Loading...
HomeMy WebLinkAbout05.a. (PowerPoint) Solar Power Purchase AgreementsItem No. 5.a Regional Renewable Energy Procurement (R -REP) ECCD February 19, 2015 Board Meeting Public Hearing Presentation Dan Frost, Associate Engineer Public Health and the Environment How do Solar PPAs work? Facility's Power Demand (kWh) 100,,/ Typically Typically Demand <30% >70% Demand Demand PG &E PG &E Solar PPA Off -Peak Peak Power Power Without PPA OR With PPA How do Solar PPAs work? • PPAs allow use of renewable energy w/o upfront investment • Solar company: designs/ constructs /owns /operates /maintains • District: Agrees to buy power at fixed escalation (20 year, 2 %) • Current PG &E rate schedules --> "Solar- friendly" PG &E rate sch. • Sized for Optimal Savings (varies by site - specific factors): Power demands (time of use) Solar production (site constraints, degradation) Financial factors (rate schedules, PPA pricing, escalation) Avoided over - production (PG &E compensation < PPA pricing) ➢ Lower overall power costs with PPA: ( "solar- friendly" PG &E costs + PPA costs) < (PG &E costs) Payback Not Applicable Collection System Operations Building $' -•sue COM- = '_ 20 -Year Levelized Cost of Electricity: Without PPA = S0.199 /kWh With PPA = S0.165 /kWh 2/11/2015 R -REP Timeline (4/21/14) E &O Committee (1A 0/13) CCCSD recommended staff Board Authorized continue to evaluate sites (9/22/14) Staff GM to execute and agreed on triple update to E &O MOU with R -REP bottom line approach Committee Optony, Inc. Completed CCCSD Solar Feasibility Study (12/4/14) Board Meeting vote to table setting of public hearing date R -REP RFQ /RFP led by Alameda County (19 agencies, 180+ sites, >30MW) per CA Govt Code 4217.12 Sun Edison selected for bundle with CCCSD sites R -REP Group PPA negotiations R -REP Timeline (12/18/14 and 01/08/15) Staff Presentation for Board to Consider Setting Public Hearing Date Conduct Public Hearing & Consider Awarding PPAs (2/19/15) 20 -Year PPA Term (approx.) Dec 2014- Mar 2015- , Nov 2014 Feb 2015 July 2015 % / / /!/ :July 2015 -July 2035 (11/24/14) Staff Design and (12/9/14) Staff Construction Update & E &O Presentation & Phases (approx.) Committee E &O Committee recommended recommended setting public setting and holding hearing date public hearing date Energy Cost Savings Some Energy Cost Stability High Visibility to Public Aligns w /Strategic Plan (Goal Four, Strategy 1) Uses "Green" Power (200 tons CO?/year reduction) Grandfathered into NEM Tariffs (NEM 2.0 by July 2017) Reduced Effort w/R -REP Lower Pricing w /Group Bids Minimal Savings Early Termination Fees ($5.82- $6.68/W in 1st year to $1.18- $1.29/W in 20th year) No Grants or Rebates Available Potential Liabilities (e.g. glare) Solar Vendor Owns Tax Incentives Cannot Predict PG &E Rates Site Constraints Unforeseen Costs 2/11/2015 5 2/11/2015