Loading...
HomeMy WebLinkAbout04.a. (Handout) Bid Tabulation Sheet40 BID TABULATION SHEET DP 8413 WALNUT CREEK SEWER RENOVATION, PHASE 10 Prepared By: NANCY MOLINA Date: 5 -22 -14 File: .8.3 4.0k. Engineer's Estimate K.J. Woods Darc &Harty Bay Pacific Pacific Trenchless Ranger Pi elines Item Extended Extended Extended Extended Extended Extended # Description Oty Unit Unit Cost Cost Unit Cost Cost Unit Cost Cost Unit Cost Cost Unit Cost Cost Unit Cost Cost 1 Mobilization /Demobilization for the lump sum LS rice of 1 LS 2.50% $ 54,000 $ 42,990 $ 42,990 $ 120,000 $ 120,000 $ 25,000 $ 25,000 $ 179,952 $ 179,952 $ 130,000 $ 130,000 2 Sheeting, shoring, and bracing or equivalent method conforming to applicable safety orders for the lump sum LS rice of 1 LS 2.50% $ 54,000 $ 100,000 $ 100,000 $ 90,000 $ 90,000 $ 25,000 $ 25,000 $ 114,332 $ 114,332 $ 50,000 $ 50,000 3 Construction schedule for the lump sum (LS) price of (minimum $20,000 - maximum $40,000 ) 1 LS $30,000.00 $ 30,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 40,000 $ 40,000 $ 39,088 $ 39,088 $ 20,000 $ 20,000 4 Traffic control, as specified, for the lump sum LS rice of 1 LS 2.00% $ 43,000 $ 20,000 $ 20,000 $ 64,000 $ 64,000 $ 25,000 $ 25,000 $ 34,674 $ 34,674 $ 10,000 $ 10,000 5 Abandonment and /or removal of existing manholes, rodding inlets, and sanitery sewers for the lump sum LS rice of 1 LS 1 $14,000 $ 14,000 $ 10,360 $ 10,360 $ 18,000 $ 18,000 $ 15,000 $ 15,000 $ 18,394 $ 18,394 $ 10,000 $ 10,000 6 New standard manholes, furnished and installed, for the per each EA rice of 18 EA $ 5,500 $ 99,000 $ 8,000 $ 144,000 $ 9,000 $ 162,000 $ 5,000 $ 90,000 $ 7,176 $ 129,168 $ 5,500 $ 99,000 7 New polyethylene manholes, furnished and installed, for the per each EA rice of 8 EA $ 5,700 $ 45,600 $ 8,000 $ 64,000 $ 7,000 $ 56,000 $ 6,500 $ 52,000 $ 4,146 $ 33,168 $ 5,800 $ 46,400 8 Modify Manholes for the per -each (EA) price of 14 EA $ 2,000 $ 28,000 $ 2,000 $ 28,000 $ 1,500 $ 21,000 $ 3,000 $ 42,000 $ 3,306 $ 46,284 $ 2,100 $ 29,400 9 Installation of 8 -inch PVC pipe using open -cut method in Pine St., Drawings Nos. P -17 and P- 18 of the project drawings, for the lineal foot LF rice of 940 LF $ 250 $ 235,000 $ 240 $ 225,600 $ 280 $ 263,200 $ 200 $ 188,000 $ 255 $ 239,700 $ 310 $ 291,400 10 Installation of 8 -inch PVC pipe using open cut method in North Main Street, Drawings Nos. P- 9 and P -10, for the lump -sum (LS) price of 1 LF $ 280,000 $ 280,000 $ 250,000 $ 250,000 $ 415,000 $ 415,000 $ 692,000 $ 692,000 $ 269,040 $ 269,040 $ 656,610 $ 656,610 11 Installation of 6- and 8 -inch HDPE pipe using pipe burst method in Milton Avenue Easement, Drawings No. P -13, for the lump -sum (LS) price Of 1 LF $ 80,000 $ 80,000 $ 60,000 $ 60,000 $ 45,000 $ 45,000 $ 75,000 $ 75,000 $ 57,800 $ 57,800 $ 186,420 $ 186,420 12 Installation of 8 -inch PVC pipe using open -cut method for the lineal foot LF rice of 1559 LF $ 250 $ 389,750 $ 240 $ 374,160 $ 198 $ 308,682 $ 200 $ 311,800 $ 235 $ 366,365 $ 350 $ 545,650 13 Installation of 8 -inch PVC pipe using hand -dig method for the lineal foot LF rice of 435 LF $ 300 $ 130,500 $ 250 $ 108,750 $ 230 $ 100,050 $ 400 $ 174,000 $ 235 $ 102,225 $ 450 $ 195,750 14 Installation of 8 -inch Ductile Iron pipe using open -cut method for the lineal foot (LF) price of $ 300 444 LF 1 $ 133,200 $ 275 $ 122,100 1 $ 205 $ 91,020 $ 250 $ 111,000 $ 235 $ 104,340 $ 360 $ 159,840 File: .8.3 15 Installation of 6- and 8 -inch HDPE pipe using hand -dig and direct -bury method, for the lineal foot LF rice of 245 LF $ 350 $ 85,750 $ 300 $ 73,500 $ 230 $ 56,350 $ 400 $ 98,000 $ 245 $ 60,025 $ 450 $ 110,250 16 Installation of 6- and 8 -inch HDPE pipe using pipe -burst method for the lineal foot (LF) price $ 140 Of 3031 LF $ 424,340 $ 150 $ 454,650 $ 165 $ 500,115 $ 150 $ 454,650 $ 183 $ 554,673 $ 190 $ 575,890 17 Installation of 6- and 8 -inch HDPE pipe using open -cut method for the lineal foot (LF) price of $ 200 261 LF $ 52,200 $ 250 $ 65,250 $ 198 $ 51,678 $ 200 $ 52,200 $ 205 $ 53,505 $ 340 $ 88,740 18 Locate, hand dig, and repair of pipeline sags prior to pipe bursting, as indicated, for the lineal foot LF rice of 100 LF $ 200 $ 20,000 $ 100 $ 10,000 $ 200 $ 20,000 $ 400 $ 40,000 $ 205 $ 20,500 $ 100 $ 10,000 19 Reconnect active house or building laterals for the per each EA rice of 131 EA $ 500 $ 65,500 $ 100 $ 13,100 $ 600 $ 78,600 $ 300 $ 39,300 $ 1,541 $ 201,871 $ 150 $ 19,650 20 Provision and Extension of Laterals beyond the 6 feet per specifications for the lineal foot (LF) rice of 1201 LF $ 150 $ 18,000 $ 150 $ 18,000 $ 100 $ 12,000 $ 175 $ 21,000 $ 235 $ 28,200 $ 120 $ 14,400 21 Locate and verify active and inactive house or building laterals for the per each (EA) price of 131 EA $ 110 $ 14,410 $ 50 $ 6,550 $ 100 $ 13,100 $ 250 $ 32,750 $ 331 $ 43,361 $ 65 $ 8,515 22 Provision and installation of concrete cap for the square yard SY rice of 151 SY $ 100 $ 1,500 $ 250 $ 3,750 $ 200 $ 3,000 $ 150 $ 2,250 $ 20 $ 300 $ 90 $ 1,350 23 Remove and replace concrete driveway, sidewalk, curb, and /or gutter beyond the limits Specified for all other items for the square yard SY rice of 30 SY $ 80 $ 2,400 $ 100 $ 3,000 $ 100 $ 3,000 $ 200 $ 6,000 $ 9 $ 270 $ 150 $ 4,500 24 Provision and installation of misc. AC pavement for the per ton TN rice of 100 TN $ 80 $ 8,000 $ 175 $ 17,500 $ 200 $ 20,000 $ 300 $ 30,000 $ 37 $ 3,700 $ 69 $ 6,900 25 Provision and installation of AC pavement in private streets, Drawing Nos. P -1 and P -11, for the per square-yard SY rice of 179 SY $ 11 $ 1,969 $ 60 $ 10,740 $ 90 $ 16,110 $ 300 $ 53,700 $ 121 $ 21,659 $ 36 $ 6,444 26 Open -cut hard rock for the cubic yard (CY) rice of 100 CY $ 50 $ 5,000 $ 250 $ 25,000 $ 50 $ 5,000 $ 100 $ 10,000 $ 10 $ 1,000 $ 50 $ 5,000 27 Over - excavation for the cubic yard (CY) price of 100 CY $ 50 $ 5,000 $ 25 $ 2,500 $ 20 $ 2,000 $ 20 $ 2,000 $ 10 $ 1,000 $ 15 $ 1,500 28 Removal of trees greater than 9 inches in diameter, as indicated, for the per -each (EA) rice of 1 131 EA $ 2,000 $ 26,000 $ 500 $ 6,500 $ 2,200 $ 28,600 $ 500 $ 6,500 $ 335 $ 4,355 $ 500 $ 6,500 29 1 Potholing for the per-each HR rice of 1 161 HR $ 200 $ 3,200 $ 500 $ 8,000 $ 300 1 $ 4,800 $ 1,000 $ 16,000 $ 435 $ 6,960 $ 75 $ 1,200 Totals $ 2,350,000 $ 2,288,000 M $ 2,735,9091 $ 3,291,309