HomeMy WebLinkAbout07.a.1) (Handout) Revised Presentation re Comparison of Collection System project costs since 2003 to industry standards10/2/2014 Item No. 7.a.1) Report Summarizing District's Collection System Project Costs as Compared to Industry Standards 2003 to Present (July 2014) Jean -Marc Petit Director of Engineering October 2, 2014 Central Contra Costa Sanitary District Question from E &O Committee • E &O Committee Requested Review of Collection System Project Cost • Trend showed increasing cost over past several years — Staff prepared a summary of CS cost over past ten years — Reviewed Trends 1 Reviewed Past Ten Years of Collection System Projects • 33 CS projects • Over $ 75 million of project costs • 273,300 LF or about 52 miles of pipe Reviewed Design Cost for CS Projects I 10/2/2014 4 Reviewed ROW Cost for Projects M5 T. ® �I v visi Rcr�r.��:�� me 7�r�-JOUrrs� Reviewed Project Engineering Delivery Cost for CS Projects 10/2/2014 10/2/2014 Q _ 0'� ; ir.-•i �3 %lifT]i�/S_T�1`�Sl'ii.T��i�'T�� ...� _ .. ii/!.- := lt•�[ =- rte( ^[:'.t�.�[� -+. i�i�J spa -t-+ A V MHz= fl W, Reviewed Past Performance Parameters -77 0&-.- 10/2/2014 Lessons Learned • Staff will start: — Tracking costs associated with the "public relations" aspect of capital projects (the costs of contacting customers before, during and after construction). — Tracking survey costs (currently a part of design costs). • Staff is assessing its approach to property acquisitions and right -of -way procedures. • Finally, staff is looking at ways to refine the scope of various renovation projects. r 10/2/2014 1.1