Loading...
HomeMy WebLinkAbout04.a. (Handout) Bid Formsr PART III BID FORMS SECTION 2 — SCHEDULE OF BID 4oa. Unit Price Schedule of Prices for Construction of District Project 8413, Walnut Creek Sewer Renovations, Phase 10, in accordance with the Project Documents. The bidder shall provide an amount in both figures and words for each item listed below (see Part II, Instructions to Bidders). Failure to comply with these requirements may be grounds for finding the bid nonresponsive. Item No. Description Quantity Unit 1 Mobilization /demobilization for the lump -sum (LS) price of (WRITTEN IN WORDS) -Two T1touwot tone L'Wowe �o<N�� a� 2 Sheeting, shoring, and bracing or equivalent method conforming to applicable safety orders for the lump - sum (LS) price of (WRITTEN IN WORDS) OL4 'alVt UA 7y►ou�r 3 Construction schedule for the lump -sum (LS) price of (minimum $20,000 — maximum $40,000) (WRITTEN IN WO o:7) 4 Traffic,; control, as specified, for the lump - sum (LS) price of (WRITTEN IN WO � Lwe4 y Tic o�+y�oQ 5 Abandonment and /or removal of existing manholes, rodding inlets, and sanitary sewers for the lump -sum (LS) price of WRITTEN IN WORDS) T4,7 oY4VX , TWt ff i tfY lc�G, 6 New standard manholes, furnished and installed, for the per -each (EA) pace of 1 LS 1 LS 1 LS 1 LS 1 LS 18 EA DP 8413 - Volume 1 - Page 23 Write Write Unit Extended Price In Price in Fi ures Fi ures $'t, M.- $ #), 99D- $ 100, ! GW — $ /00, DOD — $ d- 0, pOQ - $ do, $ 0, 360 -- $ /0, 2760 - $ g, O0- $ 144, 000 7 New polyethylene manholes, furnished 8 EA $ $ and installed, for the per -each (EA) price of WRITTEN IN WO tGe 8 o r.�,�(l Modify manholes for the per -each (EA) 14 EA $ 061V $,v% S e of (WRI E I, ,WORDS) TWO 9 Installation of 8 -inch PVC pipe using 940 LF $ $ open -cut method in Pine St., Drawing Nos. P -17 and P -18 of the Project Drawings, for the lineal foot LF) price of (WRITT N IN WORDS) 10 Installation of 8 -inch PVC pipe using 1 LS $ X , AW $ a�6,1 ow - open -cut method in North Main Street, Drawing Nos. P -9 and P -10, for the lump -sum (LS) price of WRITTEN I,rl WORDS) O G� lyt 11 Installation of 6- and 8 -inch HDPE pipe 1 LS $ k 0tv _ $ 667, Of,Y using pipe -burst method in Milton Avenue Easement, Drawing No. P -13, for the lump-sum (LS) price of FJ) r •F 12 2W Installation of 8 -inch PVC pipe using 1,559 LF $ _ $ open -cut method for the lineal foot (LF) price of (WRITTE IN J1110�R,D) d 13 Installation of 8 -inch PVC pipe using 435 LF $ — $ hand -dig method for the lineal foot LF) price of WR TTEy, IN WOR S U 14 Installation of 8 -inch Ductile Iron pipe 444 LF $ �} %� ' $ using open -cut method for the lineal foot (LF price of (WRITTEN IN WORDS) wo aA v Eve 15 Installation of 6- and 8 -inch HDPE pipe 245 LF $-300.— $ 7?J, S0 using hand -dig and direct -bury method for the lineal foot (LF) price of (WRITT N IN WORDS) Them l'f�/hee dW�. DP 8413 - Volume 1 - Page 24 4 7 7 1 7 7. 5 3 7 3 i, 1 16 Installation of 6- and 8 -inch HDPE pipe 3,031 using pipe -burst method for the lineal foot (LF) price of (WRITTEN IN WO DS) 0/1112 HLwk4.o 0 17 Installation of 6- and 8 -inch HDPE pipe 261 using open -cut method for the lineal foot (LF) price of (WR TTEN IN W R o H �/ 18 Locate, hand dig, and repair of pipeline 100 sags prior to pipe bursting, as indicated, for the lineal foot (LF) price of (WRITTEN 0 19 Reconnect active house or building 131 laterals for the per -each (EA) price of (WRITTEN f1'(�[/Ixie��Q WO A i2 20 Provision and extension of laterals 120 beyond the 6 feet per specifications for the lineal foot (LF) price of (WRI EN IN WORDS) /►e o ds�Li. 21 Locate and verify active and inactive 131 house or building laterals for the per - each (EA) price of (WRITT N IN WORDS) Ftl� 22 Provision and installation of concrete cap 15 for the square yard (SY) price of (WRITTEN IN HW1/�t i &VO4- WORDS) o O 23 Remove and replace concrete driveway, 30 sidewalk, curb, and /or gutter beyond the limits specified for all other items for the square yard SY) price of (WRI EN IN WO D �/►d /'��/� 24 Provision and installation of misc. AC 100 pavement for the per -ton (TN) price of (WRI WEN W�R[)S) el e- DP 8413 - Volume 1 - Page 25 LF $ r "d— $ LF $DSO_ $ 6y, 7 LF $ %% $ l0, a&V EA $ jd0. — LF $1150— $ l7>> 00d — EA $ $ 6.5;5q SY $ J-So _ 75&, SY $ /00." ?QOM— TN $ j,;'� — $ I2S46?— 3 7 1 7 7 1 25 Provision and installation of AC 179 pavement in private streets, Drawing Nos. P -1 and P -11, for the per square - yard (SY) price of (WRITTEN IN WORDS) �r MAIZ 26 Open -cut hard rock for the cubic yard 100 (CY) price of (WR TT EN IN WORDS) O aid 27 Overexcavation for the cubic yard (CY) 100 price of (WRITTEN I=S) TL-E,'Ve 28 Removal of trees greater than 9 inches in 13 diameter, as indicated, for the per -each (EA) price of,(WRI E IN�j11O DS) { W~ P N SY $ Go. $ /o, ;¢0. CY $ O. $ K om CY $ X EA $ 4QO 29 Potholing for the per -each (HR) price of 16 HR $100 $ S, ©� (�� TEN W70 TOTAL BID IN FIGURES r,,,,�o MI;�� o�, Two �iojAd vee F4rl i —Fi ;&- AowoW TOTAL BID IN By. Authorized Signature Date Name: �+�X�t -''1 tAJ00A Print Note: Bidder must initial ALL changes in Schedule of Bid. DP 8413 - Volume 1 - Page 26