Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
06. (Handout) Comprehensive Collection System Master Plan
Comprehensive Collection System Master Plan Develop Scope, Budget & RFP & Consultant Selection Phase 1: Condition Assessment • Pump Stations • Force Mains • Junction Structures Phase 2: Hydraulic Assessment • Land Use Projections • Design Storm Criteria • Comprehensive Flow Monitoring • Optimized Model Calibration Phase 3: Integrated Prioritization • Regulatory Environment • Hydraulic needs • Operational Data • Condition Assessment Phase 4: CS Master Plan Report • CIP Forecasting • Capital Project Identification & Prioritization