Loading...
HomeMy WebLinkAbout06.a. (Handout) Power purchase agreements with Sun EdisonRegional Renewable Energy Procurement (R -REP) Update December 18, 2014 Board Meeting Dan Frost, Associate Engineer _.A@CNCSDJ� Public Health and the Environment How do Solar PPAs work? Facility's Power Demand (kWh) 100% Typically Typically Demand <30 °0 >70% Demand Demand PG &E PG &E Solar PPA Off -Peak Peak Power Power Without PPA OR With PPA How do Solar PPAs work? • PPAs allow use of renewable energy w/o upfront investment • Solar company: designs/ constructs /owns /operates /maintains • District: Agrees to buy power at fixed escalation (20 year, 2 %) • Current PG &E rate schedules 4 "Solar- friendly" PG &E rate sch. • Sized for Optimal Savings (varies by site - specific factors): Power demands (time of use) Solar production (site constraints, degradation) . Financial factors (rate schedules, PPA pricing, escalation) Avoided over - production (PG &E compensation < PPA pricing) Lower overall power costs with PPA: ( "solar- friendly" PG &E costs + PPA costs) < (PG &E costs) Payback Not Applicable R -REP Timeline (4/21/14) E &O Committee (1/10/13) CCCSD recommended staff Board Authorized continue to evaluate sites (9/22/14) Staff GM to execute and agreed on triple update to E &O MOU with R -REP bottom line approach Committee Optony, Inc. R -REP RFQ /RFP led by Completed Alameda County (19 CCCSD Solar agencies, 180+ sites, Feasibility Study >30MW) per CA Govt Code 4217.12 • Sun Edison selected for bundle with CCCSD sites R -REP Group PPA negotiations R -REP Timeline (12/18/14) Staff Presentation for Board to 20 -Year PPA Term (approx.) Nov 2014> 201c / Jan 2015 - July 2015 July 2015 - July 2035 (11/24/14) Staff Consider Setting Public Hearing Date (12/4/14) Board Presentation & Phases (approx.) Committee Meeting vote to recommended Conduct Public table setting of setting and holding Hearing & Consider public hearing Awarding PPAs date * (Prior to Feb 291h) 20 -Year PPA Term (approx.) Nov 2014> 201c / Jan 2015 - July 2015 July 2015 - July 2035 (11/24/14) Staff + Design and (12/9/14) Staff Construction Update & E &O Presentation & Phases (approx.) Committee E &O Committee recommended recommended setting public setting and holding hearing date public hearing date y` Annual Energy Use, kWh 2�' 2 Proposed Solar _ -�� System Size, kW Year 1 Solar 2 .f Output, kWh Year 1 Energy Offset w /Solar Year 1 Electricity Costs = i.V1 20 -Year 20 -Year Levelized Cost of Electricity: Without PPA = 50.199 /kWh With PPA = 50.165 /kWh Energy Cost Savings Some Energy Cost Stability High Visibility to Public Aligns w /Strategic Plan (Goal Four, Strategy 1) Uses "Green" Power (200 tons CO2/year reduction) Grandfathered into NEM Tariffs (NEM 2.0 by July 2017) Reduced Effort w/R -REP Lower Pricingw /Group Bids Minimal Savings Early Termination Fees ($6.63- $8.59/W in 1st year to $1.53 41.85/W in 20th year) No Grants or Rebates Available Potential Liabilities (e.g. glare) Solar Vendor Owns Environmental Credits Cannot Predict PG &E Rates Site Constraints Unforeseen Costs 5