HomeMy WebLinkAbout05. Draft PP regarding installation of automated commercial recycled water truck fill stationCentral Contra Costa Sanitary District 59
BOARD OF DIRECTORS POSITION PA PER gMyy
rm
Board Meeting Date: November 19, 2015
Subject: APPROVE A CONTINGENCY PROJECT FOR INSTALLATION OF AN
AUTOMATED COMMERCIAL RECYCLED WATER TRUCK FILL
STATION AT THE KIEWIT PROPERTY
Submitted By:
C. Mizutani, Senior Engineer
Initiating Dept. /Div.:
Engineering & Technical Services
Capital Projects
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
E. Lopez — Capital Projects Division Manager
JM. Petit — Director of Engineering & Technical Services
Roger S. Bailey
General Manager
ISSUE: Board authorization is required to allocate funds from program contingency
accounts to projects not included in the Capital Improvements Budget for amounts over
$100,000. Board authorization is also required to allocate supplemental funds from the
Sewer Construction Fund to the Recycled Water Program Contingency Account.
BACKGROUND: The automated commercial recycled water truck fill station will help
the District achieve the following:
Strategic Goal Four, Strategy 2: "Continue to develop Zone 1 Recycled Water
Program and several Key Performance Indicators including "Volume of recycled
water delivered to recycled water customers per year. ""
Mission Goal: "Embracing a policy of sustainability for the responsible use of
existing resources."
The Recycled Water Hydrant Truck Filling Program is one of the programs employed by
the District to deliver recycled water in Zone 1. These hydrants are used by licensed
contractors for construction - related activities. The availability of hydrant meters limits
contractors' access to the District's recycled water hydrants. Since the drought
declaration, the demand for using the hydrants has outpaced the supply of District
meters. This demand is attributed to a combination of water districts not distributing
potable water meters for construction - related water use and an increase in construction
activity. Staff has handled the increased demand a number of different ways:
• Customers with little to no usage have been asked to return their hydrant meter;
• Customers with large demand are prioritized over smaller demands;
• City of Martinez has donated four meters for use in the truck fill program; and,
most recently,
• Staff has been meeting customers with small demand at the recently - installed
Kiewit hydrant to provide recycled water.
Page 1 of 3
POSITION PAPER
Board Meeting Date: November 19, 2015
Subject* APPROVE A CONTINGENCY PROJECT FOR INSTALLATION OF AN
AUTOMATED COMMERCIAL RECYCLED WATER TRUCK FILL
STATION AT THE KIEWIT PROPERTY
This project proposes to install a packaged automated commercial recycled water truck
fill station. The project work area is within the Kiewit property, see Attachment 1. The
automated fill station will be connected to the recycled water hydrant as shown in
Attachment 2. The fill station comes complete with mechanical and instrumentation /
control components. An automated station offers the advantage of not requiring a
separate meter for each user, and will minimize staff time and avoid the purchase of
additional meters. The completion of the project is expected by April 2016.
During this drought, two meters have been stolen and there have been at least two
known instances of water theft. Each water meter costs approximately $1,500. An
automated station offers staff the ability to monitor and better track the recycled water
delivered to users. For example, when a new user is registered, the system will be
programmed with the user's unique pin code and the quantity of recycled water to be
dispensed. Staff will download data monthly to update recycled water usage records for
trending and permit purposes. Other recycled hydrants are located relatively close to
the proposed fill station. In the event there is an insufficient supply of meters, it will not
be an undue burden for users to be directed to the automated fill station. An automated
fill station could be considered a pilot that, if successful, might be implemented at future
locations. Attachment 3 is a sample of a potential fill station that can be used for this
project.
CEQA: Staff has concluded that this project is exempt from the California
Environmental Quality Act (CEQA) under District CEQA Guidelines Section 15301(b)
since it involves a minor alteration to an existing, publicly -owned recycled water fill
station. Approval of this project will establish the Board of Directors' independent finding
that this project is exempt from CEQA.
FINANCIAL IMPACTS: The construction estimate for the installation of the fill station is
$90,000. An additional $25,000 is anticipated for staff time in design, bidding,
permitting, inspection, contingency, and construction support. The total cost for the
project is anticipated to be $115,000. To date, there is $30,000 in the Recycled Water
Program Contingency Account; an additional $85,000 from the Sewer Construction
Fund will need to be allocated to this contingency account in order to complete the
project.
ALTERNATIVES /CONSIDERATIONS: The General Manager has the authority to
award construction contracts up to $100,000 upon approval of this contingency project.
An alternative would be not to authorize the contingency project and construction of the
fill station.
COMMITTEE RECOMMENDATION: The Engineering and Operations Committee
reviewed this subject at the meeting on November 10, 2015, and recommended .........
Page 2 of 3
POSITION PAPER
Board Meeting Date: November 19, 2015
subject. APPROVE A CONTINGENCY PROJECT FOR INSTALLATION OF AN
AUTOMATED COMMERCIAL RECYCLED WATER TRUCK FILL
STATION AT THE KIEWIT PROPERTY
RECOMMENDED BOARD ACTION:
Find that this project is exempt from CEQA;
2. Approve a contingency project for $115,000 for the installation of an automated
commercial recycled water truck fill station at the Kiewit property; and
3. Approve a supplemental authorization of $85,000 from the Sewer Construction
Fund to the Recycled Water Program Contingency Account.
Attached Supporting Documents:
1. Project Location Map
2. Diagram of Recycled Water Truck Fill Station
3. Sample Brochure
Page 3 of 3
j:
^ /y�
IAM
1�1. ft�l.. ■. io I Mr
E
c
N
O
N
0
0
I
(E) CONC.
PAD AND
HYDRANT
CONNECT TO REW
HYDRANT USING 3"
STEEL, SCH 40 PIPE.
PROVIDE FITTINGS
AS REQUIRED.
Central Contra Costa
Sanitary District
(N) CONC. qAD "I 'I -U
SEE DETA L A
(N) RECYCLED
WATER
AUTOMATED
FILL STATION
STATION
RECYCLED WATER
AUTOMATED TRUCK FILL
STATION
r —�
L�j
m
(N)
BOLLARDS
7,_0„
OVERHEAD
TRUCK FILL
BASE. ROUTE
OVERHEAD
FILL SPOUT
TO SOUTH OF
PAD.
(N) REW OVERHEAD
FILL STATION. SIZE
AND MOUNTING
REQUIREMENTS PER
MANUFACTURER
RECOMMENDATION
(N) SLAB.
1 % SLOPE FOR
DRAINAGE.
6" MINA
f-- .
A 1 1 AL;MMtN 1 1
U
6" AGGREGATE BASE.
COMPACTED TO 95 %.
A IDETAIL
NTS
14'
— #4 @
12" EW.
a l 8"
•
BULK WATER DISPENSIKIP
DISPENSING TERMINALS
Our Dispensing Terminals
retrofit to new or existing
infrastructure providing
all the same features as
our Turn -key solutions.
Flowpoint also provides
all the components such
` as piping, metering and
valv6s to retrofit to y r
infrAlructure.
TURN -KEY STATIONS
Our Turn -Key Stations
• Provide Accountability
• Provide Security
• Generate Revenue
• Reduce Administration
Each Turn -Key Station is
self contained, insulated
and a maintenance
friendly dispensing
station.
They can be heated,
cooled or both and come
complete with a supply
valve, reduced pressure
backflow prevention
device, stainless steel
piping, meter, drain valve,
access terminal and field
terminal box.
All stations dispense
potable water, reclaimed
water or raw water.
c
The Water Sentry"
is a large bulk water
dispensing solution, with
overhead load outs up to
4" diameter.
Eliminates ice build
up where ambient
temperatures drop below
freezing.
Redundancy back flow
prevention (Air Gap and
Reduced Pressure).
The Water Genera [TM is
a cost effective solution
great for curbside
loading locations.
Ideal for all weather
climates. Available in 2 ",
3" and 4" sizes as well as
solar powered.
ATTACHMENT
FLOWPO/NT
i
The Custom Station
is a powerful bulk
water dispensing
solution designed to
simultaneously dispense
bulk water to as many as
four trucks with load outs
up to b" diameter to meet
your specific needs.
Custom stations can be
built to suit your specific
requirements.
Contact our expert sales
department staff to assist
you with a system to meet
your specific needs.
Website: www.flowpointsystems.com Toll Free: (877) 655 -5585 Email: sales(dflowpointsystems.com