HomeMy WebLinkAbout08.a. (Handout) Treatment Plant Safety Enhancements Phase 4! Treatment Plant Safety Enhancements Phase 4 Project Highlights DP 7311 Treatment Plant Safety Enhancements Phase 4 • Hazardous Waste Storage Improvements o District is now being inspected regularly by County • Valve Vault (Asbestos) • Access to valves is a safety concern • Asbestos removal • Handrail and Grating (SCI and MRC) • Continuation of previous handrail projects • Safety around WHB's is an issue • Substation 82 Access Road Retaining Wall o Access road is failing (electrical feeder to filter plant) DP 8239 POD Office Improvements • Multipurpose Room (MPR) ADA Ramp and Parking • Increase use of MPR by public • Safer employee access • Facility security DP 8237 Buffer & Rental Property Improvements • 4737/4849 Imhoff PI. Retaining Wall o Cracks in pavement at 4737 parking area (public access) Central Contra Costa Sanitary District DRAFT SUMMARY OF BIDS File: 7311.8.3 PROJECT NO.: 7311 NO. OF ADDENDA: 1 DATE/TIME: FEBRUARY 10, 2015/2 PM PROJECT NAME: TREATMENT PLANT SAFETY ENHANCEMENTS, PHASE 4 PROJECT MANAGER: BRAD LEIDECKER PROJECT LOCATION: 5019 IMHOFF PLACE. MARTINEZ. CALIFORNIA ENGINEER'S ESTIMATE: $600,00 0 NCI. BIDDER BID PRICE Aztec Consultants, Inc. Michelle Aurand 1 2021 Omega Road, Suite 200 $724,000 San Ramon, CA 94583 925- 837 -1050 Manito Construction, Inc. Jeff Perko 2 1043 Serpentine Lane, Suite 1 $757,600 Pleasanton, CA 94566 925 - 600 -0220 W. M. Lyles Company Crystal Ferreira 3 3960 Industrial Boulevard, Suite 300 $865,000 West Sacramento, CA 95691 916- 375 -1833 BIDS OPENED BY: /s/ Elaine R. Boehme, CIVIC DATE: February 10, 2015 ATTACHMENT 3 TP SAFETY ENHANCEMENTS, PHASE 4 DISTRICT PROJECT 7311 POST -BID / PRECONSTRUCTION ESTIMATE No. Item Description Amounts % Construction Cost 1. CONSTRUCTION a. Construction Contract $724,000 b. Contingency at 10% $72,400 c. Permit $1,000 SUBTOTAL - CONSTRUCTION COST $797,400 100% 2. CONSTRUCTION MANAGEMENT a. District Forces - CM, Engr., Survey $55,000 - POD Coordination $10,000 b. Consultants - Inspection $48,000 - Material Testing $2,000 - ADA Consultant/ Safety Consultant $6,000 SUBTOTAL - CONSTRUCTION MANAGEMENT $121,000 15.2% 3. PREBID EXPENDITURES a. In House Engineering $ 100,000 b. Consultant Fees $ 50,000 TOTAL DESIGN EXPENDITURES $150,000 18.8% c. Prior Expenditures $ 73,000 SUBTOTAL - PREBID EXPENDITURES $223,00 28.0% 4. TOTAL PROJECT COST* $1,141,40 5. FUNDS AUTHORIZED TO DATE $290,00 6. ADDITIONAL ALLOCATION NEEDED TO COMPLETE PROJECT Line 4 - Line 5 1 *Cost of the project will be funded by DP 7311, DP 8237, and DP 8239 NATREATPLAN1V311 - TP Safety Enhanc. Ph 4\Design \8.0_Bid Phase Activities\Award Position Paper\7311—Award Position Paper CA 20150211.docx Page 6 of 6 L An mmw;Zmmq]=M-I mm 'Capital Legal Services IM NEWS N/A: Project Not Ranked. Project is capitalized essential service. A J cvl�� 0-, Vk LJ tA 0 0 I , -`, -"7 u � 'm FY14115 Treatment Plant Program - Project Report Card Color Code for CIB Program Categories: Reg. Compliance/Planning/Safety One-Time Renovation Recurring Renovation Priority Category Project Number Project Critical 7285 Primary Treatment Renovation Critical 7301 Treatment Plant Planning . Critical 7314 Urgent Repairs Blanket Contract, Critical 7265 TP Equipment Replacement Critical 7308 Co-Gen Controls Upgrade Critical 7292 Switchgear Refurbishment - ph 2 Critical 7310 Piping Renovations - phase 8 Critical 7309 DAF Tank Renovation Critical 7297 Wet and Dry Scrubber Replacement Critical 7311 TP Safety F_nh Ph Critical 7291 Pump & Blower Bldg Seismic Upgrade Very High pTP08 TP Safety Improv 2011-12 thru 2019-20 Very High 7312 Ash Facility Improvements Very High pTP42 Plant Control System 1/0 Replacement Very High 7304 PLC Sys Upgr - 12-13 thru 21-22 Very High 7286 Centrifuge & Cake Pump Upgrades its High pTP32 Plant Energy Optimization Veg High 7315 Plant of the Future Roadmap Very High pTP24 Laboratory Upgrades & Repair High 7284 TP Hazard Identification & Remediation High pTP47 WC / Grayson Creek Levee Rehab High pTP31 Permitting Study for New Furnace High pTP33 Treatment Plant Soil Remediation High pTP41 Plant Control System Network Upgrades High pTP03 Plant Cyber Security High 7254 TP Cathodic Prot Sys Repl High pTP06 Plant Electrical and Instr Repl High pTP45 TP Electrical Cable Repl -'LT Meduim xxxx TP Facilities Renov P - LT Meduim pTP29 Pavement Renovation Meduim pTP16 Coating Renovation Meduim pTP30 Concrete Renovation Meduim TP23 TP Security Upgr - 2012 -13 thru 2021-22 F'o-C) (0 &\ kJ Cto S-e 0,.i ry V - 11 ) 03 �oc U