agreement.
CCWD will be investing in rehabilitation of CCCSD -owned facilities
including the recycled water pipeline and pump station.
Point of Delivery
Flow meter to be installed on the discharge piping (or header) of the
Industrial Recycled water pump(s).
Electrical Meter
CCWD responsible for power costs at recycled water distribution pump
Charge:
station. Power options:
a) CCWD can purchase power from CCCSD for Pump electrical
(rate TBD). CCCSD to be made whole if CCWD's use of
generated power requires CCCSD to use PG &E power.
b) CCWD can establish sub - metered electrical account and
purchase power directly from PG &E.
Escalation:
Maximum change in price from year to year (annual escalation) is the
Consumer Price Index (reference to specific index), until such time as a
Cost of Service is performed.
Cost of Service:
An initial Cost of Service (COS) will be performed in three years to
ensure that full cost recovery is achieved for costs and included in
Wholesale Rate.
COS performed at five year anniversary and incorporated into rate for
each successive five -year term. COS calculation methodology and
CCCSD — CCWD
DRAFT Principles of Agreement: Refinery Recycled Water Project
10/21/15
example for $246 /rate will be included as an exhibit to the Agreement.
Changes in the COS methodology may only be made upon agreement
from both parties.
Expansion:
Agreement will allow for future expansion. Both parties agree to
negotiate future expansion costs.
Grant:
Partnering by Both with CCWD Lead Agency
CEQA:
CCWD Lead Agency
Design /Construction:
CCWD Lead Agency with coordination on design with CCCSD; Project
estimate of $6M
Operations
Operations agreement will be developed and approved by the Director
Agreement
of O &M (CCWD) and Deputy General Manager (CCCSD).
Implementation
Implementation of the recycled water project will be contingent on
CCWD's business case analysis of the project, which will include but is
not limited to the following considerations: suitability of delivered
water quality, availability of grant funds, service agreement with
recycled water customer(s), and final price of recycled water.
Termination
The agreement may be terminated by CCWD for any of the following
reasons:
1. Failure of recycled water to meet water quality parameters
specified in the agreement.
2. Changes in the Wholesale Rate resulting from the COS review
that impact the cost effectiveness of recycled water deliveries.
3. Loss of recycled water customer(s).
4. Future maintenance or repair costs to CCCSD or CCWD owned
facilities that impact the cost effectiveness of recycled water
deliveries.
CCCSD – CCWD
DRAFT Principles of Agreement: Refinery Recycled Water Project
10/21/15
Facility Responsibilities Ownership Capital
O &M
Recycled Water Treatment Facility
CCCSD Clearwell and Suction Header
Recycled Water Pump Station and wetwell �
level instrumentation with CCWD SCADA
Controls tied to CCWD Tank. Telemetry
provided to CCCSD and CCWD.
Flow Meter and Electrical Meter R
42 -inch Industrial Pipeline
CCWD Distribution Pipeline & Tanks I
soft-
ATTnruenC!kl -- n
ATTACHMENT 3
CCCSD - CCWD
Principles of Agreement:
Refinery Recycled Water
Project
Danea Gemmell
Planning & Development Services Division Manager
November 19, 2015
Board Meeting
01 Central Contra Costa Sanitary District
Protecting Public Health and the Environment
Recycled Water Line Division of
Ownership and Point of Delivery
Facility Responsibilities
Ownership Capital
O &M
Recycled Water Treatment Facility
CCCSD Clearwell and Suction Header
Recycled Water Pump Station and wetwell level
instrumentation with CCWD SCADA Controls
tied to CCWD Tank. Telemetry provided to
CCCSD and CCWD.
Flow Meter and Electrical Meter
42 -inch Industrial Pipeline
CCWD Distribution Pipeline & Tanks
Agreement Items
Terms
Purveyorship:
CCWD retains purveyorship to customers. Purpose of Use includes industrial,
irrigation, or other uses consistent with regulations and level of recycled
water treatment.
Quantity:
0.5 MGD with Annual Demand Schedule. Total Quantity available for
CCWD's use 1.2 MGD.
Annual demand schedule does not obligate CCWD to take delivery of
recycled water.
Water Quality:
CCCSD responsible for water quality up to and at Point of Delivery.
CCWD responsible for water quality from Point of Delivery to customer.
Specific water quality parameters will be reflected in final agreement
Term:
Initial term is 10 Years consisting of two 5 -year terms; renewable thereafter
in 5 -year increments with the approval of each agencies' General Manager.
Wholesale Rate:
$246 per acre -foot for water provided to the Point of Delivery; reflects
current O &M costs upstream from Point of Delivery.
CCCSD has excluded capital recovery for filter plant construction costs in the
wholesale rate for this Agreement.
CCWD will be investing in rehabilitation of CCCSD -owned facilities including
the recycled water pipeline and pump station.
Point of Delivery
Flow meter to be installed on the discharge piping (or header) of the
Industrial Recycled water pump(s).
Electrical Meter
CCWD responsible for power costs at recycled water distribution pump
Charge:
station. Power options:
a) CCWD can purchase power from CCCSD for Pump electrical (rate TBD).
CCCSD to be made whole if CCWD's use of generated power requires
CCCSD to use PG &E power.
b) CCWD can establish sub - metered electrical account and purchase
power directly from PG &E.
Escalation:
Maximum change in price from year to year (annual escalation) is the
Consumer Price Index (reference to specific index), until such time as a Cost
of Service is performed.
Cost of Service:
An initial Cost of Service (COS) will be performed in three years to ensure
that full cost recovery is achieved for costs and included in Wholesale Rate.
COS performed at five year anniversary and incorporated into rate for each
successive five -year term. COS calculation methodology and example for
$246 /rate will be included as an exhibit to the Agreement. Changes in the
COS methodology may only be made upon agreement from both parties.
Expansion:
Agreement will allow for future expansion. Both parties agree to negotiate
future expansion costs.
Grant:
Partnering by Both with CCWD Lead Agency
CEQA:
CCWD Lead Agency
Design /Construction
CCWD Lead Agency with coordination on design with CCCSD; Project
estimate of $6M
Operations
Operations agreement will be developed and approved by the Director of
Agreement .
O &M (CCWD) and Deputy General Manager (CCCSD).
Implementation
Implementation of the recycled water project will be contingent on CCWD's
business case analysis of the project, which will include but is not limited to
the following considerations: suitability of delivered water quality,
availability of grant funds, service agreement with recycled water
customer(s), and final price of recycled water.
Termination
The agreement may be terminated by CCWD for any of the following
reasons:
1. Failure of recycled water to meet water quality parameters specified
in the agreement.
2. Changes in the Wholesale Rate resulting from the COS review that
impact the cost effectiveness of recycled water deliveries.
3. Loss of recycled water customer(s).
4. Future maintenance or repair costs to CCCSD or CCWD owned
facilities that impact the cost effectiveness of recycled water
deliveries.