Loading...
HomeMy WebLinkAbout07.a.1) Report on District's energy consumptionCentral Contra Costa Sanitary District January 2, 2015 TO: THE HONORABLE BOARD OF DIRECTORS VIA: ROGER S. BAILEY, GENERAL MANAGER T( FROM: JEAN -MARC PETIT, DIRECTOR OF ENGINEERING he SUBJECT: District Energy Usage New Report At the January 8, 2015 Board Meeting, Provisional Senior Engineer Clint Shima and I will present an example of a monthly Energy Usage Report, which will be the first annual report of its kind. This new report will feature both monthly and historical data on energy usage at the District. The data will be presented using a single page format showing charts and data of energy usage across the District. The attached example was presented at the November 24, 2014 Engineering & Operations Committee meeting and represents energy data for the month of September 2014. An updated report will be presented at the Board meeting. The Committee concurred with staff's recommendation to present the information on a quarterly basis under the General Manager Written Announcements section of the agenda packet, with an annual presentation given to the Board in January. Attached Supportlnc Document. 1. CCCSD September 2014 Energy Usage (as presented to the Engineering & Operations Committee) CCCSD September 2014 Energy Usage Treatment Plant Campus 85% of Total $ HHWCF, $855, 0% cnn and Charge, 3.%,3% Pump Stations ctricity Import, .097'3% 13% of Total $ Operating Cost of CCCSD By Month $450,000 5395.552 $400,000 305,680 $350,000 296,968 $295,929 $300,000 $250,000 $200,000 $150,000 $100,000 $50,000 $o Jun-14 Jul-14 Aug -14 Sep -14 ■ POD Reservation Charges ■ POD Demand Charge E Total Energy Charge POD Landfill gas ■ Natural gas Delivery a POD Natural gas Total Electricity by Source in kWh 30 25 1.23 1.70 20 13.55 7.92 L 3 15 O f 10 5 0 2010 2011 2012 2013 2014 Year Cogen a Standby Power PG &E Monthly Total Energy Cost: $296,0C _' San Ramon, $11,022, 28% 12 Other Pump Stations, $1500, 4% Concord Industrial, $1,136, r 3% Fairview, $1,683, 4% Maltby, $ 5% $316.90 /MG Treated 2330 kWh /MG Treated l Lower Orinda, Martinez, $3,127, $4,064,10% 8% Total Electricity by Source in kWh 2.500 2.000 r Y 1,500 c 0 1,000 L H 500 0 Jun -14 Jul-14 Aug-14 Sep -14 ■ Cogen ■ Standby Power n PG &E Total MMBTU of Gas Consumed 600.0 500.0 400.0 i V 300.0 i O 200.0 193 100.0 0.0 2010 2011 2012 2013 2014 Year ■ Natural Gas w Landfill Gas CSO Facility 2% of Tota I $ IPP-10 CSO 80% Vehicle CSO Gas, Bay $383,6% Electricity, Vehicle el $992,14% Bay Gas, $8,0% Total MMBTU of Gas Consumed so 45 40 35 f 30 9 25 C 20 O 15 10 5 0 Jun -14 Jul-14 Aug 14 Sep 14 ■ landfill Gas ■ Natural Gas Total Energy by Source in kWh Equivalence 120 100 r 80 r 3 60 Y C 27.41 40 27.30 19.67 22.67 25.79 20 D,l 2010 2011 2012 2013 2014 Year • Aux Boilers WHB Steam ■ Cogen Steam • Cogen Electrical ■ Standby Power ■ PG &E This month we produced and purchased electricity at an average rate of $0,0669 /kWh Including maintenance Compared to $0.1513 /kWh From PG &E We produced steam at an average rate of $000876 /lb steam Cogen has a breakeven cost of $13.90 /MMBTU Natural gas was purchased at a rate of $5.09 /MMBTU