HomeMy WebLinkAbout06.d.1)a) Action Summary for 4-8-15 Engineering & Operations Committee meeting11 Central Contra Costa Sanitary District
REGULAR MEETING OF THE BOARD OF DIRECTORS:
CENTRAL CONTRA COSTA MICHAEL R.MCCILL
SANITARY DISTRICT President
ENGINEERING & OPERATIONS TAD J.P,LECKI
President Pro Tem
COMMITTEE PAUL H. CAUSEY
JAMES A. NEJEDLY
DAVID R. WILLIAMS
ACTION SUMMARY PHONE: (925) 228 -9500
FAX: (925) 676 -7211
Chair Causey www.centralsan.org
Member Nejedly
Wednesday, April 8, 2015
3:00 p.m.
2nd Floor Conference Room
5019 Imhoff Place
Martinez, California
PRESENT: Chair Paul Causey, Member Jim Nejedly, General Manager Roger Bailey,
Deputy General Manager Ann Sasaki, Provisional Capital Projects Division Manager
Edgar Lopez, Director of Engineering and Technical Services Jean -Marc Petit, Planning
and Development Services Division Manager Danea Gemmell (left after item 3), Senior
Engineer Craig Mizutani, Senior Engineer Dana Lawson (left after item 3), Associate
Engineer Mark Wenslawski, Senior Administrative Technician Cindy Granzella
1. Call Meeting to Order
Chair Causey called the meeting to order at 3:00 p.m.
2. Public Comments
None.
3. Receive update on Asset Management program
Senior Engineer Dana Lawson referred to the memo included in the agenda
packet, stating that the memo outlined which elements listed in the full report are
assigned to District Project (DP) 8238, Asset Management Program
Development, and which are assigned to other capital projects, such as the
Comprehensive Wastewater Master Plan.
Engineering & Operations Committee Action Summary
April 8, 2015
Page 2
Ms. Lawson also stated that a request for proposal (RFP) went out for the
Computerized Maintenance Management System (CMMS) Replacement Project
and two responses were received. She is hoping that the selection will be made
by the end of the month.
COMMITTEE ACTION: Received the update.
*4. Review draft position paper to award construction contract to SAK Construction,
LLC, in the amount of $1,996,210 for the M1 Cl PP Rehabilitation Project, District
Project 8424
Provisional Capital Projects Division Manager Edgar Lopez distributed a handout
showing the Fiscal Year (FY) 2014 -15 Capital Improvement Budget (CIB)
Collection System Program Project List and Project Allocations. Mr. Lopez
explained that the table indicates all projects that have been included in the
budget, the top table shows projects already in progress, and the bottom table
shows projects that have not yet started.
COMMITTEE ACTION: Reviewed and recommended Board approval.
5. Review draft position paper to award construction contract to Precision
Engineering, Inc. in the amount of $1,812,211 for the Lafayette Sewer
Renovations, Phase 9, Project, District Project 8421
COMMITTEE ACTION: Reviewed and recommended Board approval.
6. Standing Items
a. Review schedule and discuss upcoming bids and awards and discuss
change orders over $50,000, if needed
• North Main Street Repair, $69,800, under Walnut Creek Sewer
Renovations, Phase 10, Project, District Project 8413
Mr. Lopez explained that the change order was requested by Collection
System Operations because the pipe repair was located in the same
area as DP 8413. The sewer pipe was beneath a light pole, and with
the current project in process, the line was accessible for open -cut
repair.
*b. Receive report regarding any projects approaching a budget overrun
within the 15 percent General Manager authority, if needed
Engineering & Operations Committee Action Summary
April 8, 2015
Page 3
Treatment Plant Equipment Replacement Program, District Project
7265
Senior Engineer Craig Mizutani distributed a handout showing the CIB
Budget amount for equipment replacement. The project is expected to
close at the end of the current fiscal year Chair Causey asked for
clarification on what staff was requesting from the Committee. Mr.
Lopez explained that an additional $144,000 will be needed to
complete the project. He also stated that no projects need to be
deferred in order to request this amount. Chair Causey stated that a
sinking fund would be helpful to cover replacements and repairs within
the General Manager's authority.
c. Receive Change Order Log, Quarterly Reports, and Bid Schedules to
compare budgeted versus actual costs
Mr. Lopez reviewed the Schedule of Upcoming Bids and Awards included
in the agenda packet. In response to a question from Chair Causey, Mr.
Petit said that while it is desirable to have all projects allocated in the CIB
initiated in the same year they are budgeted, staff may need to meet with
the Committee more frequently to put forth recommendations for all
budgeted projects in a timely manner. Chair Causey and Member Nejedly
agreed that additional meetings would be fine if it will allow staff to remain
on schedule with budgeted projects.
COMMITTEE ACTION: Reviewed standing items.
7. Announcements
a. Future scheduled meetings:
Wednesday, May 13, 2015 at 3:00 p.m.
Wednesday, June 10, 2015 at 3:00 p.m.
Wednesday, July 1, 2015 at 3:00 p.m.
b. Mr. Lopez stated that an announcement will be made at the next Board
meeting for the rebid of DP 7311, TP Safety Enhancements, Phase 4
Revised, as well as the Operations & Maintenance Closed Circuit TV
(CCTV) project bid.
C. Mr. Petit stated that a request for a new Vactor Jet - Rodder truck for use in
the Collection System Operations Division would be requested at the next
Engineering & Operations Committee Action Summary
April 8, 2015
Page 4
meeting; the Committee recommended that it be placed on a Board
agenda instead.
d. Chair Causey requested that the May 13 meeting can be moved to
Tuesday, May 12; Member Nejedly concurred.
COMMITTEE ACTION: Received the announcements.
8. Suggestions for future agenda items
Mr. Lopez stated that the Martinez Sewer Renovations, Phase 4 (DP 8415)
and Pleasant Hill- Grayson Creek Trunk Sewer (DP 8412) will need to be
discussed at the next Committee meeting.
9. Adjournment — at 3:48 p.m.
* Attachment
FY 14 -15 CIB Collection System Program/ Project List - Project Allocations 4q
Date: 3 /31/15 6 14
Expenditures
Priority
Allocated
Projects
Ca over
Current
Phase
Project
Estimated
Budget
Prior FY(s)
To date
FY14115
FY15�16
FY16117
Future FY
Remaining
Budget
Page
554•
C
PS Equip Piping Rep ace -rent
5640.000
5568.793
516.681
50
SO SO
554 526
5976
C
Diablo Reno Ph2
$3.563.000
53.373.967
598.414
SO
Sol
SO
590.619
8423
5962
C
Pipe B rsting Blanket
5828 .000
5652.285
521 840
SO
SO
50
5153.875
Laf Reno Ph 10•
5999
C
CIPP Blanket Contract
$472.000
5113.619
510.056
50
$O
SO
5348.325
Martinez Ph 4 Sewer Reno
C 8404
C
Lai Sewer Reno Ph8
52.735.000
S2,426.696
S100786
50
Sol
SO
S207516
WC Sewer Reno Ph 11 •
8405
C
2013 CIPP Project
52.978.000
52.716.030
$258.561
50
50
SO
$3.409
Collection System Planning
8406
C
Pump Station Safety Improvs
5611,000
$166,769
5428.354
50
SO
SO
515.877
550.000
8411
C
N Ortnda Sewer Reno Ph5
53.020.000
5626.590
51,546.247
SO
SO
SO
5847.163
$250.000
8412
PID
PH Grayson Creek•
51.250.000
S579.0741
5295.124
$0
SO
SO
5375.802
5700.000
8413
C
WC Sewer Reno Ph 10
53.884.000
5805.818
S2.690.493
SO
SO
SO
5387,689
550,000
8415
P!D
Martinez Ph 4 Sewer Reno
5823,000
5216.739
5444.058
SO
Sol
SO
5162.203
50
50
8417
C
Survey Monument Install
5150.000
598.259
53.048
SO
50
50
548.693
SO
8418
C
Coll System Modeling
5350.000
$148,398
5134.195
50
50
50
567.407
SO
8419
P
Collection System Planning
5320.000
5100.315
5147.570
SO
SO
SO
572.115
SO
8421
D
Laf Sewer Reno Ph9•
5650,000
S283,0811
5366.761
50
50
SO
5158
50
8422
P
WC Sewer Reno Ph 11
5100,000
588,342
59.553
SO
SO
SO
52.105
Sol
8423
P
N Orinda Sewer Reno Ph6•
$150.000
592.333
510.570
SO
Sol
SO
$47.097
SO
8424
D
M1 Rehab
5250.000
$135.512
5111.482
50
SO
50
53.006
SO
8425
D/C
Cathodic Protecbon Ph 1
5559,000
50
594.375
SO
SO
Sol
5464.625
SO
8426
P
Laf Reno Ph 10•
5205.000
50
562.024
SO
SO
SO
5142.976
SO
8427
P
Arc Flash Study
5100.000
Sol
S54.4161
50
SO
SO
545.584
so
Very H 5991
P
PH Sewer Renovation Ph2
5400,000
5133.017
SO
SO
SO
50
5266.983
SO
Very H 5993
P
Forcemam assessment
5127,000
596,535
SO
SO
SO
SO
530.465
High 8403
P
Buehanan Art Pump St Replc
550.000
S83
SO
SO
50
50
S49,917
High 8414
P
Moraga PS Chopper Pump
5100.000
519.964
50
SO
SO
SO
580.036
High 5962
P
Mahole Remot Monitor
5325.500
5131.963
SO
50
SO
SO
5193.537
High 8410
P
Cathodic Protecbon Repic
5200.000
5104,866
588.514
Sol
SO
SO
56.620
NA 8402
na
CADS
50
50
50
Sol
SO
SO
50
NA 8420
na
Development Sewerage
S1720.000
S1019.9421
5664 9%
Sol
Sol
SO
535 062
Subtotal:
526,560.500
$14,698.9921
S7,658.1181
Sol
SO
Sol
54,203.390
B
Identified TP
Pnonty Protects (Not in
"HTE -)
Current
Phase
Proi-
Estimated
Budget
Prior FY(s)
Estimated
FYid.1;e
FY75.16
TF11 � 17
Future FY
Column!
Page
8424
8421
NA
C
C
C
M1 Rehab
Laf Sewer Reno Ph9•
Urgent Projects
52526.000
52.504,211
$300.000
SO
SO
SO
SO
$500.000
52.026.000
Sol
50
$500.000
52.004.211
SO
SO
5150.000
5150,000
SO
SO
8423
D
N Ortnda Sewer Reno Ph6
5300,000
550,000
5250.000
SO
SO
8426
D
Laf Reno Ph 10•
5200.000
50
5100.000
5100.000
50
50
8415
C
Martinez Ph 4 Sewer Reno
53.100.000
SO
SO
53.100.000
SO
SO
8422
D
WC Sewer Reno Ph 11 •
5300.000
SO
SO
S100.000
5200.000
SO
50
8419
P
Collection System Planning
5150,000
5150.000
SO
SO
SO
8417
C
Survey Monument Install
550.000
Sol
540.000
540.000
SO
50
8418
C
Col System Modeling
$250.000
SO
5100.000
5150.000
Sol
SO
NA 8402
na
CADS
5700.000
SO
SO
$700.0001
SO
Sol
50
5941
D/C
PS Et ap Pipng Replacement
550,000
S50.0001
5250.000
SO
SO
I 8412
C
PH Grayson Creek-
I 50
50
50
$0
$3.500.000
na
C
Pump Stabon Safety Improvs
SO
SO
$250.000
SO
SO
8418
C
Col System Mode"
So
SO
SO
5250.000
SO
SO
8419
P
Collection System MP
50
SO
SO
5500,000
50
SO
8422
D
WC Sewer Reno Ph 11 •
50
SO
50
5250.000
SO
SO
8426
D
Laf Reno Ph 10•
SO
SO
Sol
5400.000
SO
SO
NA
D
WC Sewer Reno Ph 12•
SO
SO
SO
5300.000
SO
$0
NA
P
Lai Sewer Reno Ph 11
50
SO
SO
5150.000
SO
50
NA
C
Urgent Projects
SO
SO
SO
$150,000
SO
50
Very H NA
P
Fairvew Maltby
SO
50
SO
5150.000
SO
SO
NA 8402
na
CADS
50
so
SO
SO
50
NA 8420
na
Development Sewerage
SO
-22
SO
SO
I S7C)0.0001
SO
50
Riverwandl
A. Unallocated Subtotal: $10,430,211
Fined Program cency: $607.000
Allocations: Remaining FY14 Allocations: 510,668.000
Estimated Exoei
S2,440,0001 $14,870,211
S607,0001 51,000,000
FY: I 510.705.1181 515.870.211
2014 -15
Sol SO
FY'4
PROJECT BUDGET OVERRUNS
WITHIN THE 15% GM AUTHORITY
04/8/15 ENGR. AND OPERATIONS COMMITTEE MEETING
TP EQUIPMENT REPLACEMENT PROGRAM, DP 7265:
Capital Improvements Budget (CIB):
FY 14 -15 CIB Budget Amount $ 1,268,100
Total Estimated Project Budget: $ 1,268,100
Current Estimate to complete project:
Current Amount Spent To Date $ 1,238,300
HVAC Design (MCB, Headworks, MCC 42) $ 35,000
HVAC Equipment (Headworks) $ 35,000
Flowserve 3WHP Pumps (Pump, Installation) $ 73,800
Network Switches $ 30,000
New Estimated Project Budget: $ 1,412,100
64.64
ovmovr)
Project was initiated in 2007 and has purchased several items such as primary
sludge pumps, back up UPS systems, spare particulate filters for the standby
engines, strainers for the 3WLP system, DAFT scum arms, replacement VFD's,
and other equipment through the treatment plant.
Estimated project overrun of $144,000 (11.3 %) due to the following:
MCC 42 and MCB HVAC work, these items are in poor condition and are
failing. Replacement is needed prior to the summer.
Complete payment for work on the new 3 -water high pressure pump and
network switches.
Staff has conducted a budget analysis of the FY 2014 -15 Treatment Plant
program and concluded that there are sufficient funds as shown in the following
table:
FY 2014 -15 Allocation Budget
TP Program
Authorized Estimated Allocations for Projects, Includes
Contingency.
$
4,486,000
Supplemental Board Authorizations
$
519,450
Allocations Returned from Closeouts
$
0
Total Board Authorized FY 2014 -15 Allocations
$
5,005,450
FY 2014 -15 Allocations to Date
$
2,160,900
This Allocation for DP 7265 overrun
$
144,000
Remaining Unallocated Budget
$
2,700,550
Project will be closed after this work is completed.