HomeMy WebLinkAbout07. FY 2014-15 Projects Completed/ClosedProjects Completed /Closed in FY 2014 -15 October 7, 2015 Engineering and Operations Committee Meeting Edgar J. Lopez, PE Capital Projects Division Manager Central Contra Costa Sanitary District FY 14 -15 Closed Projects by CIB Program Program Total Expenditures Treatment Plant $4,499,067 General Improvements $7,890,446 Recycled Water $1,796,977 Collection System $6,664,545 Total $20,851,035 \I 7 1 Treatment Plant Program > $1 million Project Title Total Expenditures Treatment Plant Equipment Replacement $ 1,288,762 Cogen Controls Upgrade $ 1,390,232 DAF Tanks Renovation $ 1,049,476 Treatment Plant Equipment Replacement Project Purpose: • Replace and repair obsolete, failed, and worn treatment plant process equipment. Scope of Work: • HVAC Equipment • 3WHP Pump • How water heat exchanger & tank at Lab • Boiler feedwater steam turbine governors • DAFT skimmer arms (Tank Nos. 1 & 2) • Progressive cavity pumps • Miscellaneous treatment plant equipment 2 Financial Summary Equipment $1,066,786 Enqr, Tech Svc, Admin (17.2 %) $ 221,976 Total Expenditures $1,288,762 New How Water Heat Exchanger & Tank New3WHP Pump Cogen. Controls Upgrade Project Project Purpose: Replace obsolete control system and fuel system with new control system. Scope of Work: Replace electro- pneumatic fuel controls with electronic fuel controls. Replace obsolete control panel with new control panel. Replace associated field instruments. Replace hydraulic start system with electric motor driven start system. EI Financial Summary Construction Contracts $ 766,382 (Solar Turbines & Amp Electric) Change Orders (21.3 %) $ 163,257 Total Construction Contract $ 929,639 Enqr., CM, Admin. (33.1 %) $ 460,593 Total Expenditures $1,390,232 5 Temporary Ramp for Control Panel Moving Control Panel into Position A r-- i Tight fit _ J through Control , Room 9 DAF Tanks Renovations Project Purpose: • Preserve /Extend life of equipment • Replace corroded process & electrical equipment Scope of Work: • Sandblast & Coat Steel • New Arms on DAF Tank No. 2 (District Furnished) • New Variable Frequency Drives & Electrical Financial Summary Construction Contract $ 617,000 (W.M. Lyles) Change Orders (13.9 %) $ 86,066 Total Construction Contract $ 703,066 Engr, Design, CM, Admin (33 %) $ 346,410 Total Expenditures $1,049,476 7 S General Improvements Program > $1 million Project Title Expenditures HOB Seismic Improvements $ 5,910,213 HOB Seismic Improvements Project Purpose: Seismically improve HOB to provide an enhanced life safety level of structural performance. Scope of Work: • Interior steel columns retrofitted. • Relocated staff to Concord and other locations. • Coordinated other improvements such as the fire alarm upgrade, network cabling improvements, and general interior work (i.e. painting, carpeting, ADA modifications) Recycled Water Program > $1 million Project Title I Expenditures Recycled Water Planning 1 $ 1,786,893 Collection System Program > $1 million Project Title Total Expenditures Diablo Sewer Renovation, Ph 2 $3,489,704 2013 CIPP Project $2,974,809 10 Diablo Renovations, Phase 2 Project Purpose: Replace /Renovate deteriorating and high maintenance sewer lines Scope of Work: Reconstruct approximately 9,400 linear feet of 6- to 12 -inch sewers in o, Financial Summary Construction Contract $ 2,085,370 (California Trenchless, Inc.) Change Orders $0 Total Construction $2,085,370 Right -of -Way (13.4 %) $279,776 Survey (13.6 %) $284,499 Enqr, CM, Admin (40.3 %) $840,059 Total Expenditures $3,489,704 - -CCD_ I � �'( 9 k 11 Diablo Renovations, Phase 2 Location Map 12 Saw Cut Prior to Excavating Concrete Restoration 13 2013 CIPP Project Project Purpose: Renovate /rehabilitate large diameter sewer lines that have high level of corrosion damage. Scope of Work: Renovate /rehabilitate approximately 6,200 linear feet of large diameter deteriorated sewer lines located in Walnut Creek and Martinez by cured -in- place lining. Financial Summary Construction Contract $2,046,630 (California Trenchless, Inc.) Change Orders -Project related (8.1 %) $ 165,954 *Added work (1.2 %) $ 25,244 Total Construction Contract $2,237,828 Right -of -Way (0.5 %) $ 11,051 Survey (0.1 %) $ 2,167 Engr., CM, Admin (32.3 %) $ 723,763 Total Expenditures $2,974,809 14 smr Prgsn Ann RuuntNM 0 „� VV&WM Croak 2013 CIPP Project Location Map 15 Prq Locations 2013 CIPP Project Location Map 15 it-I 17 Questions? _may Treatment Plant Program < $1 million Project Title Total Expenditures TP Cathodic Protection $ 598,049 System Replacement POB Seismic Upgrade Study $ 147,826 PE Pump Refurbishment, $ 24,722 Phase 2 General Improvements Program < $1 million w 1- Project Title Project Title Expenditures Expenditures Capital Imp Plan &Budget Capital Imp Plan &Budget $ 902,379 $ 902,379 District Safety Improvements District Safety Improvements $ 218,769 $ 218,769 2013 -14 Equipment &Vehicles 2013 -14 Equipment &Vehicles $ 859,085 $ 859,085 Recycled Water Program < $1 million Project Title Expenditures RW Cathodic Protection $ 10,084 19 Collection System Program < $1 million Project Title Total Expenditures Cathodic Protection System Repl $ 200,032 ce