Loading...
HomeMy WebLinkAbout06.d.1)f) Action Summary 7-1-15 Engineering & Operations Committeecentral 6.a /),)C Sanitary District REGULAR MEETING OF THE BOARD OF DIRECTORS: CENTRAL CONTRA COSTA MICHAEL R.MCGILL SANITARY DISTRICT President ENGINEERING & OPERATIONS TAD J. P/LECKI President Pro Tern COMMITTEE PAUL H. CAUSEY JAMES A. NEJEDLY DAVID R. WILLIAMS ACTION SUMMARY PHONE: (925) 228 -9500 FAX: (925) 676 -7211 Chair Causey www.centralsan.org Member Nejedly Wednesday, July 1, 2015 3:00 p.m. 2nd Floor Conference Room 5019 Imhoff Place Martinez, California PRESENT: Chair Paul Causey, Member Jim Nejedly, General Manager Roger Bailey, Deputy General Manager Ann Sasaki, Director of Engineering and Technical Services Jean -Marc Petit, Capital Projects Division Manager Edgar Lopez, Environmental and Regulatory Compliance Division Manager Lori Schectel, Senior Engineer Sasha Mestetsky, Senior Accountant Chris Thomas, and Senior Administrative Technician Cindy Granzella Call Meeting to Order Chair Causey called the meeting to order at 3:00 p.m. 2. Public Comments None. 3. Review draft Position Paper to award construction contract to K. J. Woods Construction, Inc. in the amount of $2,328,000 for the Martinez Sewer Renovations, Phase 4, District Project 8415 Capital Projects Division Manager Edgar Lopez reviewed the draft Position Paper included in the agenda materials. He distributed an updated Position Paper, which included wording to reflect that 32 easements were acquired in relation to this project. Engineering & Operations Committee Action Summary July 1, 2015 Page 2 Chair Causey asked if a report was available on all easements the District has acquired. Director of Engineering and Technical Services Jean -Marc Petit explained that there is no easily accessible report available at this time; however, Senior Engineer Sasha Mestetsky stated that this is a future project that the department would like to accomplish once the Environmental Systems Research Institute (ESRI) Geographic Information Systems (GIS) project is completed. . Chair Causey stated that there had been previous conversations about the City of Martinez paying for the easement acquisition cost for projects located within the City of Martinez, and asked how the payment situation will be handled. General Manager Roger Bailey stated that it can be added as a future item to discuss with the Martinez City Manager. If no progress can be made in conversation with the City Manager, the Board may need to establish a policy regarding cost recovery. COMMITTEE ACTION: Recommended Board approval. *4. Discuss construction management relating to inspection services Mr. Lopez distributed a table showing District Collection System Rehabilitation Projects from 2003 to present with a breakdown of design cost, construction management cost, total project delivery, and total construction costs (attached). Mr. Petit explained that this was presented to the Committee and full Board last year, and was updated to include two recent projects. He would like to continue using this table as a tool to update the Committee. Chair Causey requested that older projects be removed from future reports, since the full cost breakdown was not tracked. COMMITTEE ACTION: Received report and provided input to staff. 5. Standing Items a. Review schedule and discuss upcoming bids and awards and discuss change orders over $50,000, if needed — no report b. Receive report regarding any projects approaching a budget overrun within the 15 percent General Manager authority — no report C. Receive presentation on projects whose costs exceed 20 percent of the number quoted in the Capital Improvement Budget Allocation (CIBA), not including the 15 percent General Manager contingency — no report Engineering & Operations Committee Action Summary July 1, 2015 Page 3 d. Receive Change Order Log, Quarterly Reports, and Bid Schedules to compare budgeted versus actual costs Mr. Lopez reviewed the table included in the agenda materials. Chair Causey requested that it show all potential bid projects for this fiscal year COMMITTEE ACTION: Reviewed standing items and provided input to staff. 6. Announcements a. Future scheduled meetings: Wednesday, August 26, 2015 at 3:00 p.m. Wednesday, September 9, 2015 at 3:00 p.m. Wednesday, October 7, 2015 at 3:00 p.m. b. Mr. Petit introduced Lori Schectel, the District's new Environmental and Regulatory Compliance Division Manager. C. Chris Thomas, the District's new Senior Accountant, was also introduced. COMMITTEE ACTION: Received the announcements. 7. Suggestions for future agenda items None. 8. Adjournment — at 3:24 p.m. * Attachment 4. (" W) Project Name DP # Award Year Pipe Renovated (LF) Design Cost (Pre Bid Expenditures) Construction Management Cost Total Project Delivery (Includes Full Time Inspection) Total Construction Cost (TCC) (Incudes Bid, Const. Contingency and Permits) Total Project Cost (Not including RoW) Engineering & Public Relations Survey Drafting Total - Engineering, Survey and Drafting Right of Way Acquisition 1 2 3 4 5 =2 +3 +4 6 7 8 =5 +7 9 10 =8 +9 $ of Bid Cost (Column 9) Total $ % of Bid Cost (Column 9) $ % of Bid Cost (Column 9) Walnut Creek Sewer Renovations, Phase 1 5428 19- Jun -03 5,000 $ 265,000 26% $214,000 21% $ 479,000 47% $ 1,022,000 $ 1,501,000 Walnut Creek Sewer Renovations, Phase 2 5709 20- May -04 5,500 $ 210,000 18% $194,000 17% $ 404,000 35% $ 1,168,000 $ 1,572,000 Pleasant Hill Road East Improvements 5553 20- May -04 6,000 $ 260,000 14% $196,000 11% $ 456,000 25% $ 1,817,143 $ 2,273,143 South Orinda Sewer Improvements, Phase 2 5558 19- May -05 24,200 $ 270,000 13% $248,000 12% $ 518,000 25% $ 2,094,000 $ 2,612,000 Walnut Creek Sewer Renovations, Phase 3 5929 2- Jun -05 7,100 $ 185,000 12% $303,000 19% $ 488,000 31% $ 1,595,000 $ 2,083,000 North Orinda Sewer Renovations, Phase 1 5759 16- Jun -05 10,500 $ 280,000 11% $285,000 11% $ 565,000 22% $ 2,535,000 $ 3,100,000 Danville Sewer Renovations, Phase 1 5758 18- May -06 4,900 $ 210,000 17% $197,000 16% $ 407,000 33% $ 1,243,558 $ 1,650,558 North Orinda sewer Renovations, Phase 2 5833 6- Jul -06 9,700 $ 410,000 14% $295,000 10% $ 705,000 25% $ 2,862,000 $ 3,567,000 Walnut Creek Sewer Renovation, Phase 4 5826 3- Aug -06 7,900 $ 241,000 10% $295,000 12% $ 536,000 22% $ 2,395,000 $ 2,931,000 Walnut Creek Sewer Renovation, Phase 5 5964 10- May -07 6,500 $ 140,000 10% $170,000 12% $ 310,000 21% $ 1,460,000 $ 1,800,000 North Orinda sewer Renovations, Phase 2.1 5968 7- Jun -07 3,7001 $ 49,000 3% $171,000 9% $ 220,000 12% $ 1,846,000 $ 2,498,000 North Orinda sewer Renovations, Phase 3 5963 5- Jul -07 6,400 $ 149,500 14% $195,000 18% $ 344,500 32% $ 1,092,000 $ 1,439,000 Martinez Sewer Renovations, Phase 1 5975 9- Jul -07 2,650 $ 147,000 15% $120,000 12% $ 267,000 27% $ 982,000 $ 1,292,000 Walnut Creek Sewer Renovations, Phase 6 5972 1- May -08 9,800 $ 497,000 25% $230,000 12% $ 727,000 37% $ 1,970,000 $ 2,697,000 South Orinda sewer Renovations, Phase 3 5985 7- Aug -08 6,700 $ 195,000 1 15% $227,000 17% $ 422,000 32% $ 1,328,700 $ 1,750,700 Danville Sewer Renovations, Phase 2 5954 19- Mar -09 1,300 $ 48,000 22% $65,000 30% $ 113,000 52% $ 217,000 $ 330,000 South Orinda Sewer Renovations, Phase 4 5950 7- May -09 11,5001 $ 255,000 $ 120,000 $ 375,000 27% $ 359,000 $215,000 16% $ 590,000 43% $ 1,379,000 $ 1,969,000 Lafayette Sewer Renovations, Phase 6 5958 18- Jun -09 13,200 $ 250,000 $ 95,000 $ 345,000 21% $ 180,000 $215,000 13% $ 560,000 35% $ 1,607,000 $ 2,167,000 Pleasant Hill Sewer Renovations, Phase 1 5961 6- Aug -09 2,500 $ 122,000 $ 15,000 $ 137,000 38% $ 3,000 $77,000 21% $ 214,000 59% $ 365,000 $ 579,000 Walnut Creek Renovations, Phase 7 5974 6- Aug -09 11,000 $ 267,000 $ 68,000 $ 335,000 18% $ 157,000 $248,000 13% $ 583,000 31% $ 1,857,000 $ 2,440,000 Hall Drive Sewer Renovation, Phase 213 5932 20- May -10 2,600 $ 212,000 $ 86,000 $ 298,000 1 32% $ 271,000 $117,200 13% $ 415,200 45% $ 925,270 $ 1,340,470 Martinez Sewer Renovations, Phase 3 5952 5- Aug -30 5,350 $ 259,220 $ 81,365 $ 340,585 31% $ 230,000 $298,000 27% $ 638,585 58% 1 $ 1,102,942 $ 1,741,527 Diablo Sewer Renovations, Phase 1 5953 5- Aug -10 5,900 $ 323,000 $ 167,000 $ 490,000 32% $ 249,000 $252,000 17% $ 742,000 49% $ 1,510,000 $ 2,252,000 Lafayette- Pleasant Hill Road Trunk Sewer 5994 5- May -11 5,600 $ 259,000 $ 259,000 13% $ 6,000 $310,000 15% $ 569,000 28% $ 2,039,000 $ 2,608,000 South Orinda Sewer Renovations, Phase 5 5989 19- May -11 11,000 $ 383,000 $ 156,000 $ 539,000 30% $ 189,000 $250,000 14% $ 789,000 44% $ 1,779,000 $ 2,568,000 Lafayette Sewer Renovations, Phase 7 5990 16- Jun -11 14,000 $ 407,000 $ 106,000 $ 513,000 26% $ 35,000 $220,000 11% $ 733,000 37% $ 1,996,680 $ 2,729,680 Walnut Creek Renovations, Phase 8 5992 7- Jul -11 10,000 $ 267,000 $ 62,000 $ 329,000 21% $ 19,000 $185,000 12% $ 514,000 33% $ 1,548,700 $ 2,062,700 North Orinda Sewer Renovations, Phase 4 5973 17- May -12 14,400 $ 290,000 $ 81,000 $ 106,000 $ 477,000 26% $ 25,000 $280,000 15% $ 757,000 42% $ 1,807,000 $ 2,564,000 Walnut Creek Renovations, Phase 9 8401 21- Jun -12 12,000 $ 322,000 $ 150,000 $ 472,000 21% $ 38,000 $292,000 13% $ 764,000 33% $ 2,286,000 $ 3,050,000 Lafayette Sewer Renovations, Phase 8 8404 21- Mar -13 8,300 $ 376,000 $ 125,000 $ 501,000 32% $ 95,000 $234,000 15% $ 735,000 47% $ 1,549,500 $ 2,284,500 Diablo Sewer Renovations, Phase 2 5976 11- Jul -13 11,800 $ 290,000 $ 155,000 $ 113,000 $ 558,000 22% $ 120,000 $392,000 16% $ 950,000 38% $ 2,493,000 $ 3,443,000 North Orinda Sewer Renovations, Phase 5 8411 17- Apr -14 7,800 $ 300,000 $ 92,000 $ 103,000 $ 495,000 1 24% $ 70,000 $424,000 21% 1 $ 919,000 1 45% $ 2,031,000 $ 2,950,000 Walnut Creek Renovations, Phase 10 8413 3- Jul -14 8,500 $ 420,000 $ 183,000 $ 148,000 $ 751,000 28% $ 33,000 $430,000 16% $ 1,181,000 44% 1 $ 2,671,000 $ 3,852,000 Lafayette Sewer Renovation, Phase 9 8421 23- Apr -15 8,500 $ 360,000 $ 150,000 $ 95,000 $ 605,000 28% $ 45,000 $380,000 18% $ 985,000 46% $ 2,124,200 $ 3,109,200 Martinez Sewer Renovation, Phase 4 8415 9- Jul -15 8,200 $ 421,000 $ 125,000 $ 80,000 $ 626,000 24% $ 355,000 $381,000 15% $ 1,007,000 39% $ 2,560,000 $ 3,567,000 Average: 8,286 $ 342,917- 3... 2863;,' i ry -' - 1,f 1061$ 2,295,385 Total renovated since 2003 (CIPP, sliplining, interceptors, spot repairs projects are not included): 290,000 Industry Average for Pipe Systems Projects (CA Multi- Agency CIP Benchmarking Study. Annual Report - Updated 2013. Tables 3-6 and 7, Pages 29 and 30.) TCC - Total Construction Cost: construction contract, change orders, utility relocation, and construction by agency forces (CSO). Total Project Delivery - Includes Design and Construction Management. Does not include RoW. Public Outreach and Interagency coordination was not included in calculations of Industry Averages. Average TCC $ 760,000 $ 760,000 �J�JJ �JJJJJJJ � 1J rJ-1�� U-'JJJJJJJ'JJJ]'JJJ-� Table 3 -6 Project Delivery Costs by Project Type (% of TCC) (Full Range of TCC) Table 3 -7 Project Delivery Costs by Project Type (% of TCC) (Smaller Project Subset of TCC ) RMMI'-V c-) w o O g 00 o C p O 'V p a � :v o �3 Type N m = ° <' °• _ 0 Cr 3� fl'm` "•� �2: - o —o.o zo 3 2.35 88 Municipal Facilities 19% 14% 33% Parks 28% 21% 49% 0.49 53 Pipe Systems 23% 20% 42% 1.06 270 Streets 25% 20% 45% 0.74 244 Average 24% 19% 43% 0.92 655 Table 3 -7 Project Delivery Costs by Project Type (% of TCC) (Smaller Project Subset of TCC ) Notes: Project Delivery percentages represent arithmetic averages of the individual projects and do not represent the results from the regression analyses. 2 Project Delivery percentages vary from year to year based on the selection and the composition of the projects in the database. ' Total excludes projects delivered by alternative delivery mechanisms such a design - build, JOC, and CM@Risk. Projects delivered by alternative techniques are retained in the database but not analyzed. These projects are not included in the 655 projects selected for analysis in the Update 2013 Study. RMMI'-V c-) w o O g 00 o z p �o� owa d o.0 3 Tye N o_ o 0 2C 3� fl'm` "•� �2: - o —o.o zo 3 Municipal Facilities 21% 140/c 35% 1.00 1 70 Parks 30% 23% 53% 0.42 43 Pipe Systems 25% 21% 46% 0.76 217 Streets 27% 21% 48% 0.52 195 Average 26% 20% 46% 0.65 525 Notes: Project Delivery percentages represent arithmetic averages of the individual projects and do not represent the results from the regression analyses. 2 Project Delivery percentages vary from year to year based on the selection and the composition of the projects in the database. ' Total excludes projects delivered by alternative delivery mechanisms such a design - build, JOC, and CM@Risk. Projects delivered by alternative techniques are retained in the database but not analyzed. These projects are not included in the 655 projects selected for analysis in the Update 2013 Study.