HomeMy WebLinkAbout08.a.1) Update on water damage to the District’s Information Technology (IT) Data Center.Agenda Item 8.a (1) IT Data Center Water Damage Update March 5, 2015 Presenter David Heath, Director of Administration ..,c = CD Amrow Protecting Public Health and the Environment Timeline • Late Friday evening February 20, water leaked into the data room from the kitchen above damaging a rack of data server, controller and storage devices. • Saturday was a scheduled system outage for disaster recovery testing as new equipment had arrived. • Water damage was discovered late Saturday afternoon while staff was performing the testing. 2/27/2015 2/27/2015 2/27/2015 Floor and wall damage — includes damage from previous overflows. Unable to discern what was latest incident. D 7lei{ t 2/27/2015 5 2/27/2015 Backup /Production Servers Water Damage Plan Nutmix Production "Pool" MTZ -20 Tb CSO — 20Tb �a aw Quantum Tape Drive Backup Device Nimble Backup /Production Server DistGroup ( "N" Drive) -production: - GIS DistAV - Multiple VM Servers HOB3 - Backup: - Exchange(Mail) DistGroup ( "N" Drive) DistAV -Hob3 to Dell MD Unit Production "Pact' "3200" -Tier 1"- Exchange - D1stAV "1200"- Tier 2 — DistGroup ( "N" Drive) HOB3 "1200" -Tier 3 — DistAV Dell Equal Log. dk.. Server Differentials: Damaged Rack - DistAV Equipment - DistGroup ( "N" Drive) Plan "A!'- Bring Dell M D "1200" Hard Drive Un Its on -line to make DistGroup, DistAV, and HOB -3 availab le to end -users - Utilize Dell MD "3200" Hard Drive Unit and move Exchange (Mail) to Nlm ble Backup /Production Server (a more stable environment) • Can't start process to try and bring up the "1200'x' until S:OOPM 2126/15 because it would impact the Exchange (Mail) Server - "1200's may not come back on -line - Fastest process Plan "B "- Utilize Dell Equal Logic Backup Server to restore DistGroup and DistAV Differentials Nutan& Production Pool Plan "C" - Utilize Quantum tape drive backup information to restore DistGroup, DistAV, and HOBS to N imble Backup /Production Server Conclusions • The current data center location has experienced multiple instances of water infiltration overtime. • Engineering has designed an interim plan to shield IT Equipment using metal collectors and gutters. • Moisture sensors are on order to be installed to provide early detection. • Relocating the data center is currently under evaluation by the Engineering Dept.