HomeMy WebLinkAbout06. (Handout) Capital Project Prioritization Form(o CENTRAL CONTRA COSTA SANITARY DISTRICT: CAPITAL IMPROVEMENT PROGRAM PROJECT PRIORITIZATION FORM Last Updated 09116/2014 APPLICABILITY TO DISTRICT MISSION TRIPLE BOTTOM LINE BENEFITS EMBRACING SCORE MAX CRITERIA SUB- CRITERIA COLLECTING AND SUSTAINABILITY1 PROMOTING POINTS TREATING RESPONSIBLE USE ENVIRONMENTAL FINANCIAL SOCIAL ENVIRONMENTAL WASTEWATER OF EXISTING STEWARDSHIP RESOURCES ESSENTIAL COMMITMENTS (MAX POINTS POSSIBLE = 80) Complies 1. Complies with court- ordered mandates, legal settlements, consent decrees X X X with Regulatory Requirements and Mandates 30 ' (30 Points if any Sub - Criteria are met, 0 Points if no Sub - Criteria are met) 2. Complies with regulatory requirementstavoids permit violations (e.g. Title V Air Permit, NPDES Waste Discharge X X X Requirements) Meets Commitment with Outside Agency or Existing Contract 1. Fulfills joint-powers-agreement, memorandum -of- understanding, or pavement moratorium with outside agency. X X 2. Required to complete commitment with existing construction contract X X 30 (30 Points if Sub - Criteria 1 and /or 2 are met, 15 Points if only Sub - Criteria 3 is met. 0 Points if no Sub - Criteria are met) 3. Meets commitment with Board - approved consultant contract ( >$100,000) X X 10 Reduces Potential Health or Safety Hazards I1. Reduces potential health or safety hazards to customers and /or employees X X X (10 Points if any Sub - Criteria are met, 0 Points if no Sub - Criteria are met) Implements Board Policy /Priority 1. Implements or conforms to a written policy /plan/priority which has been adopted by the District Board of Directors (e.g. 5 (5 Points if any Sub - Criteria are met, 0 Points if no Sub - Criteria are met) supports Strategic Plan goals and key performance indicators such as reduce SSOs, develop asset management plan, X X X X X X keep GHG emissions below CARB Cap and Trade Threshold, reduce energy demand, maximize energy independence) Increases Capacity to Meet Projected Buildout 5 1(5 Points if any Sub - Criteria are met, 0 Points if no Sub - Criteria are met) 1. Provides collection and /or treatment capacity to handle projected buildout/growth of service area X X PROJECT BENEFITS (MAX POINTS POSSIBLE = 35) 5 Impacts Project Phasing or Implementation Schedule for Other Projects 1. Impacts project phasing or implementation schedule for other projects X X X (5 Points if any Sub - Criteria are met, 0 Points if no Sub - Criteria are met) 1. Reduces overall capital expenditures (e.g. integrates multiple improvementstareas into single project, prolongs use of X X X existing facilities to reduce overall capital costs where feasible) 5 Optimizes Capital Expenditures 2. Reduced capital costs due to project timing (e g- cost sharing opportunities, material market trends, significantly X X X (5 Points if any Sub - Criteria are met, 0 Points if no Sub - Criteria are met) reduces costs for future capital projects) 3. Utilizes potential grants, loans, or generates revenue to offset District costs X X X 5 Reduces O &M Costs (5 Points if any Sub - Criteria are met, 0 Points if no Sub - Criteria are met) 1. Reduces O &M costs (labor, power, steam, chemicals. reduced maintenance costs for parts) X X X 5 Reduces Social Impacts 1. Reduces amount and duration of service interruptions to customers X X 2. Minimizes disruption to neighborhood or businesses X X (5 Points if any Sub - Criteria are met, 0 Points if no Sub - Criteria are met) 1. Makes efficient use of natural resources for environmental sustainability (e.g. solar, wind, hydroelectric power, recycled X X X X 5 Increases Sustainable Use of Natural or Existing Resources materials, natural treatment processes requiring less energy) 2. Utilizes existing abandoned or unused facilities X X X ( Points if any Sub - Criteria are met, 0 Points if no Sub - Criteria are met) 3. Beneficially uses waste products to reduce costs or generate revenue (e.g. waste heat, nutrient recovery) X X X X Reduces Environmental Impacts 1. Reduces impact to the environment beyond regulatory requirements (e.g. CEC removal, plastics removal) X X X X 2. Utilizes construction methods /materials and /or design features that minimize environmental impacts (e.g. LEED design, X X X X 5 (5 Points if any Sub - Criteria are met, 0 Points if no Sub - Criteria are met) low water use equipment, ultra high efficiency drives/equipment) 5 Supports Timely Adoption of Technology Improvements 1. Supports timely adoption of technology improvements (e.g. planning/optimization projects that evaluate innovative X X X (5 Points if any Sub - Criteria are met, 0 Points if no Sub - Criteria are met) Itechnologies, pilot projects, utilizes innovative processes /equipment) OPERATIONAL RELIABILITY(MAX POINTS POSSIBLE = 20) 1. Avoids unplanned expenses due to repairs and emergencies (Risk Score > 70 in asset management database) X X X 2. Renews equipment that has already failed or is very near failure (Likelihood of Failure > 7 in asset management X X X database) 10 Consistent with Asset Management Policies Points if Sub Criteria 1 2 is if Sub Criteria 5 3. Implements an annual maintenance or renewal program as prescribed in the Asset Management Plan X X X (10 only - or met or two or more - are met, Points if only Sub - Criteria 3, 4, or 5 is met, 0 Points if no Sub - Criteria are met) 4. Reduces loss of economic activity/increased 0 &M costs due to facilities failure (e.g. impacts to receiving facilities/HHW facility, increased grid import costs due to equipment failure, natural gas/landfill gas supply issues, requires use of X X X standby facilities, requires inefficient operation of pump stations, etc.) 5. Recommended by annual maintenance program as necessary to avoid predicted failure (Likelihood of Failure > 5 in X X X asset management database) 1. Improves reliability (e.g. redundant equipment/piping, improved ccntrols/monitoring /alarms, standby facilities, bypass X X X X improvements) Improves Reliability and System Performance 5 ( g ) 2. Improves/optimizes operations e. install VFD, automated controls X X X X (5 Points if any Sub - Criteria are met, 0 Points if no Sub - Criteria are met) 3. Improves system oe equipment operation and/or performance (e.g. improved dewatering, increased filter loading rate, X X X improved flow control) 1. Provide physical protection to accommodate climate change (sea level rise, storms, flooding) or major disasters (e.g. X X X X 5 Improves Facility -Wide Resiliency levee improvements, storm water diversion facilties) 2. Provides operational reliability /redundancy for accommodating climate change or major disasters (e.g. standby power, X X X X (5 Points if any Sub- Criteria are met, 0 Points if no Sub - Criteria are met) redundant control systems/communications) 135 ITOTAL