Loading...
HomeMy WebLinkAbout06. M1 CIPP Rehabilitationkoo Martinez Transmission Line Corrosion Study Brown & Caldwell, 2004 • M1 Pipeline evaluated in 2002 • Report included: • Original liner showing signs of failure, blistering of coating • Coating separating from joints in all pipe sections and other areas • I &I identified • Failing PVC liner • Manholes need some repair work Large Diameter Reinforced Concrete Pipe Corrosion Evaluation, DP 4988 CCCSD, 2003 • M1 Pipeline Review • Coating separating from joints in all pipes • Exposed concrete is soft and in need of protection • Recommendation: Temporary protection via crown spraying until pipes can be lined 2010 M1 Televised • Found temporary crown spray gone in several areas. • Original liner continues to peel off and concrete exposed. • Staff initiated rehab project in 2011- 12. 2012 CIPP Sliplining Project DP 8405 • M1 Rehabilitation included in project. • Received one (1) very high bid, and Board rejected bid (-$4.8 million). • Project was redesigned and split into two phases. • The first phase at Shell and Walnut Creek was completed last year. • Second phase is now being advertised.