HomeMy WebLinkAbout05. (Handout) Closeout of Capital Improvement Projects5.
Central Contra Costa Sanitary District
Revised August 27, 2014
TO: ENGINEERING AND OPERATIONS COMMITTEE
VIA: ROGER BAILEY, GENERAL MANAGER
JEAN-MARC PETIT DIRECTOR OF ENGIN�NG tnP
JEA �
EDGAR LOPEZ, PROVISIONAL CAPITAL PROJECTS DIV'N. MGR.
FROM: EARLENE MILLIER, ENGINEERING ASSISTANT III Pi
SUBJECT: CLOSEOUT OF CAPITAL IMPROVEMENT PROJECTS
Work has been completed on 24 capital improvement projects during the 2013 -14 fiscal
year.
As a result of the closeout of these projects, $755,437 is being returned to the
Treatment Plant, Collection System, and General Improvements Program. No Recycled
Water projects are being closed out this fiscal year and therefore, no money was
returned to the Recycled Water Program.
Below is a summary of the allocated budgets and expenditures for the closed projects
by program. Attachment 1 lists the allocated budgets and expenditures and
underun /(overrun) amounts for each project. Attachment 2 contains a brief summary of
the work completed under each project.
Program
Allocated Budget
Expenditures as
of June 30, 2014
Underrun = Amount
Returned to Program
Treatment Plant
$7,945,000
$7,466,593
$478,407
Collection System
$9,046,704
$8,769,301
$277,403
General Improvements
$986,643
$967,016
$19,627
Recycled Water
No Recycled Water projects closed in 2013 -14.
Totals
$17,978,347
$17,202,910
$775,437
Attachment 1
Budget and Expenditure Summary - 2014 Closeouts
TREATMENT PLANT PROGRAM CLOSING PROJECTS
DISTRICT
PROJECT NO.
PROJECT TITLE
ALLOCATED
BUDGET
EXPENDITURES
AS OF 6130114
UNDERRUN
(OVERRUN)
7241
Wet Weather Bypass Improvements
3,320,000
3,297,882
22,118
7268
Treatment Plant Facilities Renovations
250,000
220,016
29,984
7269
Treatment Plant Asset Management
1,184,000
960,725
223,275
7272
Aeration System Renovation
474,000
443,873
30,127
7283
Fire Protection System Improvements
318,000
311,157
6,843
7287
Treatment Plant Master Plan Update
467,000
390,922
76,078
7294
Secondary Process Improvements
$50,000
$47,403
$2,597
7295
Auxiliary Boiler Burner Upgrade
215,000
187,700
27,300
7296
SCB Seismic Upgrade Study
150,000
137,690
12,310
7298
Piping Renovations Phase 7
1,417,000
1,415,110
1,890
7313
Solids Handling Equipment Evaluation
100,0001
54,1151
45,885
Program Totals
$7,945,000
1 $7,466,593
1 $478,4071.
COLLECTION SYSTEM PROGRAM CLOSING PROJECTS
DISTRICT
PROJECT NO.
PROJECT TITLE
ALLOCATED
BUDGET
EXPENDITURES
AS OF 6130114
UNDERRUN
(OVERRUN)
5773
Smith Road Contractual Assessment District
124,539
124,539
0
5937
Alhambra Valley Assessment Districts
200,000
130,063
69,937
5948
TV Inspection, Phase 2
1,926,165
1,870,714
55,451
5955
Suspended Pipe Support
392,000
387,782
4,218
5973
North Orinda Sewer Renovations, Phase 4
2,589,000
2,586,285
2,715
5995
San Ramon Bypass Pump
55,000
44,391
10,609
6003
San Ramon Pumping Station Upgrades
452,000
424,331
27,669
8401
Walnut Creek Sewer Renovations - Phase 9
3,088,000
3,097,032
-9,032
8407
Martinez Bypass Pump
200,000
91,684
108,316
8409
Pump Station SCADA O &M Manual
20,000
12,480
7,520
Program Totals
$9,046,704
$8,769,301
$277,403
GENERAL IMPROVEMENTS PROGRAM CLOSING PROJECTS
DISTRICT
PROJECT NO.
PROJECT TITLE
ALLOCATED
BUDGET
EXPENDITURES
AS OF 6130114
UNDERRUN
(OVERRUN)
8225
Imhoff Triangle Development
63,000
58,321
4,679
8229
Martinez Easement Acquisition
130,000
115,0521
14,948
8513
lVehicle & Equipment Acquisition FY 2012 -13
793,643
793,643
0
Program Totals
$986,643
$967,016
$19,627
RECYCLED WATER PROGRAM CLOSING PROJECTS
DISTRICT
PROJECT TITLE
ALLOCATED
EXPENDITURES
UNDERRUN
PROJECT NO.
BUDGET
AS OF 6130114
(OVERRUN)
No Reycled Water projects closed in 2013 -14
Program Totals
$0
$0
$0
TOTALS: $17,978,347 $17,202,910 $775,437
Attachment 2
Project Descriptions -- 2014 Closing Projects
TREATMENT PLANT PROGRAM
Project # Project Title
7241 Wet Weather Bypass Improvements
The Wet Weather Bypass Improvements project modified and constructed new facilities
to accommodate large wet weather treatment plant flows. The project widened the
Bypass Channel, installed a concrete box culvert, and built a gated bypass structure on
the Lower Walnut Creek levee along Basin B. Extensive permitting from multiple
agencies was required to complete the project. Due to regulatory requirements, the
project was kept open for several years beyond the contract acceptance in order to
comply with environmental monitoring obligations on the Walnut Creek Channel.
Contract contingency was used to fund the regulatory efforts performed by consultants
and District staff.
7268 Treatment Plant Facilities Renovations
The Treatment Plant Facilities Renovations project is part of an ongoing program in the
Treatment Plant. This phase was used to help identify future facility renovation projects
in conjunction with the Treatment Plant Asset Management Plan project. Future projects
will be created for replacement needs of equipment.
7269 Treatment Plant Asset Management
The intent of this project was to develop a capital project forecasting tool for the
treatment plant. Asset data was improved in the Computerized Maintenance
Management System (CMMS), including service life estimates, condition, consequence
of failure, cost estimates, etc. Condition assessments were conducted for concrete
structures and asphalt pavement. A desktop evaluation was conducted to inventory the
piping within the treatment plant and provide an approximate cost estimate. Three
status reports were developed to document the project. The asset management
program development is being expanded throughout the District and will continue in the
next fiscal year under a new project number.
7272 Aeration System Renovation
Several consultant studies were conducted under this project that impacts the aeration
process and blowers. Such studies included nitrification and nutrient removal to help
develop long term financial capital planning. The project scope was delayed due to
significant air savings achieved by the aeration basin renovation project. A future project
will be created to address the electrical blower and improvements identified from the
analysis conducted under this project.
7283 Fire Protection System Improvements
The Fire Protection System Improvements project upgraded the entire Headquarters
Office Building fire alarm system and repaired several deficiencies within the treatment
plant. The new system has been upgraded to current Americans with Disabilities Act
(ADA) and National Fire Protection Agency (NFPA) standards and in compliance with
the local Fire Department.
Attachment 2
Project Descriptions -- 2014 Closing Projects
7287 Treatment Plant Master Plan Update
This project included the Plant of the Future Visioning exercise where two consultants
developed conceptual plans for the District to become the Plant of the Future
considering current or impending technologies, sustainable practices, and several
regulatory scenarios. The proposals and presentations were reviewed by the District
and a third -party technical review panel comprised of industry experts. This project also
included development and calibration of a wastewater treatment process simulation
model using BioWin software and included a summary report describing the process
model development and calibration approach. As a result of work accomplished under
DP 7287, Plant of the Future Roadmap was included in the FY14/15 CIB to support the
Zeolite - Anammox pilot and other efforts on a Master Plan.
7294 Secondary Process Improvements
This project identified several scope items that were constructed under separate
construction projects or postponed to future projects. These items include replacing
Return Activated Sludge (RAS) piping, gates, and future improvements to the waste
activated sludge system.
7295 Auxiliary Boiler Burner Upgrade
This project retrofitted both treatment plant auxiliary boilers with new ultra -low nitrogen
oxides (NOx) burners and other emission controls to meet regulations required by the
Bay Area Air Quality Management District. The project results allowed the boilers to
meet the current NOx permit limit of 15 ppm.
7296 Solids Conditioning Building Seismic Upgrade Study
A report presenting seismic retrofit options to the building and furnaces was completed
under this project. However, due to the uncertainty of new regulatory requirements and
future solids handling projects, the seismic upgrades are not recommended at this time.
This study may be used to help future projects within the Solids Conditioning Building.
7298 Piping Renovations Phase 7
This project was the 7t" phase of a multiple -phase treatment plant piping renovation
program. The project included replacement of RAS piping and valves at the clarifiers,
Solids Conditioning Building (SCB) centrate piping, ash dust collector, recycled water
sluice gates, improvements to the ventilation and odor control at the sludge loading
facility, and furnace scrubber water instrumentation improvements.
7313 Solids Handling Equipment Evaluation
This project was used to help plan for replacement of the existing centrifuges and to
fund a pilot study carried out by a vendor. Staff is continuing to evaluate the equipment.
The reports prepared under this project will be helpful to determine future replacement
of the centrifuges. Any additional planning, studies or pilots will be conducted under the
Centrifuge and Cake Pump Upgrades project.
Attachment 2
Project Descriptions -- 2014 Closing Projects
COLLECTION SYSTEM PROGRAM
Project # Project Title
5773 Smith Road Contractual Assessment District
Smith Road Contractual Assessment District (CAD) 2012 -1 designed and constructed
approximately 594 linear feet of sanitary sewer pipeline, together with appurtenant work
and facilities along Smith Road in Alamo. The project serves 7 residential properties.
5937 Alhambra Valley Assessment Districts
This project provided funds for a financing mechanism, Alhambra Valley Assessment
Districts (AVADs) for extension of public sewers into areas of the Alhambra Valley
currently served by septic tanks. The goals of the AVAD program were to assist
property owners with septic tanks to finance the cost of extending and connecting to the
public sewer; to avoid future use of septic systems and sewage pumping systems in the
Alhambra Valley; and to facilitate direct and indirect connections to the Alhambra Valley
trunk sewer. Six neighborhood sewer projects were financed through the AVAD
program in 2007 and 2008, but there has been no interest since. If interest renews and
the Board chooses to continue the program, new funding will be requested and a new
capital program established.
5948 TV Inspection
This project was a multi -year effort to gather video and condition data on the gravity
pipes within the District's sewer collection system. The inspection data is integrated
with the District's Geographic Data Integration (GDI) system, and together with previous
inspection data on sewers, adds to the historical record of pipeline condition. The data
is used to avert potential sewer overflows by identifying sewers in urgent need of
cleaning, and adjusting maintenance schedules to an optimum cleaning frequency. The
data is also used to assist in developing the District's Collection System Asset
Management Plan. This is the final TV Inspection Project under the capital budget. The
CCTV inspection program is now funded in the operations and maintenance budget.
5955 Suspended Pipe Support
This project identified and evaluated the 49 pipelines suspended from bridges
throughout the District's service area, then evaluated each for compliance with seismic
support requirements. Eight pipe support systems were identified as being inadequate
by a consultant structural engineer and the support systems were repaired and
upgraded. These included seven sanitary sewers and one recycled water line.
5973 North Orinda Sewer Renovations, Phase 4
This project is the fourth phase of multiple phases to renovate sewer pipelines as part of
the ongoing Collection System Renovation Program. This project installed
approximately 14,700 linear feet of 6 -, 8 -, and 15 -inch sewer lines within the public right
of way and in easements in the City of Orinda. This project used a variety of
construction methods including pipebursting, sliplining, open cut, and Horizontal
Directional Drilling (HDD). The contract contingency was used to repair an additional
Attachment 2
Project Descriptions -- 2014 Closing Projects
610 linear feet of sewer lines ranging from 6" to 15" diameter that was identified to be in
need of urgent repairs after the contract was awarded.
5995 San Ramon Bypass Pump
Under this project, Engineering staff, in consultation with Pump Station staff, evaluated
the need for a portable emergency bypass pump for the San Ramon Pumping Station.
The evaluation determined that the purchase of the pump, at a cost of $282,000, is not
necessary or cost effective at this time.
6003 San Ramon Pumping Station Upgrades
The San Ramon Pumping Station Upgrades project replaced a 100 -hp pump with a new
250 -hp pump to convey increasing wastewater flows from development in the
Dougherty Valley.
8401 Walnut Creek Sewer Renovations, Phase 9
This project is the ninth phase of multiple phases to renovate sewer pipelines as part of
the ongoing Collection System Renovation Program. This project installed
approximately 10, 700 linear feet of 6 -, 8 -, and 10 -inch sewer lines within public right of
way and in easements in Contra Costa County and in the City of Walnut Creek.
Construction methods included pipebursting and open cut. The contract contingency
was used to repair sanitary sewer lines that were damaged by others, for urgent repair
of a sewer siphon, and for the restoration of a drainage swale that was not identified by
the Contra Costa County Flood Control District during the design phase.
8407 Martinez Bypass Pump
During this project Engineering Staff, in consultation with Pump Station Staff, specified
and purchased a portable emergency bypass pump for the Martinez Pump Station.
8409 Pump Station SCADA O &M Manual
As a follow -up to the completion of the Pumping Station Supervisory Control and Data
Acquisition ( SCADA) Project, an operation manual for use by the pumping station staff
was developed in order to document the operation of the SCADA system.
Attachment 2
Project Descriptions -- 2014 Closing Projects
GENERAL IMPROVEMENTS PROGRAM
Project # Project Title
8225 Imhoff Triangle Development
Central San acquired approximately 1.1 acres of land west of the Household Hazardous
Waste Facility. Over the years, several possible uses for the property have been
proposed. In 2007, a Capital Project was created to look at various alternatives to
develop the property. A report was prepared outlining the environmental mitigation
steps that would be required to develop the property and several minor improvements,
such as fencing, have been made to the parcel. The parcel is currently used as buffer
property and there are plans to develop it.
8229 Martinez Easements
Central San took over the City of Martinez sewer collection system in 1967. As -built
plans and property rights documentation for the system was largely not available. A
separate capital project was established in 2008 to track costs associated with
researching and documenting property rights associated with sewer lines within the City
of Martinez as well as acquiring new easements where needed. This Capital Project
supported Martinez Sewer Renovation Phases 2 and 3. Capital costs for Martinez
Sewer Renovation Phase 4 are currently being charged directly to that project.
8513 2012 -13 Equipment and Vehicles Acquisition
This project provided funding for safe and cost - effective vehicles and equipment for FY
2012 -13. The project did not close at the end of FY 2012 -13 because of the late
delivery of one vehicle.
RECYCLED WATER PROGRAM