Item No. 7.a.1)
Report Summarizing District's
Collection System Project
Costs as Compared to
Industry Standards
2003 to Present (July 2014)
Jean -Marc Petit
Director of Engineering
October 2, 2014
Central Contra Costa Sanitary District
Question from E &O Committee
• E &O Committee Requested Review of
Collection System Project Cost
• Trend showed increasing cost over past
several years
— Staff prepared a summary of CS cost over
past ten years
— Reviewed Trends
1
Reviewed Past Ten Years of
Collection System Projects
• 33 CS projects
• Over $ 75 million of project costs
• 273,300 LF or about 52 miles of pipe
Reviewed Design Cost for CS
Projects
I
10/2/2014
4
Reviewed ROW Cost for
Projects
M5 T. ® �I
v visi
Rcr�r.��:�� me
7�r�-JOUrrs�
Reviewed Project Engineering
Delivery Cost for CS Projects
10/2/2014
10/2/2014
Q
_
0'�
; ir.-•i �3 %lifT]i�/S_T�1`�Sl'ii.T��i�'T��
...�
_
..
ii/!.-
:= lt•�[
=- rte( ^[:'.t�.�[�
-+.
i�i�J
spa -t-+
A
V
MHz=
fl
W,
Reviewed Past Performance
Parameters
-77
0&-.-
10/2/2014
Lessons Learned
• Staff will start:
— Tracking costs associated with the "public relations"
aspect of capital projects (the costs of contacting
customers before, during and after construction).
— Tracking survey costs (currently a part of design
costs).
• Staff is assessing its approach to property
acquisitions and right -of -way procedures.
• Finally, staff is looking at ways to refine the
scope of various renovation projects.