HomeMy WebLinkAbout06.a.2) General Manager AnnouncementsBoard Meeting of July 9 201 5 (0.4A `
Written Announcements:
RECYCLED WATER
a) Residential Recycled Water Fill Station
The District's Residential Recycled Water Fill Station recently got some attention from the
press. On Monday, June 29, 2015, a radio reporter from KCBS visited the Fill Station and
interviewed Provisional Associate Engineer Melody LaBella. The interview aired on
KCBS' radio stations multiple times on the morning of Tuesday, June 30, 2015.
That radio interview spawned a visit on Tuesday, June 30, 2015, by Chuck Coppola a TV
reporter with NBC Bay Area, who interviewed Ms. LaBella along with some of the
District's fill station customers on- camera. The interview aired on NBC Bay Area during
the 5:00 and 11:00 news. The news segment may be viewed at:
http://www.nbcbayarea.com/ video / #! /on- air /as- seen -on /Central- Contra - Costa- Sanita[y-
District -Givin - Away- Free - Recycled- Water/311073331.
The most recent usage statistics for the Residential Recycled Water Fill Station are
attached.
EMPLOYEE APPRECIATION PICNIC
b) Reminder: Annual Employee Appreciation Picnic Scheduled for
July 15, 2015
This is a reminder that the 2015 Annual Employee Appreciation Picnic will be held on
Wednesday, July 15 from 11:30 a.m. to 1:30 p.m. Due to the increased traffic for the
recycled water fill stations, the location of the picnic has been moved to the area west of
the Lab. Grill Master Chefs -at -large will command the event, serving burgers and dogs
with all the fixings. The menu will also include salads, chips, dessert and drinks. All
Board Members, current employees, summer students, temps and co -ops are invited to
attend; however, the event is not open to family members or retirees.
LIABILITY INSURANCE
c) Excess Liability Coverage Renewed as of July 1, 2015
On June 4, 2015, the Board authorized the General Manager to renew the District's
excess liability coverage at a premium up to $350,000 given that the June 18th Board
meeting was cancelled and staff was in the process of obtaining quotes for the July 1St
Written Announcements
July 9, 2015
Page 2 of 4
renewal. The District's Fiscal Year 2014 -15 excess liability insurance with AIG, at an
annual premium of $234,000 for $1 million self- insured retention, with a $15 million limit,
expired June 30, 2015. Staff requested renewal quotes from excess liability carriers for
similar coverage as well as a lower retention of $500,000.
AIG quoted $254,696 to renew coverage at $1 million retention but refused to offer a
quote at $500,000 retention. The District's insurance broker also received one quote
from another insurer that provided coverage for inverse condemnation. AmTrust, through
the Alliant National Municipal Liability program, quoted $321,450 for coverage at
$500,000 retention with a $15 million limit.
Staff had previously estimated the additional premium to lower the retention from $1
million to $500,000 at $65,000. The difference between the AIG quote for $1 million and
the AmTrust quote for $500,000 retention is $66,754. Under the authority granted to the
General Manager by the Board on June 4th, staff secured the coverage with AmTrust on
June 26th effective July 1, 2015 through June 30, 2016. The premium increase was
partially mitigated by a corresponding $4,000 premium reduction in the District's primary
Employment Practices Liability insurance.
NACWA AWARD AND OUT -OF -STATE CONFERENCE
d) 2015 National Association of Clean Water Agencies (NACWA)
Platinum Peak Performance Award - Engineering and Technical
Services Department Employees to Attend Summer Conference in
Providence, Rhode Island, from July 12 -15, 2015
The District recently received notification that it has earned the Platinum Peak
Performance Award for 17 consecutive years of 100 percent National Pollutant Discharge
Elimination System (NPDES) permit compliance. The District will be recognized and
receive the award during the awards ceremony at the 2015 NACWA Summer Conference
in Providence, Rhode Island, from July 12 -15, 2015.
Three District employees in the Engineering and Technical Services Department
will attend the conference: Jean -Marc Petit, Director of Engineering and Technical
Services; Lori Schectel, Environmental and Regulatory Compliance Division Manager;
and Randy Schmidt, Senior Engineer for Regulatory Compliance. They will learn the
latest developments related to how utilities will embrace the principles and practices of
the Water Resources Utility of the Future (UOTF), and learn how they have begun to
stretch the boundaries of conventional municipal financing. They will also receive the
NACWA 17th Platinum Award on behalf of the District.
Staff attendance at this conference was included in the Fiscal Year 2015 -16 Technical
Training, Conference and Meetings Budget.
Written Announcements
July 9, 2015
Page 3 of 4
CAPACITY FEES
e) Oyama Sushi Promissory Note Fully Repaid
At the June 6, 2013 Board Meeting, the Board voted to authorize the General Manager to
execute a promissory note agreement with Oyama Sushi in Walnut Creek for installment
payment of capacity fees totaling $14,115.70 plus interest at 6 %. Staff completed the
agreement and the business owner has made regular monthly payments for two years.
The final payment was received on June 18, 2015.
STAFF UPDATE
f) Registration Differential for Assistant Engineer Chathura
Abeyrathna
The Memorandum of Understanding (MOU) between the Management Support/
Confidential Group (MS /CG) and the District provides that a one -step salary increase
shall be given to any full -time, regular employee who achieves registration as a
Professional Engineer while employed by the District in a position where such registration
is not required. The Assistant Engineer position does not require registration as a
Professional Engineer.
Assistant Engineer Chathura Abeyrathna has successfully passed the examinations for
licensing as a Professional Engineer in Mechanical Engineering. He has demonstrated
the ability to assist in the design of the Piping Renovations Phase 8 project, serve as
project manager for the Caustic Injection project and is consistently involved in design
and construction projects which require the professional level of judgment expected of a
Professional Engineer. The MOU states, "Such merit increase shall be subject to the
employee's demonstration of ability to assist in the accomplishment of District activities
requiring a level of skills and importance normally expected from a person with such
certification."
The District's Capital Improvements Program includes several complex projects in the
treatment plant and pumping stations that need to be designed and constructed in the
near future. These projects require extensive knowledge in the area of Mechanical
Engineering, thus it is beneficial to the District for Mr. Abeyrathna to be a licensed
Professional Engineer.
In accordance with the terms of the MOU, Mr. Abeyrathna received a one -step salary
increase effective May 29, 2015.
Written Announcements
July 9, 2015
Page 4 of 4
ENERGY CONSUMPTION
g) Quarterly Update on the District's Energy Consumption
In late 2014, the Engineering & Operations Committee suggested that staff provide
quarterly updates on the District's monthly energy consumption in the form of a written
announcement. The March 2015 update is attached.
RECYCLED WATER FILL STATION USAGE STATISTICS 10/14 - 06/24/15
Registered Users by Community
(10/25/14 through 06/24/15)
350
300
250 1 --
200
150
100
50
0
308 989 Registered Users
*OSA /Emp = Out of Service Area or Employee
3500
3000
2500
2000
1500
1000
S00 303
1,678
yea
Q
Number of Visits by Community
(10/25/14 through 06/24/15)
3,140
420
130
1324
Sao a\cJ `O OSQ\
J
■ III , ■ 81 81 91 ■ 14
0 _
ota�a i` °aa tip\\ Foc
O a`'ac cQ.a
Q�e 5a
*OSA /Emp = Out of Service Area or Employee
8,503 Visits
864
276
182
``eel
o `area
OyQ�
coo
J
a�
600,000
500,000
400,000
300,000 —
200,000
100,000 71,462
It
Gallons Taken by Community
(10/25/14 through 06/24/15)
534,255
1,557,538 Total Gallons Taken
°o ca ��e tie e1. a a
4 _ ■ 27,147
1630
5ac� �aF � s °sa
Q��a te �'b\* �� 05
coo
J
Registered Users by Month
600
500
400
300
989 overall
234
547
200
169
100 - - --
8 4 0 5 3 19
October November December January February March April May June (as of
6/29)
1200000
1000000
800000
600000
400000
200000
0
October November December January February March
Gallons per Month
1,557,538 Total Gallons Taken
996,259
Visits per Month
April May June (as of 6/24)
6000
8,503 visits overall
soon
4000 .
3000
2000
1000
1 4 0 19 20 is
0 - --
October November December January February March
5,072
April May June (as of
6/24)
Users by Water District
(10/25/14 through 06/24/15)
OSA 31
Martinez
171
EBMUD
261
CCWD
526
Users by Informed By
(10/25/14 through 06/24/15)
Banner at
HHW, 31
Website, 84
Newspaper/
TV/Radio, 35
Word of Mouth
Employee, 39
Other. 42
j
OSA = Out of Serivice Area
Event, 9
Water District, 7
Yard Sign, 26
*Poor job surveying for this initially. We are trying to go back and ask those that were not surveyed as they come in.
CCCSD March 2015 Energy Usage
Treatment Plant Campus
88% of Total $
Operating Cost of CCCSD By Month TP Electricity by Source in kWh
$350,000
5300,000 $288,997 $275,669 $281,142
$258,757
$250,000
$200.000
$150,000
S1W,OW
$50,000
so
Oec 14 115 Feb 15 Mar 15
•POO Natural gas g Natural gas Delivery
■ P00 Landfill gas . Other Energy Charges
■ POD Demand Ch.rge •POO Beserv. &Sn'Chages
TP Electricity by Source in kWh
30 -- _.
25 . 170
zo
4.94 492
3;5S
i 15
10 -
0.23
0 1 ■
2011 2012 2013 2014 2015
Year
•Cogen •Standby Power .PG &E
2.500
2.000
Y5 1,500
A
1,000
SW
D
Dec 14 an 15 Feb -15 Mar 15
• Cogen • Standby Power a PG &E
TP MMBTU of Gas Consumed
600 0
500.0
f400.0 - - -__
F
300.0 —
a
200.0 —.-
23.8
IWO
0.0 .
2011 2012 2013 2014 2015
Year
• Natural Gas • Landfill Gas
TP MMBTU of Gas Consumed
50
45 ... _.. ..._ - -.. ._._ .... ..... ....
40
35
30
i 25
a 20
E is
10
s
0
Dec -13 lam1S F6.15 Mar 15
• Natual Gas • Landfill Gas
TP Energy by Source in kWh
Equivalence
1211
100 1:70. -. 4.94
® 4 4+
80
60 — —
-2 d4 27A1
19.67
.� 2767 0.23
20 --
0
2011 2012 2013 2014 2015
Year
■ Aua Bolters w.8 Steam ■ Cogen Steam
■ Cogen Electrkal g Standby Power ■ PG &E
This month we produced and purchased electricity at an average rate of $0.0619 /kWh Including maintenance
Compared to $0.1045 /kWh From PG &E
CO,,, MT
25000 250W
2D000 20000
We produced steam at an average rate of $0,00873 /Ib steam
ISWO 150W
lOWO 100W
:5,721:
sWO so0o
Cogen has a breakeven cost of $8,68 /MMBTU
D o
Natural gas was purchased at a rate of $55,01 /MMBTU
9)
Monthly Total Energy Cost: $259,000
urge
$234.33 /MG Treated
t"'ty Import
2,010 kWh /MG Treated
.814
2%
Pump Stations
11% of Total $
CSO Facility
1% of Total $
12 0ther PumP
Sin "7'
CSO
Electricity
Stations $1,363
S%
$7.478 i6%
$3.122
66%
Concord
Iad.ntnal 5783
C50 Gas
V
3%
$894
19%
a
Fatn $1,210
4%
CSO
Vehicle
Bay Wh cle
Elechltiry Bay Gas
Lower Onntla
$557 $41
Maltby $1.255
4%
Martinet $2.140 53,08711%
7%
L4% 1%
Operating Cost of CCCSD By Month TP Electricity by Source in kWh
$350,000
5300,000 $288,997 $275,669 $281,142
$258,757
$250,000
$200.000
$150,000
S1W,OW
$50,000
so
Oec 14 115 Feb 15 Mar 15
•POO Natural gas g Natural gas Delivery
■ P00 Landfill gas . Other Energy Charges
■ POD Demand Ch.rge •POO Beserv. &Sn'Chages
TP Electricity by Source in kWh
30 -- _.
25 . 170
zo
4.94 492
3;5S
i 15
10 -
0.23
0 1 ■
2011 2012 2013 2014 2015
Year
•Cogen •Standby Power .PG &E
2.500
2.000
Y5 1,500
A
1,000
SW
D
Dec 14 an 15 Feb -15 Mar 15
• Cogen • Standby Power a PG &E
TP MMBTU of Gas Consumed
600 0
500.0
f400.0 - - -__
F
300.0 —
a
200.0 —.-
23.8
IWO
0.0 .
2011 2012 2013 2014 2015
Year
• Natural Gas • Landfill Gas
TP MMBTU of Gas Consumed
50
45 ... _.. ..._ - -.. ._._ .... ..... ....
40
35
30
i 25
a 20
E is
10
s
0
Dec -13 lam1S F6.15 Mar 15
• Natual Gas • Landfill Gas
TP Energy by Source in kWh
Equivalence
1211
100 1:70. -. 4.94
® 4 4+
80
60 — —
-2 d4 27A1
19.67
.� 2767 0.23
20 --
0
2011 2012 2013 2014 2015
Year
■ Aua Bolters w.8 Steam ■ Cogen Steam
■ Cogen Electrkal g Standby Power ■ PG &E
This month we produced and purchased electricity at an average rate of $0.0619 /kWh Including maintenance
Compared to $0.1045 /kWh From PG &E
CO,,, MT
25000 250W
2D000 20000
We produced steam at an average rate of $0,00873 /Ib steam
ISWO 150W
lOWO 100W
:5,721:
sWO so0o
Cogen has a breakeven cost of $8,68 /MMBTU
D o
Natural gas was purchased at a rate of $55,01 /MMBTU
9)