HomeMy WebLinkAbout05.d.1)a) Engineering & Operations Committee Action Summary 5-12-15central
5*d*1)4)t
Sanitary District
SPECIAL MEETING OF THE
BOARD OF DIRECTORS:
CENTRAL CONTRA COSTA
MICHAEL R.MCGILL
SANITARY DISTRICT
President
ENGINEERING & OPERATIONS
TAD J. PILECx7
President Pro Tent
COMMITTEE
PAUL H. CAUSEY
JAMES A. NEJEDLY
DAVID R. WILLIAMS
ACTION SUMMARY
PHONE: (925) 228 -9500
FAX: (925) 676 -7211
Chair Causey
www.centralsan.org
Member Nejedly
Tuesday, May 12, 2015
3:00 p.m.
2" d Floor Conference Room
5019 Imhoff Place
Martinez, California
PRESENT: Chair Paul Causey, Member Jim Nejedly, General Manager Roger Bailey,
Deputy General Manager Ann Sasaki, Director of Engineering and Technical Services
Jean -Marc Petit, Director of Administration David Heath, Provisional Capital Projects
Division Manager Edgar Lopez, Planning and Development Services Division Manager
Danea Gemmel[ (arrived during Item 5), Plant Maintenance Division Manager Neil
Meyer (left after Item 3), Senior Engineer Dana Lawson (left after Item 7), Senior
Engineer Sasha Mestetsky, Provisional Senior Engineer Clint Shima (left after Item 3),
Associate Engineer Nancy Molina (left during Item 5), Provisional Associate Engineer
Melody LaBella (arrived during Item 5), Accountant Amal Lyon, District Counsel Kent
Alm (left after Item 3), and Senior Administrative Technician Cindy Granzella
Call Meeting to Order
Chair Causey called the meeting to order at 3:02 p.m.
2. Public Comments
None.
3. Review draft Position Paper authorizing the General Manager to execute a
service agreement with Solar Turbines, Inc. in the amount of $1,600,000
Provisional Senior Engineer Clint Shima explained that the District has been in
contract with Solar Turbines, Inc. since 2012. Staff is recommending entering
into a five -year, long -term services contract to maintain the Cogeneration Gas
Engineering & Operations Committee Action Summary
May 12, 2015
Page 2
Turbine System (Cogen System). Plant Maintenance Division Manager Neil
Meyer explained the contract covers normal wear and tear and only a few items
will not be covered. If these additional items are needed, costs will come from
the Operations and Maintenance (O &M) Budget. He suggested that such costs
would be minimized.
Mr. Alm gave a summary of his review of the liability provisions. He expressed
concern that the District may run into insurability issues in the future working with
Solar Turbines, Inc.
Member Nejedly asked if other options are available. Mr. Shima explained that
the District has already upgraded the system, and other companies are not as
familiar with the system as Solar Turbines, Inc. Chair Causey asked if it would
be possible to enter into a short-term contract for the first engine overhaul,
scheduled in November 2015. Mr. Shima explained that the District has currently
been using short-term contracts with Solar Turbines, Inc. Solar Turbines, Inc. is
now looking for a long -term contract and are less inclined to continue with
another short-term contract.
Member Nejedly suggested taking this item to the full Board for discussion.
Chair Causey agreed, and requested a memo listing all options for the Board to
consider.
COMMITTEE ACTION: Requested that information on all options be
presented to the full Board for consideration.
*4. Update and discuss Pleasant Hill — Grayson Creek Trunk Sewer, District Project
8412
Associate Engineer Nancy Molina presented a status report on District Project
(DP) 8412 (attached). Ms. Molina explained that the new estimated total cost of
the project is $10.7 million, with an anticipated bid opening in February 2016 and
project completion in spring 2017.
COMMITTEE ACTION: Received the update.
*5. Review draft Fiscal Year 2015 -16 Capital Improvement Budget (CIB) and 2015
Ten -Year Capital Improvement Plan (CIP) (Distributed under separate cover)
Provisional Capital Projects Division Manager Edgar Lopez reviewed the
PowerPoint distributed just prior to the meeting (attached).
COMMITTEE ACTION: Reviewed and provided input to staff.
Engineering & Operations Committee Action Summary
May 12, 2015
Page 3
6. Standing . Items
tems
*a. Review schedule and discuss upcoming bids and awards and discuss
change orders over $50,000, if needed
Recycled Water Hydrant Project
Lafayette Sewer Renovations, Phase 8
Planning and Development Services Manager Danea Gemmell and
Provisional Associate Engineer Melody LaBella reviewed the presentation
included in the agenda packet, explaining the need for more Recycled
Water Hydrants. Ms. Gemmell also suggested an extension at the
Household Hazardous Waste (HHW) Facility to provide more pressure for
the residential fill station, which could include an addition of a hydrant at
that location and additional service points. Ms. Gemmell distributed a map
of the HHW Facility to show the potential extension and hydrant
(attached). The proposed work would be undertaken by Lyles
Construction as a change order to the Primary Treatment Renovations
Contract and paid for under the Recycled Water Program.
Member Nejedly stated the urgency for hydrants on the adjacent Kiewit
property and would like to include a second residential fill station at that
location. Chair Causey agreed and requested that the change order work
be tracked as a separate project.
b. Receive report regarding any projects approaching a budget overrun within
the 15 percent General Manager authority, if needed — None reported
C. Receive Quarterly Report to compare budgeted versus actual costs
d. Receive presentation on projects whose costs exceed 20 percent of the
number quoted in the Capital Improvement Budget Allocation (CIBA), not
including the 15 percent General Manager contingency
• Martinez Sewer Renovations, Phase 4, District Project 8415
COMMITTEE ACTION: Reviewed standing items and provided input to staff.
Engineering & Operations Committee Action Summary
May 12, 2015
Page 4
7. Review draft Position Paper authorizing the General Manager to execute an
agreement with Woolpert, Inc. with a cost ceiling of $400,000 for implementation
services for the Computerized Maintenance Management System (CMMS)
Replacement, DP 8242
This item was taken out of order, immediately following Item 3.
COMMITTEE ACTION: Reviewed and recommended Board approval.
8. Announcements
a. Future scheduled meetings:
Wednesday, June 10, 2015 at 3:00 p.m.
Wednesday, July 1, 2015 at 3:00 p.m.
Wednesday, August 26, 2015 at 3:00 p.m.
COMMITTEE ACTION: Received the announcements.
9. Suggestions for future agenda items
None.
10. Adjournment — at 4:52 p.m.
* Attachment
Pleasant Hill- Grayson Creek
Trunk Sewer
DP 8412
Status Report
Presented
By
Nancy Molina, PE
Associate Engineer
?;1 Central Contra Costa Sanitary District
Location Map
9.
(VAkv\AOOT)
1
Project Map
a
r
N . �. � l
J W£6TQYER OR
H
7
- .
3
s
-.
., Grxaysom RG �, A g cmawR awk rral sswr
GREGORY'[ry
!a EtlpMp 3C T1W Eswa
y � My! fU%R GRtlI
� Fbw D*tl*Cvm on
Sewershed Map
iLI ;� _ ■
• ¢ 1 I != Pl.wrt w Ganiea
'=Y 1 an Emy x Tom.,. s— r
—. s.— s'
5/12/2015 '.
2
Major Coordination Efforts
• United States Bureau of Reclamation
(USBR) Permit to construct
• City Paving Coordination
• Local Sewer Line Renovations
• Eliminate the sewer along the creek
Sewer Deficiencies
� 4
* -
lop
r
i
d� krESrovti as I y ''—
i � � GREGORYCA'
. SMM GVe160oa
�"�_ 6� /. -_ -_ -. - •r G.V. -Calk T—k S—
■� E..bNM.T- *Swea+
IL
^. �xBMOnm GaewpFro §u<i1
. MalaC .v
-�'—' —� Fkxv grectlan
5/12/2015
3
Design Status
• Design is 80% Complete
• Final Geotechnical Report
• West Yost constructability review
• Construction Methods
• Open Trench
• Pilot Tube Guided Boring and
Microtunneling (Trenchless)
• Manholes
Cost Estimate Update
• Design $1.25M
• DCM Consulting ($134,000)
• West Yost & Associates ($69,000)
• Construction Contract $8.1M
• Contingency $0.35M
• Construction Management/
Inspection/ Permits $1M
TOTAL ESTIMATED PROJECT COST $10.7M
5/12/2015
al
Projected Schedule
• Bid Opening February 2016
• Award Contract March 2016
• Construction April 2016 - Spring 2017
• Two Fiscal Year Project, ending in FY 16 -17
QUESTIONS
5/12/2015
5
f
Item 5
Proposed
2015 -16 Capital Improvement
Budget and Ten -Year CIP
Edgar J. Lopez, PE
Prov. Capital Projects Division Manager
Engineering & Operations Meeting
May 12, 2015
Central Contra Costa Sanitary District
Proposed FY 2015 -16
CIB — New Changes
• Formal Project Prioritization
• Table 1 has been modified (Contingency
added to Estimated Allocations)
• Program financial information has been
consolidated to single spreadsheet.
Table 2 -5
• Major project emphasis FY 2015 -16
• 10 -Year Capital Improvement Plan (CIP D
5.
(hMAIDW)
1
Proposed FY 2015 -16 C113
Prioritization
• Priority by Program
• Point System:
• Critical > 65 Very High 50 — 64
• High 25 — 49 Medium < 25
Primary Treatment Renovation
Project Name
Primary Treatment Renovation
Project No
285
Program
Treatment Plant Program
Estimated
FY 2014-15
Expenditures
Phase
C
Sub-Pr ram
One -Time Renovation
$11,498,454
Primly Rank
Critical
Project Manager
Jason DeGroot
$907,000
Rark:ig Scare
90
De VDNtsion
Engineering/Capitzl Projects
Treatment a, -1
Comad%
the plant
100%
Purpose:
This project will improve the reliability of the Primary
or the Tour primary sedimentation tanks were constructed In the mid -1 yaps and the
tanks were constructed in the mid -1970s as part of the 5A expansion project. Some
iponerds are corroding and nearing the end of their service life.
Table 1 - Last Year
Table 1: Capital Improvement Budget Summary for Fiscal Year 2014 -16
Program
95% of Estimated
Allocatlonfor
Projects in the
CIE
5% Program
Contingencyfor
projects not In
the CIB
Estimated
Allocation this FY
All Projects
Estimated Carry-
over from
Previous FY
Total Proposed
Authorization
Estimated
FY 2014-15
Expenditures
Treatment Plant
$ 4,261,700
$ 224,300
$ 4,486,000
$11,498,454
$15,984,454
$ 9,045,000
Collection System
$17,232,000
$907,000
$18,139,000
$8,191,317
$26,330,317
$12,217,000
General Improvements
$ 3,302,675
$ 173,825
$ 3,476,500
$ 3,328,016
$ 6,804,516
$ 3,265,000
Recycled Water
$ 541,025
$ 28,475
$ 569,500
$ 812,230
$1,381,730
$ 552,000
Total this Fiscal Year
$25,337,400
$1,333,600
$26,671,000
$23,630,017
$60,501,017
$215,078,000
it
Proposed FY 2015 -16 CIB
New - Table 1
Proposed FY 2015 -16 CIB
New Program Tables
TABLE 5: FY 15.16 CIB Bec clad Water Pro ram Bud t/ Pro'eet List
mte: 05M.15 DRAFT
MARY
A
B
C
D
MwFY(FI
Sp
Estimated
Estimated
Frtbtte
—W.
FWF•FY
Carry -Over
Allo cations this
Total Proposed
Estimated FY
Program
from Previous
FY (All Projects
Authorizations
2015 -16
Se '.it
FY
including
Expenditures
Contingency)
f?RJ »l
f ?.S r!.•
Treatment Plant
$ 3,684,000
$ 12,257,000
$ 15,941,000
$ 10,410,000
Collection System
$ 6,063,000
$ 24,350,000
$ 30,413,000
$ 15,950,000
General
$ 1,540,000
$ 3,113,000
$ 4,653,000
$ 3,980,000
Improvements
emnew Fr E. nane..
f[eo mo
faoo
'
Recycled Water
$ 288,000
$ 480,000
$ 768,000
$ 450,000
Total this FY:
$ 11,575,000
$ 40,200,000
$ 51,775,000
$ 30,790,000
Proposed FY 2015 -16 CIB
New Program Tables
TABLE 5: FY 15.16 CIB Bec clad Water Pro ram Bud t/ Pro'eet List
mte: 05M.15 DRAFT
MARY
NeM
NFnOw
M—
Nal[a
AOaFa[e [e eb
MwFY(FI
Sp
fbmenry
fWptt
SYLIfb
Frtbtte
—W.
FWF•FY
F-
15,)Ji
WCS'0:"
T:S; .:;'
.i
S".iOC
Se '.it
". =Fx
f?RJ »l
f ?.S r!.•
S':-
Sf.
S'rcf
Sn nn
f]bbA00
FE•v✓
W
OS.600
emnew Fr E. nane..
f[eo mo
faoo
'
0
f'4T
[o�a.c Fr
*Y�cwrtwnsY•c�
v's's
C
brs
E.�a_�.
0
I
I 1
I 9asee[r'I s�.rmao0l
f+sw.vzl wu.ral >a+tml
nm.®I
>aesml sasoq
LLLterhe
MFY 2M5•te
bled
S
Ors•�.O10
B.EtmlW Ye[be[f[fw FY
]OKfb fW Frwryn
f0 f0
0
000,000
f]bbA00
M,Sr�nCmtlgnryl
W
OS.600
emnew Fr E. nane..
f[eo mo
faoo
[o�a.c Fr
*Y�cwrtwnsY•c�
v's's
brs
E.�a_�.
0
3
Treatment Plant (TP) Program
— One Time Renovation
— Recurring Renovation
— Regulatory Compliance
— Expansion--
- Safety Improvements
— Wastewater Treatment Master Planning
—Applied Research and Pilot Projects
PROPOSED FY 15 -16 TP PROGRAM
CATEGORY
PROJECTS
ESTIMATED
EXPENDITURES
,r
r
$ 1,750,000
R &R
Primary Treatment
Renovation
$ 560,000
Sustainability
t~
$ 1,200,000
Regulatory
Wet and Dry Scrubber
— Expansion--
- Safety Improvements
— Wastewater Treatment Master Planning
—Applied Research and Pilot Projects
PROPOSED FY 15 -16 TP PROGRAM
CATEGORY
PROJECTS
ESTIMATED
EXPENDITURES
Planning
TP Planning and
Comprehensive MP
$ 1,750,000
R &R
Primary Treatment
Renovation
$ 560,000
Sustainability
Pump & Blower Seismic
Upgrade
$ 1,200,000
Regulatory
Wet and Dry Scrubber
$ 500,000
Regulatory
Headwork Screenings
$ 400,000
R &R
Piping Renovation 8
$ 1,500,000
All Other
$ 5,710,000
Estimated Total:
$ 10,410,000
n
Key TP Projects
r®
G� i d''6'.
Comprehensive Master Plan
Collection System Program
- Renovation /Rehabilitation Projects
- Regulatory Compliance
- Expansion
- Pumping Stations
- Collection System Planning
- Master Plan, Infoworks® Hydrodynamic
Modeling
5
PROPOSED FY 15 -16 CS PROGRAM
CATEGORY
PROJECT
ESTIMATED
EXPENDITURES
R &R
Lafayette 10, Martinez 4, M1
$ 10,550,000
CIPP and others
R &R/ Relief
Pleasant Hill - Grayson Creek
$ 3,050,000
Capacity
Trunk
Pumping Stations
Equipment & piping replacement;
$ 400,000
Safety Improvements
Developer services
Cost Neutral
$ 800,000
and CAD's
Planning
Master Plan and CS Modeling
$ 1,150,000
Total
$ 15,950,000
General Improvements (GI)
Program
—Vehicles and Equipment
— Information System
—Asset Management --- -w
• GDI /GIS
• CMMS
f!
— Legal for Capital Projects
—Building and Property Improvements
PROPOSED FY 2015 -16 GI PROGRAM
PROJECT
ESTIMATED
EXPENDITURES
Vehicles and Equipment
$ 500,000
Information Technology
$ 1,300,000
Asset Management Program
$ 600,000
GIS, GDI, CMMS Replacements
$ 780,000
All Other (POD ADA, Safety Items, Server
Room)
$ 800,000
Estimated Total:
$ 3,980,000
Recycle Water Program
—Future Recycle Water Projects
(not included in the EPA Agreement)
—Future Industrial ReW Projects
—Future ReW Development Planning
—Existing ReW Facilities R &R
7
PROPOSED FY 2015 -16 RECYCLED WATER
PROGRAM
PROJECT
ESTIMATED
EXPENDITURES
Recycled Water Planning
$ 100,000
Filter Plant Facilities
$ 200,000
Concord Landscape — Customer Connections
$ 87,000
All Other
$ 63,000
Estimated Total:
$ 450,000
Proposed $413 Million Ten Year CIP
includes
• Treatment Plant ($196 M)
— R &R projects
9? nn
— Regulatory
$
66 M
— Sustainability/ Energy/ Optimization
$
11 M
— Capacity/ Expansion/ Planning
$
26 M
• Collection System ($191 M)
— R &R
$
130 M
— Capacity/ Expansion
$
32 M
— Pumping Stations
$
12 M
— CAD's and Developer Sewers
$
14 M
• General Improvements
& Recycled Water ($25 M)
— IT Development
$
9 M
— Asset Management (CMMS, etc.)
$
4 M
— Recycled Water
$
5 M
E:
R
Pleasant Hill Corridor FY16/17
• In past CIP for 2019.
• Due to City Paving and Federal grants,
Roadway to be paved by City in 2018.
• This is a capacity project and will be
confirmed with the Comprehensive
Wastewater Master Plan.
• Project may be coordinated with Grayson
Creek Trunk.
• Potential Costs — Approx. $2.6 Million
Pleasant Hill Corridor FY16/17
S J
/ rII l
nm
WVSI UVE.1: DR W �,
�-
GRECOR't I = - 0� ,
Q_ Grayson Crew, runk Sewer
\ �� � i ■� Pleasant III Conidor
—ILJ r r. Existing 3SH' Trunk Sewer
1 4 Mapr Croesinge
-: � Flow DirecYOn
E
Questions or Comments?
10
Uptional
Truck Fill
Hydrant