Loading...
HomeMy WebLinkAbout04. (Handout) Regional Renewable Energy Procurement0 FJ Regional Renewable Energy Procurement April 21, 2014 Engineering & Operations Committee Meeting Planning Group Central Contra Costa Sanitary District Background • Entered into MOU in January 2013 • 2 CSO sites (main building and vehicle repair shop) and our HHWCF were included. • Alameda County put project out to bid in late Summer 2013. • Proposals were due mid - January 2014. • Alameda County evaluated 12 bids and selected SunEdison as the winning vendor last month. • Pace is accelerating due to some agencies having deadlines to meet (CSI and Climate Action Plan). 4/21/2014 44. 1 i c,ecision Criteria for Evaluatinj� 20-Year Solar PPA • Economic only decision? • Triple bottom line? (financial, social, environmental equally weighted) • Support strategic plan? ➢Goal 1, Strategy 3 of Strategic Plan: "Explore technologies that use less energy and produce less greenhouse gases" ➢Goal 4, Strategy :1 of Strategic Plan: "Become a "Net Zero Consumer" consistent with best practice Utility of the Future models." CSO Main Building PPA- Initial Price $0..1698 per kWh PPA- Net Beneflt(20- years) $450,000 4/21/2014 2 4/21/2014 HHWC PPA- initial Price $0.2066 per kWh PPA- Net Beneflt(20•Years) $55,000 Vehicle Repair Shop PPA- Initial Price $0.2115 per kWh PPA- Not Beneflt(20- Years) $70,000 'I • All solar systems result in net energy savings • Savings begin in Year 1 of PPA • Minimal energy savings with HHW and Vehicle Repair Shop solar systems • Most energy savings with CSO solar system Benefits /Disadvantages of 20 -Year Solar PPA • Benefits • Energy cost savings • Energy independence /cost stability • Reduced carbon footprint • Participant in high visibility regional procurement effort • Shaded storage /carports provided with canopy structures • Supports strategic plan initiative to reduce imported energy • Disadvantages • Minimal energy savings over the long -term, particularly with HHW and Vehicle Repair Buildings • Unforeseen costs (administrative, site modifications, etc) 4/21/2014 E Board Direction on Criteria for Evaluating 20 -Year Solar PPA • Economic only decision? • Triple bottom line? (financial, social, environmental equally weighted) • Support strategic plan? ➢Goal 1, Strategy 3 of Strategic Plan: "Explore technologies that use less energy and produce less greenhouse gases" ➢Goal 4, Strategy 1 of Strategic Plan: "Become a "Net Zero Consumer" consistent with best practice Utility of the Future models." 4/21/2014 5