HomeMy WebLinkAbout09.a. Amend agreement with V&A Consulting Engineers re flow monitoringCentral Contra Costa Sanitary District ' BOARD OF DIRECTORS , Q. POSITION PAPER Board Meeting Date: SEPTEMBER 17, 2015 Subject: AUTHORIZE THE GENERAL MANAGER TO EXECUTE AN AGREEMENT AMENDMENT TO INCREASE THE COST CEILING FROM $160,000 UP TO $560,000 WITH V&A CONSULTING ENGINEERS FOR THE COLLECTION SYSTEM MODELING UPGRADE, DISTRICT PROJECT 8418 Submitted By: Initiating Dept. /Div.: Dan Frost, Senior Engineer Engineering & Technical Services / Planning & Developme ervices REVIEWED AND RECOMMENDED FOR BOARD ACTION: D. Gemmell — Planning & Development Services Division Mgr. I .A* K. E. Lopez — Capital Projects Division Manager Roger S. Bailey JM. Petit — Director of Engineering & Technical Services General Manager ISSUE: Board of Directors' authorization is required for the General Manager to execute an amendment to an existing agreement in the amount greater than $100,000 or 15 percent above the original agreement amount. BACKGROUND: Collection System Hydraulic Model The District's collection system hydraulic model is a critical tool used to predict flows, analyze impacts of point discharges, investigate impacts of proposed and future development and provide crucial flow information for strategic planning, asset management and Capital Project design for the District's collection system and wastewater treatment plant. The District began the conversion to a new dynamic model in 2012 from the existing steady state model, ArcSNAP. The new dynamic model will more accurately simulate the hydraulic complexities of the District's collection system and will bring the District up to current hydraulic modeling standards used in the wastewater industry. Most public agencies, including the City of San Jose, San Francisco Public Utilities Commission, Sacramento Regional Sewer District, and many others, have converted to dynamic modeling. Before the model can be confidently implemented, two processes must be completed: 1) the model network configuration; and, 2) the model calibration. To verify that the model network matches field conditions and correctly models the network's hydraulic response, it is critical that flow monitoring is performed and that the model is calibrated to the flow monitoring data. C:\ Users \danderson\AppData \Local \Microsoft \Windows \Temporary Internet Files\ Content .Outlook \IM9F5ZMU \9 -17 -15 Project PP_Auth GM to Award Flow Monitoring Final (2).docx Page 1 of 5 POSITION PAPER Board Meeting Date: SEPTEMBER 17, 2015 subject: AUTHORIZE THE GENERAL MANAGER TO EXECUTE AN AGREEMENT AMENDMENT TO INCREASE THE COST CEILING FROM $160,000 UP TO $560,000 WITH V&A CONSULTING ENGINEERS FOR THE COLLECTION SYSTEM MODELING UPGRADE, DISTRICT PROJECT 8418 District's Flow Monitorinq History System -wide flow monitoring has been conducted twice over the past 30 years, in 1985 and in early 2005. The first flow monitoring (1985) was the foundation for what became the District's steady state hydraulic model. The second flow monitoring (2005) was focused on the relationship of pipe deterioration to inflow /infiltration, particularly for sewers constructed between 1985 and 2004. In late 2014, the District began a flow monitoring program with the intent of calibrating the new dynamic model. The current flow monitoring program, approved by the Board in 2014, included conducting limited flow monitoring during winter 2014 -15 and determining if additional flow monitoring is recommended. 2014 -15 Flow Monitoring Results The 2014 -15 flow monitoring was conducted between February 2015 and mid -April 2015 at 36 sites on the collection system trunk sewers for nine weeks. Winter 2014 -15 was a continuation of drought conditions and rainfall was relatively low compared to a typical wet weather season. Only two storm events were captured during the monitoring period, with each event preceded by significant dry periods. When soils are not saturated, the rate of inflow /infiltration tends to be underestimated. The flow data obtained from the winter 2014 -15 flow monitoring provides a basis for an initial quantification of inflow and infiltration response in the collection system. However, the results did not represent saturated soil or maximum response conditions which are needed for developing a design storm event response for accurate model calibration. The District's CWMP consultant and District staff are recommending additional flow monitoring during the upcoming 2015 -16 winter season, which is forecasted to produce more wet weather than the past winter. The monitoring would include areas showing significant flow response during the past winter and would provide hydraulic data at a level of refinement necessary to calibrate the model for wet weather events, particularly for smaller trunk sewer areas and in areas with high infiltration and inflow. Benefits of the additional flow monitoring include: • System -wide flow data for storm events under more favorable (wetter winter) antecedent conditions. • More accurate model calibration and wet weather flow predictions for both large and small trunk lines. C: \Users \danderson\AppData \Local \Microsoft \Windows \Temporary Internet Files\ Content .Outlook \IM9F5ZMU \9 -17 -15 Project PP Auth GM to Award Flow Monitoring Final (2).docx Page 2 of 5 POSITION PAPER Board Meeting Date: SEPTEMBER 17, 2015 subject: AUTHORIZE THE GENERAL MANAGER TO EXECUTE AN AGREEMENT AMENDMENT TO INCREASE THE COST CEILING FROM $160,000 UP TO $560,000 WITH V&A CONSULTING ENGINEERS FOR THE COLLECTION SYSTEM MODELING UPGRADE, DISTRICT PROJECT 8418 • More refined and reliable assessment of hydraulic deficiencies and resulting capital improvements. This winter has a higher probability of producing a typical or normal wet weather pattern. On July 9, 2015, the National Oceanic and Atmospheric Administration Climate Prediction Center announced an "El Nino" advisory indicating El Nino conditions are presently observed, and stated there is a 90 percent chance the El Nino event will last through the northern hemisphere winter of 2015 -16. El Nino events typically are associated with above normal precipitation in California and other states. The flow monitoring planned for this winter is necessary to assess the hydraulic behavior of the present collection system infrastructure and calibrate the new collection system model to enable representative simulations of base sewer flows and peak design event sewer flows in the new InfoWorks® model. The District's hydraulic model is used frequently to assess the hydraulic impact of new commercial developments on District sewers and to identify capacity - related capital improvement projects. As part of the CWMP, the calibrated model will be used to identify potential new capacity - related capital improvements and to confirm the $35.7M in capacity - related (expansion) capital improvements currently identified in the District's 10 -year Capital Improvement Plan. Consultant Selection In 2014, using a competitive selection process, District staff selected V&A Consulting Engineers to conduct flow monitoring. On December 18, 2014, the Board approved an Engineering Services Agreement with V &A Consulting Engineers to conduct 2014 -15 flow monitoring in an amount not to exceed $160,000. The scope of work also included an option for 2015 -16 flow monitoring at the District's discretion that includes 70 flow meters and five rain gauges at a cost of $295,000 for a period of nine weeks. Because of the uncertainty of weather conditions, an additional four weeks of monitoring has been negotiated with V&A Consulting Engineers as a contingency for a cost of $105,000. This brings the total cost of 2015 -16 wet weather flow monitoring to $400,000 for a period of 13 weeks. The new contract ceiling will be $560,000. Staff intends to work with V &A Consulting Engineers, in consultation with weather forecasts, to install flow meters after soils have been estimated to be saturated and wet weather is expected. If the wet weather season is typical, nine weeks of flow monitoring is sufficient and the meters will be removed. However, if storms do not materialize as forecasted or storms are significantly spread out, flow monitoring may continue for the entire 13 week period. Ideally, we will collect flow data for multiple, significant storm C:\ Users\ danderson \AppData \Local\Microsoft \Windows \Temporary Internet Files\ Content .Outlook \IM9F5ZMU \9 -17 -15 Project PP_Auth GM to Award Flow Monitoring Final (2).docx Page 3 of 5 POSITION PAPER Board Meeting Date: SEPTEMBER 17, 2015 subject: AUTHORIZE THE GENERAL MANAGER TO EXECUTE AN AGREEMENT AMENDMENT TO INCREASE THE COST CEILING FROM $160,000 UP TO $560,000 WITH V&A CONSULTING ENGINEERS FOR THE COLLECTION SYSTEM MODELING UPGRADE, DISTRICT PROJECT 8418 events with saturated soil conditions. If there are no significant storms forecasted after nine weeks, flow monitoring will be terminated and the four -week contingency amount of $105,000 will not be spent. Prior to authorizing the additional four weeks, staff will present the status of the flow monitoring effort for winter 2015 -16 to the Engineering & Operations Committee for discussion. The CIB provides for contingency funding for capital projects. The program contingency is set aside in a separate account and used for new projects not identified in the CIB, or to fund budget overruns, and /or pay for urgent/emergency work as needed. The authorization limits for contingency spending are shown and approved annually in the CIB. Project Priority Critical, as shown in the CIB. CEQA: The Board concluded at the April 3, 2014, Board meeting that this project is exempt from the California Environmental Quality Act (CEQA) under District CEQA Guideline Section 15306 as the project involves data collection that will not result in a serious or major disturbance to an environmental resource. ALTERNATIVES /CONSIDERATIONS: Do not perform flow monitoring for winter 2015- 16. This alternative is not recommended, as there will be limited data to calibrate the new collection system hydraulic model. Staff relies on the model to conduct day to day operation and provide services to potential new development and customers. A calibrated model is desirable to provide more accurate and timely response to customers. Furthermore, the Comprehensive Wastewater Master Plan (CWMP) will also rely on a calibrated model to determine potential capacity deficiencies of the collection system. FINANCIAL IMPACTS: The total estimated project cost for the Collection System Modeling Upgrade project in the Fiscal Year (FY) 2015 -16 Capital Improvement Budget (CIB) is $950,000. This amendment will increase the budget from $950,000 to $1,350,000. The FY 2015 -16 Collection System Program Contingency Account originally had $900,000 budgeted. To date the remaining contingency is $660,000. An allocation of $400,000 to the Collection System Modeling project is needed to fund this amendment. This will leave a balance of $260,000 in the Collection System program contingency account. C:\ Users \danderson\AppData \Local \Microsoft \Windows \Temporary Internet Files\ Content .Outlook\IM9F5ZMU \9 -17 -15 Project PP_Auth GM to Award Flow Monitoring Final (2).docx Page 4 of 5 POSITION PAPER Board Meeting Date: SEPTEMBER 17, 2015 Subject: AUTHORIZE THE GENERAL MANAGER TO EXECUTE AN AGREEMENT AMENDMENT TO INCREASE THE COST CEILING FROM $160,000 UP TO $560,000 WITH V&A CONSULTING ENGINEERS FOR THE COLLECTION SYSTEM MODELING UPGRADE, DISTRICT PROJECT 8418 By using contingency, this project will not delay or defund other projects within the Collection System Program. The projected cash flow and total estimated expenditures for the Collection System Program are within the amount approved in the CIB. COMMITTEE RECOMMENDATION: The Engineering and Operations Committee reviewed this project at its meeting on August 26, 2015, no recommendation was provided. RECOMMENDED BOARD ACTION: Authorize the General Manager to amend an existing Engineering Services Agreement with V &A Consulting Engineers, Agreement No. 042498, in an amount not to exceed $400,000, increasing the contract ceiling to $560,000 for the Collection System Modeling Upgrade, District Project 8418. Attached Supporting Document., 1. PowerPoint Presentation C:\ Users \danderson\AppData \Local \Microsoft \Windows \Temporary Internet Files\ Content .Outlook \IM9F5ZMU \9 -17 -15 Project PP Auth GM to Award Flow Monitoring Final.docx Page 5 of 5