HomeMy WebLinkAbout04. Headworks Screening Upgrade and Sub 16 Switchgear Replacement4. HEADWORKS SCREENING UPGRADE AND SUB 16 SWITCHGEAR REPLACEMENT September 9, 2015 Engineering and Operations Committee Meeting Brad Leidecker, Associate Engineer Central Contra Costa Sanitary District Background • Headworks Screens and Electrical Switchgear Installed in 1993 • Screenings Discharged to Grinders and Re- introduced — Value Engineered, 1991 • Switchgear Feeds Headworks Screens and Influent Pumps • Projects Combined for Coordination and Efficiency =*0 - � 1 Project Drivers • Equipment Fouling — Liquid and Solids Streams • Future Maintenance of Equipment and Availability of Parts • Potential HCL Emission Improvements • Improve Odor Control • Potential Final Effluent Turbidity /Floatables • Switchgear Reliability — Parts Availability: Short Production Run, Obsolete Parts — Reconditioning Service: Poor Quality — Breaker Tests: Several Breakers Failed Testing — Corrosion Project Descriptions • Headworks Screening Upgrades (DP 7327): - Evaluate Alternatives for Screening of Raw Wastewater and Handling of Screenings at the Existing Headworks and Recommend the Most Strategic and Cost Effective Solution - Proceed with Design and Construction to Implement the Recommended Solution • Headworks (Sub 16) Electrical Switchgear Replacement (DP 7324): - Remove and Replace the Existing Switchgear including Modifications to the Existing Building as Required M- 61 Sub 16 Switchgear :61� Schedule Request for Proposals from Consultants Issued August 19, 2015 Consultant Notice to Proceed November 2, 2015 Switchgear Preliminary and Final Design March 2016 Complete Headworks Screening Preliminary and Final August 2016 Design Complete Switchgear Replacement Construction October 2016 Complete Headworks Screening Upgrades Construction November 2017 Complete Project Budget • Fiscal Year 2015 -16 CIB Total Estimated Project Budgets: — Headworks Screening Improvements $6.91VI — Switchgear Replacement $2.1 M 5 Questions