HomeMy WebLinkAbout05.d.1)b) Action Summary: 11-24-14 Engineering & Operations Committeecentral
Sanitary District
SPECIAL MEETING OF THE
BOARD OF DIRECTORS:
CENTRAL CONTRA COSTA
DAVID R. WILLIAMS
SANITARY DISTRICT
President
ENGINEERING & OPERATIONS
MICHAEL R.MCGILL
President Prolem
COMMITTEE
PAUL H. CAUSFY
JAMES A. NFJEDLY
TAD J PILECKI
Chair Pilecki
PHONE: (925) 228 -9500
Member Causey
FAX: (925) 676 -7211
www.centralsan.org
Monday, November 24, 2014
12:30 p.m.
2nd Floor Conference Room
5019 Imhoff Place
Martinez, California
PRESENT: Chair Tad Pilecki, Member Paul Causey, Provisional Deputy General
Manager / Director of Engineering Jean -Marc Petit, Director of Administration David
Heath, Provisional Capital Projects Division Manager Edgar Lopez, Accountant Amal
Lyon, Senior Engineer Dana Lawson (left after Item 4.), Associate Engineer Nathan
Hodges (left after Item 6.), Plant Maintenance Division Manager Neil Meyer (left after
Item 5.), Provisional Senior Engineer Clint Shima (left after Item 5.), Associate Engineer
Dan Frost (left after Item 6.), Senior Administrative Technician Christina Gee
1. Call Meeting to Order
Chair Pilecki called the meeting to order at 12:30 p.m.
2. Public Comments
None.
3. Receive update on Asset Management Implementation Planning
Senior Engineer Dana Lawson reported that staff recently held a workshop in-
house to review recommended projects for the Asset Management
Implementation Plan. A draft report, which will be more encompassing and
include a road map, will be ready in one to two weeks, finalized in January and
presented to the Board in time to be rolled into the Capital Improvement Plan
(CIP).
Member Causey requested that staff send the documents to the Committee as far
in advance as possible. He encouraged that staff engage as many people as
Engineering & Operations Committee Action Summary
November 24, 2014
Page 2
possible in the process and commended the level of engagement for the
workshops noted in the Needs Assessment memorandum. He also stated that,
from his perspective, the weighting system may need to be revised for more
accurate prioritization.
Chair Pilecki asked that staff add notes on future reports regarding the status of
the items. He advised that staff keep the process simple and only spend time on
value -added ideas, not to put a significant amount of effort into something that
does not offer a commensurate return. Member Causey said that he agreed, to
an extent, and recommended that staff think what is really needed and, as
examples, set appropriate project levels for business case evaluations or avoid
creating hierarchies that are too high level and neglect important parts, as a
result.
COMMITTEE ACTION: Received update.
4. Review draft Position Paper awarding a technical services agreement with a cost
ceiling not to exceed $593,000 to V &A Consulting Engineers for flow monitoring
under the Collection System Modeling Upgrade Project, District Project 8418
Provisional Deputy General Manager/ Director of Engineering Jean -Marc Petit
stated that staff sent out a Request for Proposal for the flow monitoring and
metering in the collection system. V &A was selected out of three proposals. The
project being presented is for two years of data collection to refine the model,
including time extensions if needed due to weather. Another Position Paper will
come back to the Board for the calibration and implementation of the model.
Chair Pilecki recalled that Environmental Services Division staff had collected
several sets of flow monitoring data in the past and asked whether that data
would be sufficient for current use, given the significant cost of the proposed
contract. He stated that at this time he would not be able to support the
agreement without knowing for sure the old data is unusable.
Mr. Petit stated that time is of the essence, as the agreement ideally would be in
place in time for the winter wet weather, but would request that staff revisit the
used of the previously collected data.
Chair Pilecki also asked staff to look into the amendment to the existing contract
with RMC, considering that the agreement will be raised to $178,000. Board
action is required.
Member Causey requested that the budget number be added to the Position
Paper, so it could be seen how much has been spent and if the project is on
target with respect to the budget.
Engineering & Operations Committee Action Summary
November 24, 2014
Page 3
Member Causey also noted that he would be unable to support the Collection
System Renovation and Rehabilitation (R &R) Program as currently proposed. He
suggested slowing down the R&R Program to allow time for the Master Plan to be
fully formed and integrated with it.
Member Causey also suggested that perhaps the Collection System Operations
(CSO) crews could consider taking measurements of depth while they are in the
field to fill any data gaps for manhole inverts needed in the hydraulic model.
Mr. Petit asked for the Committee's input as to how they would prefer the project
as a whole be presented. Chair Pilecki preferred to split it into two actions:
(1) the parts related to the Collection System Master Plan, and (2) the rest of the
project related to the hydraulic model implementation. Chair Causey stated that
he concurred with staff's original approach, but he requested that staff add a
paragraph to the Position Paper listing the steps ahead and actions needed
toward the Master Plan.
COMMITTEE ACTION: Directed staff to return with a revised Position Paper
and requested additional information.
*5. Receive update on the District's annual energy consumption
Mr. Petit and Provisional Senior Engineer Clint Shima distributed charts of
energy usage across the District (attached), a report which staff recommended
providing on a quarterly basis. The Committee concurred with staff's
recommendation to present the information quarterly and suggested it do so as a
General Manager Written Announcement to the Board.
Member Causey noted that the charts demonstrate the need for an Energy Policy
to drive the District toward self - generation and reducing energy usage as much
as possible.
The Committee requested changes in the titles of the some of the graphics for
clarity, and Chair Pilecki suggested adding a graph depicting the current status of
greenhouse gas emissions used versus the top limits.
COMMITTEE ACTION: Received update, suggested changes to the charts,
and concurred with staff's recommendation to present the report quarterly.
*6. Review draft Position Paper setting public hearing on January 8, 2015 to
consider award of three power purchase agreements (PPAs) to Sun Edison, LLC
for solar photovoltaic panels at the District's Household Hazardous Waste
Facility, Collection System Operations Building, and Vehicle Maintenance Shop
[Last discussed at the September 22, 2014 Committee meeting]
Engineering & Operations Committee Action Summary
November 24, 2014
Page 4
Associate Engineer Dan Frost stated that another draft Position Paper to hold the
public hearing will be brought to the Committee at its December 9, 2014 meeting.
He handed out a Draft R -REP PPA Solar Fact Sheet on each facility (attached)
and noted that the numbers are not yet final. He spoke of the potential cost
savings and social and environmental benefits of the project, and stated that
Meyers Nave staff confirmed that a public hearing should be held in accordance
with California Government Code Section 4217.12 stipulations regarding energy
services contracts.
Chair Pilecki inquired if there would be an option to terminate the contract at no
cost if it is determined the solar panels present a traffic hazard due to potential
glare produced by the solar panels.
Member Causey encouraged that the District use more solar at its other facilities,
such as the Treatment Plant, if it is economically feasible. Mr. Petit noted that the
Sustainable Solutions Turnkey project, whose Feasibility Assessment was
recently approved by the Board, will evaluate solar options for the Treatment
Plant. As for the R -REP Project, the solar facilities listed are sized considering
various site constraints and for optimal financial benefit to both the District and the
solar vendor.
COMMITTEE ACTION: Reviewed and recommended the Board set the
public hearing date to consider entering into power purchase agreements.
7. Receive information requested at the September 22, 2014 Committee meeting
[Continued from October 27, 2014 Committee meeting]:
a. How much of the 5.3% of the total to date change order costs for the
Primary Treatment Plant Renovation, District Project 7285, was added
contract work versus unforeseen conditions
Provisional Capital Projects Division Manager Edgar Lopez stated that
1.8 %, or $190, 000 worth, of change order costs was District requested as
added work for urgent construction repairs at the plant. This Fiscal Year
(FY), staff added an Urgent Repair Project (standby contractor) in the CIB,
for which it will be going out to bid this FY. In Spring 2015, the Board will
be asked to award the contract.
*b. Report on FY 2013 -14 designs and outcomes
Mr. Lopez reported that, of 85 projects in FY 2013 -14, one design project
was postponed and did not come to fruition. The project was revised to
pay consultant contracts on nutrient removal. Therefore, the project was
closed and the original scope will be evaluated and a new project will be
brought back next FY. He also distributed a draft Project Report Card for
Engineering & Operations Committee Action Summary
November 24, 2014
Page 5
the FY 2014 -15 Treatment Plant Program showing the prioritizations of all
projects (attached) and indicated the planned project phase. Staff is
planning to use this report in the future.
C. Follow -up discussion on potential sources and contaminated materials
found during the 2013 Cured -In -Place -Pipe (CIPP) Piping, District Project
8405
Mr. Lopez stated that staff found two batches of hazardous materials
exceeding the limit for soluble lead. The source of that lead is yet to be
determined; however, staff speculated it could have come from a
mechanic shop or radiator repair shop, given the high volume of such
businesses in the area in the past. In the future, staff is exploring several
ideas for handling this situation and are taking necessary actions to
include such provisions in the next CIPP project at the plant.
COMMITTEE ACTION: Received the information.
*8. Receive report on updated Capital Improvement Budget (CIB) formatting
Mr. Petit distributed a draft example of the FY 2014 -15 CIB Treatment Program /
Project List Estimated Expenditures and an example "project handout, "or
information sheet, on the Urgent Repairs project (attached). This new format will
be used for the upcoming FY 2015 -16 CIB.
Chair Pilecki liked the expenditure table and the concept of removing the
allocation /expenditure tables from the project descriptions. However, he
questioned how the allocation portion of the table would be addressed using this
new format. Mr. Petit agreed to discuss the allocation with Engineering staff and
Finance staff and said further information will be provided at the next Committee
meeting on December 9, 2014.
Chair Pilecki was in support of reformatting the project description handouts that
are used in the CIB /CIP annual document. He requested again that staff bring an
update on how allocations would be presented. Member Causey suggested
some additions to the project handout, including a District Project number to the
header and information on the project's relations to other projects.
COMMITTEE ACTION: Provided input to staff.
9. Receive report regarding any projects approaching a budget overrun within the
15 percent General Manager authority, if needed
Mr. Lopez reported that the Dissolved Air Flotation (DAF) Tanks Renovation,
District Project 7309, will run up to 13% over the project budget, however, within
Engineering & Operations Committee Action Summary
November 24, 2014
Page 6
the General Manager's authority. A full report will be presented to the Committee
at its December 9, 2014 meeting.
COMMITTEE ACTION: Received the report.
10. Announcements
a. Future scheduled meetings:
Tuesday, December 9, 2014 at 12:30 p.m. (Special)
COMMITTEE ACTION: Received the announcements.
11. Suggestions for future agenda items
Regarding the December 9, 2014 Special meeting, Member Causey
requested that the CIB be provided to the Committee at least one week in
advance, if possible, to allow sufficient time for the Committee to review
the material. Chair Pilecki requested that the Committee be presented with
the projected expenditures for the next fiscal year, the CIP numbers, and
major projects. He noted that perhaps staff could include a memo
explaining why any numbers have changed, the prioritization sheet, and a
20 -year snapshot. To him, the key objective will be to set numbers and
review major projects.
Member Causey stated that he would likely be recommending a 10 to 15%
cut in the Collection System program until the Master Plan is completed.
Chair Pilecki stated that he did not agree with that, and he believed the
renovation program needs to continue.
12. Adjournment — at 2:43 p.m.
* Attachment
Standing Item
CCCSD September 2014 Energy Usage
Treatment Plant Campus Total Energy Cost: $296,000
85% of Total $
$316.90 /MG Treated
Operating Cost of CCCSD By Month
$450,000 $395,552
$400,000 — _
$305,680
$350,000 --
$300,000 -
295,968 $295,929
$250,000
$200,000
$150,000
5100,000
$50,000
So
J.n-14 1.1-14 A.g-14 Sep -14
■ POD Reservation Charges ■ POD Demand Charge
• Total Energy Charge •POD Landfill gas
■ Natural gas Defiwry ■POD Natural gas
Total Electricity by Source in kWh
—
25
20
3 15
f 10
5
0
HIR
2010 2011 2012 2013 2014
Year
■Cogen ■Standby Power RPG &E
aBe,
% Pump Stations
Import, 13% of Total $
Total Electricity by Source in kWh
2,500
2,000
s 1,500
9
'0 1,000
Soo
0
J. 14 1.414 1u1-14 Sep -:
■ Cogen ■ StandbyP —ar -PG&E
Total MMBTU of Gas Consumed
600.0 —
500.0 — —
400.0
f
v 300.0
w
F 200.0
100.0
o.o
2010 2011 2012 2013 2014
Year
■ Natural Gas • Landfill Gas
Total MMBTU of Gas Consumed
50
45
40
35
f 30
f
v 25
20
15
10
s
0
Jun-14 1.414 Aug -14 Sap 11
• Landfill Gas ■ Naturl Gas
Total Energy by Source in kWh
Equivalence
120
100
80
3 60
40
20
0
2010 2011 2012 2013 2014
Year
• Aux Boilers WHB Steam ■Cogen Steam
■Cogen Efe iwl ■Standby Power ■PG &E
This month we produced and purchased electricity at an average rate of $0,0669 /kWh Including maintenance
Compared to $0,1513 /kWh From PG &E
We produced steam at an average rate of $0.00876 /lb steam
Cogen has a breakeven cost of $13.90 /MMBTU
Natural gas was purchased at a rate of $rja09 /MMBTU
CSO Facility
2% of Total $
San Ramon,
$11,022, 28%
12 Mar Pomp
Stations, $1,500,
4%
Concord
CSO
Industrial, $1,136,
Vehicle CSOGas,
3%
Bay CSO $383,6%
Faim..,,$1,683,
EleRdciry, Vehicle
4% Wtby,$1,962, Lower Odnda,
$992,14% Bay Gas,
S8,0%
5% Martinez, $3,12], $4.064. 10%
8%
Total Electricity by Source in kWh
2,500
2,000
s 1,500
9
'0 1,000
Soo
0
J. 14 1.414 1u1-14 Sep -:
■ Cogen ■ StandbyP —ar -PG&E
Total MMBTU of Gas Consumed
600.0 —
500.0 — —
400.0
f
v 300.0
w
F 200.0
100.0
o.o
2010 2011 2012 2013 2014
Year
■ Natural Gas • Landfill Gas
Total MMBTU of Gas Consumed
50
45
40
35
f 30
f
v 25
20
15
10
s
0
Jun-14 1.414 Aug -14 Sap 11
• Landfill Gas ■ Naturl Gas
Total Energy by Source in kWh
Equivalence
120
100
80
3 60
40
20
0
2010 2011 2012 2013 2014
Year
• Aux Boilers WHB Steam ■Cogen Steam
■Cogen Efe iwl ■Standby Power ■PG &E
This month we produced and purchased electricity at an average rate of $0,0669 /kWh Including maintenance
Compared to $0,1513 /kWh From PG &E
We produced steam at an average rate of $0.00876 /lb steam
Cogen has a breakeven cost of $13.90 /MMBTU
Natural gas was purchased at a rate of $rja09 /MMBTU
Central Contra Costa Sanitary District
Draft R -REP PPA Solar Factsheet
Location:
Size of System:
Annual Electrical Demand:
Annual Solar Production:
Annual Electricity Offset with Solar:
PPA Term:
Year 1 PPA Price:
Year 20 PPA Price:
Current PG &E Annual Costs (Approx)
Year 1 PPA Annual Costs
Year 1 PG &E Annual Costs (with PPA)
Year 1 0 &M Savings:
Year 20 O &M Savings:
20 Year Savings - Net Present Value:
Year 1 Early Termination Fee:
Year 20 Early Termination Fee:
Collection System Operations Building
144.5 KW
285,381 KWh
215,076 KWh
75%
20 years
$0.205 /KWh
$0.300 /KWh
$48,916
$44,111
$3,191
$1,614
$26,576
$167,471
$960,925
$221,085
l�.
*Values in table above are based on a draft financial analysis. A final analysis based on the final
power purchase agreement terms will be completed. Values based on 4% /year utility escalation
rate, 2% /year PPA escalation rate, 3% NPV discount rate, and 0.50% /year panel degradation rate.
le
Central Contra Costa Sanitary District
Draft R -REP PPA Solar Factsheet
Location:
Vehicle Maintenance Shop
Size of System:
25 KW
Annual Electrical Demand:
41,855 KWh
Annual Solar Production:
37,545 KWh
Annual Electricity Offset with Solar:
90%
PPA Term:
20 years
Year 1 PPA Price:
$0.218 /KWh
Year 20 PPA Price:
$0.317 /KWh
Current PG &E Annual Costs:
$8,691
Year 1 PPA Annual Costs
$6,840
Year 1 PG &E Annual Costs (with PPA):
$794
Year 1 O &M Savings:
$1,057
Year 20 O &M Savings:
$4,438
20 Year Savings - Net Present Value:
$24,642
Year 1 Early Termination Fee:
$214,750
Year 20 Early Termination Fes:
$46,250
*Values in table above are based on a draft financial analysis. A final analysis based on the final
power purchase agreement terms will be completed. Values based on 4% /year utility escalation
rate, 2 %lyear PPA escalation rate, 3% NPV discount rate, and 0.50 % /year panel degradation rate.
V
Central Contra Costa Sanitary District
Draft R -REP PPA Solar Factsheet
Location:
Size of System:
Annual Electrical Demand:
Annual Solar Production:
Annual Electricity Offset with Solar:
PPA Term:
Year 1 PPA Price:
Year 20 PPA Price:
Current PG &E Annual Costs:
Year 1 PPA Annual Costs
Year 1 PG &E Annual Costs (with PPA)
Year 1 O &M Savings:
Year 20 O &M Savings:
20 Year Savings - Net Present Value:
Year 1 Early Termination Fee:
Year 20 Early Termination Fee:
Household Hazardous Waste Facili
25 KW
50,205 KWh
35,187 KWh
70%
20 years
$0.213 /KWh
$0.310 /KWh
$9,371
$7,627
$327
$1,417
$7,038
$53,452
$198,634 �`
u. 1 y?
$43,639
"Values in table above are based on a draft financial analysis. A final analysis based on the final
power purchase agreement terms will be completed. Values based on 4% /year utility escalation
rate, 2% /year PPA escalation rate, 3% NPV discount rate, and 0.50 % /year panel degradation rate.
M 4/15 Treatment Plant Program - Project Report Card
Color Code for CIB Pro ram Cate ories:
Reg. Compliance /Planning/Safety
One -Time Renovation
Recurring Renovation
4NO.
Priority Ranking
Category
Project
Number
Project
FY14/15
FY15/16
FY16/17
T
2
7285
Primary Treatment Renovation
C
C
-
7301
Treatment Plant Planning
P
P
P
3
7314
Urgent Repairs Blanket Contract
C
C
C
3
7265
TP Equipment Re lacement
D/C
D/C
D/C
5
7308
Co -Gen Controls Upgrade
C
-
-
6
7292
Switch ear Refurbishment - ph 2
D/C
C
C
6
7310
Piping Renovations - phase 8
D
C
-
6
7309
DAF Tank Renovation
C
-
-
VERY NIGH 9
7297
Wet and D Scrubber Replacement
P
D
C
VERY NIG 10
H
7312
Ash Facility Improvements
P
D, C
D, C
- VERY HIGH 10
TP08
TP Safe Im rov 2011 -12 thru 2019 -20
C
C
C
VERY HIGH
10
7291
Pump & Blower Bldg Seismic Upgrade
D
D/C
C
VERY HIGH
10
7311
TP Safety Enhancements Phase 4
D/C
-
-
VERY HIGH
14
pTP42
Plant Control System 1/0 Replacement
P
D
D/C
VERY HIGH
14
7304
PLC Sys Upgr - 12 -13 thru 21 -22
C
C
C
VERY H031H
14
7286
Centrifuge & Cake Pump Upgrades
P, D
D/C
C
VERY HIGH
14
pTP32
Plant Energy Optimization
P
P
P
HIGH
18
7315
Plant of the Future Roadmap
P
P
-
HIGH
18
7284
TP Hazard Identification & Remediation
P
D
C
HIGH
18
pTP24
Laboratory Upgrades & Repair
D/C
D/C
-
HIGH
21
pTP47
WC / Grayson Creek Levee Rehab
P
P, D
C
HIGH
21
pTP31
Permitting Study for New Furnace
P
P
-
HIGH
23
pTP33
Treatment Plant Soil Remediation
P
P
P
HIGH
23
pTP41
Plant Control System Network Upgrades
C
C
C
HIGH
23
pTP03
Plant C ber Security
P
P
HIGH
26
7254
TP Cathodic Prot Sys Re I
C
C
C
HIGH
26
pTP06
Plant Electrical and Instr Re l
P
C
C
HIGH
28
pTP45
TP Electrical Cable Re pi - LT
P
D
C
MEDIUM
20
xxxx
TP Facilities Renov P m - LT
P
D/C
D/C
MEDIUM
30
pTP29
Pavement Renovation
P
P
P
MEDIUM
30
pTP16
Coating Renovation
P
D
C
MEDIUM
30
pTP30 lConcrete
Renovation
P
D
C
MEDIUM
TP23
TP Securi U r - 2012 -13 thru 2021 -22
P
P
P
r = rianning, u = Design, t; = t;onstruction
M DRAFT g
FY14/15 CIB Treatment Plant Program/ Project List - Estimated Expenditures
Program Manager: Craig Mizutani
Priority
Category
Score
Project
Number
Current
Phase
Project
Estimated
Expenditures to
6/30/14
FYI 4/15
FY15 /16
FYI 6/17
Future FY
Completion
Date
Total Est. Costs
90
7285
C
Primary Treatment Renovation
$6,923,700
$6,000,000
$1,460,000
$0
$0
Jun -15
$14,383,700
85
7301
P
Treatment Plant Planning
$1,913,500
$371,000
$300,000
$300,000
$1,200,000
$4,084,500
80
7314
C
Urgent Repairs Blanket Contract
$10,000
$10,000
$10,000
$10,000
$10,000
Jun -24
$50,000
80
7265
D/C
TP Equipment Replacement
$1,068,100
$50,000
$50,000
$50,000
$50,000
$1,268,100
75
7308
C
Co -Gen Controls Upgrade
$1,240,000
$60,000
$0
$0
$0
$1,300,000
70
7292
D/C
Switchgear Refurbishment - ph 2
$306,800
$100,000
$240,000
$450,000
$240,000
$1,336,800
70
7310
D
Piping Renovations - phase 8
$100,000
$150,000
$1,500,000
$0
$0
$1,750,000
70
7309
C
DAF Tank Renovation
$90,000
$600,000
$0
$0
$0
$690,000
VERY'HIGH 60
7297
D
Wet and Dry Scrubber Replacement
$51,100
$100,000
$500,000
$3,400,000
$3,820,000
$7,871,100
VERY HIGH 55
7312
P
Ash Facility Improvements
$10,000
$1,000
$10,000
$10,000
$10,000
$41,000'
VERY HIGH 55
7291
D
Pump & Blower Bldg Seismic Upgrade
$414,300
$122,000
$2,550,000
$750,000
$0
$3,836,300
VERY HIGH 55
7311
C
TP Safety Enhancements Phase 4
$100,000
$240,000
$0
$0
$0
$340,000
VERY HIGH
55
pTP08
P
TP Safety Improv 2011 -12 thru 2019 -20
$15,000
$1,000
$5,000
$5,000
$15,000
$41,000
VERY HIGH
50
7286
D
Centrifuge & Cake Pump Upgrades
$0
$800,000
$2,200,000
$1,800,000
$0
$4,800,000
VERY HIGH
50
7304
P
PLC Sys Upgr - 12 -13 thru 21 -22
$118,700
$80,000
$80,000
$80,000
$400,000
$758,700
VERY HIGH
50
pTP42
P
Plant Control System 1/0 Replacement
$0
$10,000
$10,000
$20,000
$3,960,000
$4,000,000
VERY HIGH
50
pTP32
P
Plant Energy Optimization
$75,000
$15,000
$0
$0
$0
$90,000
HIGH
45
7315
P
Plant of the Future Roadmap
$0
$100,000
$250,000
$100,000
$450,000
HIGH
45
7284
D
TP Hazard Identification & Remediation
$197,600
$6,000
$100,000
$100,000
$350,000
$753,600
HIGH
45
pTP24
D/C
Laboratory Upgrades & Repair
$0
$48,000
$50,000
$50,000
$290,000
$438,000
HIGH
40
pTP47
P
WC / Grayson Creek Levee Rehab
$0
$10,000
$10,000
$300,000
$300,000
$620,000
HIGH
40
pTP31
P
Permitting Study for New Furnace
$0
$1,000
$25,000
$0
$0
$26,000
HIGH
35
pTP33
P
Treatment Plant Soil Remediation
$50,000
$1,000
$1,000
$50,000
$50,000
$152,000
HIGH
35
pTP41
D/C
Plant Control System Network Upgrades
$0
$80,000
$80,000
$80,000
$80,000
$320,000
HIGH
35
pTP03
P
Plant Cyber Security
$60,000
$5,000
$5,000
$0
$0
$70,000
HIGH
30
7254
D/C
TP Cathodic Prot Sys Repl
$551,300
$10,000
$10,000
$0
$0
$571,300
HIGH
30
pTP06
P
Electrical and Instr Repl
$10,000
$10,000
$10,000
$10,000
$60,000
$100,000
HIGH
25
pTP45
P
TP Electrical Cable Repl - LT
$0
$10,000
$240,000
$240,000
$1,880,000
$2,370,000
MEDIUM
20
xxxx
P
TP Facilities Renov Pgm - LT
$50,000
$50,000
$100,000
$100,000
$2,590,000
$2,890,000
MEDIUM
15
pTP29
P
Pavement Renovation
$5,000
$1,000
$50,000
$50,000
$150,000
$256,000
MEDIUM
15
pTP16
P
Coating Renovation
$1,000
$1,000
$600,000
$400,000
$4,400,000
$5,402,000
MEDIUM
15
pTP30
I P
JConcr ete Renovation
$5,000
$1,000
$50,000
$50,000
$550,000
$656,000
MEDIUM
5
pTP23
P
ITP Security Upgr -.2012-13 thru 2021 -22
$11,000
$1,000
$10,000
$10,000
$50,000
$82,000
Totals:
TP Program Contingency Reserve - ?%
$13,377,100
$9,045,000
$10,506,000
$8,415,000
$20,455,000
$61,798,100
E WMFT 19 dt
URGENT REPAIRS
Subprogram: Reoccurring Renovation
Priority Category: Critical Level
Project Manager, Department/Division:
Edgar Lopez, Engineering /Capital Projects
Project Purpose:
Provide staff the capability to perform immediate electrical, mechanical, and other
miscellaneous repairs within the treatment plant.
Project Description:
Urgent treatment plant projects which require immediate repairs or replacement may
arise anytime during the current fiscal year. These projects may be triggered by one of
the following situations:
• Equipment or process piping failure
• Comply with regulatory or code issues
• Impacts operational procedures or process
• Safety hazards
Projects included in this category are those that cannot be completed by the District's
Plant Maintenance Department, and cannot afford the longer timeline to be incorporated
in the year and a half long budget process. This project will include bidding and
executing a blanket contract that will allow the District to use a contractor for urgent
construction work.
Project Location: Entire Treatment Plant
Project Schedule and Costs:
Total costs for this project is $41,000. This is the first year of this project with a potential
start date of April 2015 and continues until FY 2024 -25.