Loading...
HomeMy WebLinkAbout06. (Handout) Comprehensive Collection System Master PlanComprehensive Collection System Master Plan Develop Scope, Budget & RFP & Consultant Selection Phase 1: Condition Assessment • Pump Stations • Force Mains • Junction Structures Phase 2: Hydraulic Assessment • Land Use Projections • Design Storm Criteria • Comprehensive Flow Monitoring • Optimized Model Calibration Phase 3: Integrated Prioritization • Regulatory Environment • Hydraulic needs • Operational Data • Condition Assessment Phase 4: CS Master Plan Report • CIP Forecasting • Capital Project Identification & Prioritization