Loading...
HomeMy WebLinkAboutAGENDA BACKUP 11-15-1979(CC8D 0 Central of Contra Costa Sanitary District BOARD OF DIRECTORS POSITION PAPER ROGER J. �of.o,M SUBJECT Generaf Manager—Chief Enaineer QUITCLAIM EASEMENT - CONCORD AREA JOB 1265, PARCEL NO. I NO. VII. NB - 2 11/1 DATE November 13. 1979 TYPE OF ACTION RIGHT OF WAY SUBMITTED BY Jay S. McCoy - ENGINEERING/COLLECTION SYSTEM ISS: The owners of Sun Valley Shopping Center (Wells Fargo Bank a Belloc, as co -trustees of the Nope B. Belloc 'fA" and "B" the above referenced and Martin quitclaim. Trusts) have requested BACKGROUND: The construction of two new parking Center will encroach upon the above- referencedeasementures at Sun Valley Shopping A replacement easement has been granted to this District (New Busin RECOMMENDATION: A ess, Item le} Approval, execute Quitclaim Deed and authorize its recording. INITJ/ITING C,1Ep NEVrEW160 AND RECOMMENDED FPR 80ARD ACTION / IV. r CLW GEN GR./CHIEF ENG. WCD SHEET OF Central Con0 0 tra Cos h ar4tary Distract C BOARD OF DIRECTORS POSITION P��7�� vIA: ROGER J. o0lAN suslECT General Managsr_Chiet Engineer WITHHOLDING OF OCTOBER AND NOVEMBER 1979 DEFERRED COMPENSATION PAYMENTS T SUBM1 D 8 �•ELlpYyd Smith, Deferred Comp Committee NO. VII. NB - 14a 11/1 DATE November 14, 1979 TYPE OF ACTION DEFERRED COMPEN- SATION PLAN ISSISSUE' The District's Deferred Compensation Advisor the Payment of the October and November 19 y Committee has recommended be withheld, and to transmit these contributions with the conte mended This action is recommended to realize the More 79 deferred compensation contributions the recently authorized re favorable fee ischedulesr ndc� ebds 1979. under modification to the basic deferred compensation plan which will be effective in December modification 979. BACKGROUND: The District Board of Directors authorized acCeAtance of the modification to the deferred compensation plan at its meeting on October change is to reduce the plan administrators sales charge an interest rates for the fixed interest accounts 18, reale An underlying and bond accounts havingbalances u to 'and to reduce the salesschargethe gforas guaranteed P $2,SQQ. The plan administrator, the Hartford Variable Annuity suggested withholding the October and are effected in December to obtain the benefits of the er �evis1edtinsLntil ife Insurance nCe Company The District intends to place the October and November terms. modifications Pool account through the Contra Costa County Treasurer's O interval. er contributions in an investment The interest earned will be allocated to employees' accounts contribution balances before submission to the plan administrator. Office for the two-month and added to the RECO tor. compensacontributions, and parove ying the October and No vember 1979.p ying these contributions with the contribution fo7rDecember December I¢tjT TING DEPPT./DIV. D. Ll d Smith e ere mproomm REVIEWED AND 1WNF FOR BOARD ACTION WCD GEN. MGR. CHIEF ENG. SHEET OF Central l Contra Costa Sanitary District BOARD OF DIRECTORS POSITIOIN PAPER vlq: ROGER J. _! LAN SUBJECT AUTHORIZATION FOR p��y. General Manager—chief Engineer TO BE INCLUDED IN FORTHCOMING DIS TRICTNANNEXATION CPROCEEDINGA� S SUBMITTED BY Jay S. McCoy - ENGINEERING/COLLECTION SYSTEM Pa rce 1 79-30 Owner JAddress Area Parcel Nn Con Rerraa rkc N U. --------- VII. N8 -14b. 11/15/ U~IENovember 14 1979 TYPE OF AC -T on ANNEXATION Lead cord .Joaquin Perez A enc 1450 Franklin Canyon Rd. Owner plans to connect a new Martinez, CA 94553 warehouse office t City 110-120-41 1n9 to our existing sewermain of Con - which was installed within Con- .98 Acres Arnold Industrial Place to cord serve this E other properties south of Highway 4 as part of the freeway widening project. Negative Declaration by the RECOMMENDATION: Authori2e p A City of Concord on 4-18-79 to the District. 79'30 to be included in the next formal annexation INI gTIN REVJEN+ED AND RECOMMENDED FOR BOARD ACTION CLW WCD CHOF ENG. SHEET I OF I ((CSD Central Contra Costa Sanifir y District _ BOARD OF DIRECTORS POSITION PAPER VIA' ROGER J. bOu►ru Genera! Manager—Chief Engineer suB�ECT AUTHORIZATION 1170 R D, G. ATTEND A ONE-WEEK SEMINAR IN SAN MARCOS, CALIFORNIA ENTITLED T "THE DESIGN, OPERATIONAL CONTROL, AND TROUBLESHOOTING OF ACTI- VATED SLUDGE SYSTEMS," SuBMITTED BY PLANT OPERATIONS DEPARTMENT VII. NB -11 IIpbr/ DATE November 13, 1979 TYPE OF ACTIpN Employee Education Issue: The California State Water Resources Control Board is sponsoring seminar entitled, "The Design, Operational Control, and Troubleshooting of Activated Sludge Systems," a one-week to be given at the Water ted California. Quality Control Institute in San Marcos, Background: The Water Quality Control Institute has assembled a blue ribbonro Of outstanding environmental engineering consultants, educators, and researchers for o the continuing education of wastewater treatment managers. The g up all highly applicable to the operation of the Central Contra Costa SanitaroplDistre Water Pollution Control/Reclamation Plant. the applicability of the course material, theo Se attached y rict's program.) In addition to pportunity for District managers to discuss mutual plant operational problems with experts in from other municipalities will be of value. the field and Professionals The registration cost for the seminar is $200 per person. Travel and expenses fo two is estimated to be $770, r Recommendation: Authorization of registration, travel and expenses of$11 0 for D Niles, Manager, Plant Operations and R. A. Baker, Plant Operations Division Manager,G to attend the seminar entitled, "The Design, Operational Control, and Troubleshooting of Activated Sludge Systems," in San Marcos, California during the week of December - 15, 1979. g 10 INITIATING DEPT.Jp_ REVIEWED AND RECOMMENDED FOR BOARD ACTION T----F---T- G,V. MGFWCHIEF ENG. SHEET of • ((CSD Central Contra Costa Sanitary District SOAR® OF DIRECTORS POSITION PAPER I IA: ROGER J. DOLAN General Manager—Chief Engineer suTJECT AUTHORIZATION TO EXECUTE CONTRACT DOCUMENTS WITH BROWN AND CALDWELL FOR COMPLETION OF THE STAGE 5B PHASE PROJECT DESIGN sYOEIKITE rson ENGINEERING/SPECIAL PROJECTS DATE Nov. 13, 1979 Trlk OF ACTION AUTHORIZE EXECUTION OF CONTRACT BACKGROUND: Completion of the Stage 56 Phase I hydraulic capacity at the water reclamation lana.Tproject u required it provide adequate 35 MGD and the current average dry weather flow is approximately current permitted capacity is With the completion of the design will result in campletionaoflincreased hydraulic Y 32.5 MGD. Proceeding capacity by summer of 1981. Any delay in design or construction could result in CCCSD exceeding its permitted capacity. Design of the Stage 5B Phase I project as described in the facilities Planningd menn has never been completed. The design effort b 1977 after the plans and specifications had been Bsubmitted rown and Ctodthe lState Water R sources Control Board (SWRCB) for review. In the interim since September 1 peed In September been reviewed b esn has y both the SWRCB and CCCSD staff. Several items containe77, dhindthegdesign have been modified or deleted and several other items have been added as a result operating experience. of Subsequent to approval of the current scope of work for design by the SWRCB appropriate contract documents have been negotiated with Brown and Caldwell for completion of the design work and � Pp opriate provision of office engineering services during construction. The contract documents are: Amendment No. 7 to the January 3 1974 Areement This document would increase the cost ceiling under the existing agreement for the completion of all design items not modified by the new contract. This work is estimated to be 80-85% complete at this time. The amendment does not provide for any increase in the fixed professional fee: The Increased cost ceilingwill provide for the escalation of labor and overhead that has occurred since Se 1977. The amount of the increase is 11 555,+1 51.9b. ptember New A reement for Enqineerinq Services This document covers the changes to the Stage 5B Phase I Project that are outsl de the original scope of Work. The detailed design tasks are listed on Exhibit 1. This document also covers office engineering services during the construction phase. The cost ceiling under the new agreement is: Design $161, Office Engineering 573 75 124 582.x2 286,1; •57 REVIEWED AND RECOMMENDED FOR BOARD ACTION INITIATING DEPT./DIV. C ' W. C. �D,M J. Larson C.L.W. A �j' Jy }qE W.C.D. 1� /l SHEET I OF 2 POSITION PAPER Nov. 13, 1979 Page Two Both contract documents have been reviewed by District Counsel and the SWRCB. The District Counsel's recommendation is shown on Exhibit 2. RECOMMENDATION: Authorize the execution of Amendment No. 7 to the January 3, 197 agreement for Engineering Services with Brown and Caldwell with a cost ceiling of $55,451.98, and authorize execution of the new agreement for Engineering Services with Brown and Caldwell with a cost ceiling of $286,156.57, for completion of the Stage 58 Phase I Project Design and Office Engineering Services during construction, subject to receipt of State Water Resources Board approval of the contract documents. Attachments .dWIL 0 ((ab 0 Central contra costa Sanitary Distric+ BOARD OF DIRECTORS POSITION PAPER I VIA_ ROGER J. DOLAN SUBJECT General Manager—Chief Engineer AUGMENTATION OF DISTRICT FUNDS FOR PROJECT 5A -I (C-06-0696-010 - Step 3) GRANT ADMINISTRATION SUBMITTED BY ENGINEERING, Construction Division - K. Barker ND VI. OB -2, 11/15/79 DATE November 1, 1979 I YPE OF ACTION AUTHORIZATION OF ADDITIONAL FUNDS ISSUE: Additional funding is necessary to continue grant administration for this project until June 30, 1980. BACKGROUND: The Construction Division is administrating the grant for construction of the 5A -I project. The prime contractor (Peterson -Simpson) has been terminated. Requests for Proposals are being prepared in order to obtain the services of another Engineer and Construction Management Firm to complete the 5A -I Project. In addition, the n Di is performing construction management on the emergency owork uand owindvision UP of the Peterson -Simpson and Brown and Caldwell contracts. Expenditures have now exceeded the previous cumulative authorizations of $961,910. Therefore, a supplemental authorization is required. RECOMMENDATION: Authorize an additional $125,000 for Grant Administration and Emergency Construction Management on Project 5A -I (C-06-0696) for a total to date of $1,086,910. INITIATING DEPT./DIV. ole� �O REVIEWED AND RECOMMENDED FOR BOARD ACTION c.. W GEN. MGR, CHIEF ENG. SHEET 1 OF I 0 VI. 0 November 93 , 1979 I1/I! MEMORANDUM TO: THE HONORABLE MEMBERS OF TH VIA: E BOARD OF pIRECTORS Roger J. Dolan, General Manager -Chief Engineer SUBJECT; FINANCIAL PLANNING ISS: To adjust District financing to the Proposition 13 and d the "Spirit of I3" world. with su Enclosed is the latest revision pplemental notes. You recently received the 178-79 Fiscal Y which provided the base for a number of critical � ) of the District Financial Plan to the conclusions and recommendations of figures in the Plan. Year District Audit Prepared in 1974 bundersigneda special Reference is made Board. That exception (increasing and implemented _ Planning and exception subject of thiswith one major exception financing bytthe memo. fixture charges) and other revenue adjustments are the Ad'ustment No, I _Reduce or No - capital reserve fur -d, eliminate property tax revenue capitalQ0es for 1 fund. The District's share of the now being added e the A decision to reduce or elnd iminate nate Presumably world increase moderately in subsequent _ Auditor each year well in advance revenue must be communicated to the Count then have a notation l Tax reduction by 30 preceding the tax Y amount of the credit which will be subtractedtfrom the tax bill. Sanitary Each tax bill will y District and the AB -8 (Chapter 6-100 indicates that this reduction may jurisdiction, but we must be certain that the Count Y be done on an annual basis b that the tax revenue can be restored if future circumstances w Y each Y agrees with this interpretation, so The reasons for this recommendation are arrant its need. have already paid their share o f (1) that the vast majority reserve for the 5g_ plant facilities capital costs including an taxpayers plant, and 2 I expansion, the first stage of 5B_II () and that new connections should finance new facilities. y t adequate as the second and third stages of 5B_ 'and improvements to the present should be financed b II which will benefit both old and newcustomerssuch is not available. y bonds after approval by the electorate, if substantial grant funding A(31'ustr-nent Na. 2 - Increase fixture charge increased since 1973. This revenue is intended rates. for facility re charges have not peen Construction Cost Index has the SF Bay Area. gone from 2236 in December y construction. The ENR rates Although these funds are invested bn high return securities have been significantly lower than construction costs 73 to over 3520 in 1979 for study of future plant facilities and their costs is needed. > interest Percentage increases. Anew Ad'ustment No. 3 _ and return future watershed a ceiling charges from g $6,000,000 on the "Reserve for future trunk sewers" Construction Fund, District financed watersheds to the Sewer Since 1959 when the first established, various watershed trunk sewer $5,OQO,QQO watersheds have been advanced pannilan n as adopted and Board from the Sewer Construction Fuad andcredits(over 1 policy allowed to watershed trunk installers. g and construction funds {over $ ,5Q0,Q00) have been 0 As funds were advanced, they were identified as expenditures watershed and as charges res for each individual 1--lowever, the funds advanced from the l5ewer Co Construction fu Y were credited to each watershed. fund but were finally categorized by the Auditors as connections". fund were not returned to that In 197fl, the total collected from a1�1P watersheds serve for future trunk line expended, including credits, for the first time. exceeded the total One of the end results of the secondary constructing over $sults of 0 e f y watershed Planning $6,000,000 reserve fund separate from the Sewer Construct t program, other than needed system improvements, was to establish a derived from expenditures from the Sewer Construction Fund and transferring it in total to the Sewer Construction Fund, but rod Fund. This fund was in the future if could be eliminated by necessary. My recommendation is to keep this reserve at can e done at any time secondary watershed trunk projects, but direct the revenue frorn water collections to the Sewer Construction Fund, 'use it far future shed trunk charge RECOMMENDATION: These special stud proposals and recommendations should be the subject of a y by a consulting firm expert in municipal financing Problem financial practices and policies, and I would suggest that such a F s. We have a retainer arrangement with Bartle -Wells and they are somewhat familiar with District them as a starting point, study be discussed with W. C. Dal ton Deputy General Manager WCD: jf Deputy Chief Engineer October 5, 1979 CENTRAL CONTRA COSTA SANITARY DISTRICT FINANCIAL PLAN Notes to supplement Financial Plan dated October 5, 1979. Refer to line numbers an left margin of chart. For additional information on planning, the 1978-79 and earlier Annual Audits, the Capital Fund Cash Flow Projection dated October 5, 1979, and the Concord-CCCSD contract tabulations are available. Under wastewater capital improvements, Treatment Plant, the grant % for projects as listed is net to allow for ineligible items. Treatment. Plant includes all reclamation and energy recovery works. 1. Grant Project complete. The 197980 work is for re -grading and restoration for areas used for supernatant ponding, sludge disposal, and construction borrow and fill. The 1980-82 work is for levee reinforcement, controls, structures, and general upgrading. 2. Project incomplete and estimate includes completion and litigation allowances. 3. Project complete. Estimate includes retention adjustment litigation allow- ances. 4. Stage 5B, Phase I project to bring secondary treatment capability to 40 MGD. EIR/EIS hearing was held September 30, 1976 for entire 5B project. Phase I has been split into work which can be done immediately {$600,000} and the balance for capacity which requires final design with construction to start in 1980. 5. Stage 56, Phase II is the solid waste energy recover for natural gas or fuel oil in the existing sewage solids conditionintitroce RDF involves a front-end solid waste processing plant, RDF storage and trap porta- tion, and modifications to furnaces. 6. Stage 5B, Phase III is the second stage of the solid waste energy recovery project which will include expansion of the front-end solid waste plant and of the solids process at the plant. For the purposes of this projection, it was assumed that the project would not be built unless subsidized by grants. The third stage for full energy and production is too dependent upon stages 1 and 2 to be included and may require a local bond issue if proven economic. 7. Stage 6 project is planned to expand the treatment plant capacity to the next logical stage. Although grant funds are anticipated for this project, there is a Possibility that State and Federal laws may be changed. Under present regulations, planning must begin when 75% of capacity is reached. Projections indicate that this expansion must be -in service in the mid -1980'x. Without grants, voter approval for funding may be necessary. 8. Miscellaneous plant improvement projects include alterations to the plant site as well as interval upgrading of various plant elements. 9• Outfall reconstruction is being treated as a capital project. Other repairs and improvements need resolution and may equal any litigation recovery. 10. Line G (Watershed 33) is the major trunk line problem facing the District and planning is under way. Uncertainties about population distribution and density in the service area making it advisable to delay construction and pipe sizing as long as practical. It may be necessary to construct certain segments in advance Of actual need in order to balance capacity. 11. Main trunks are those included in the 1956 Master Plan. 12. Provision for advancement of funds for secondary watershed trunk construction is made in the next few years. Funding can be made from the accumulated Reserve which is now $6,000,000. Recoveries from previous advances and collections of watershed charges should be selectivly or wholly classified as Sewer Construction Fund Revenue and transferred as collected, or annually. 13. Pumping station expenditures for increased pumping capacities in the Martinez interceptor system are involved in Line 12. The Moraga and Orinda stations need further capacity evaluation. 14. Funding is provided for structure sealing and system improvement to improve operation of the collection system and to reduce maintenance costs and infiltration/inflow and for replacement or paralleling of inadequate sewers in Line 16. 15. No Local Improvement District work is planned in the future unless public health problems develop in certain fringe areas. A reversion to bonds under 1911 or 1913 State Improvement Acts would eliminate District funding involve- ment (aside from preliminary engineering and planning). Other agencies such as CAL TRANS or the County require work on a reimbursable basis, but it is usually handled within one fiscal year. 16. Funding for minor improvements to the collection system by District forces. The proposed office is included, 1979-80 thru 1980-81. 17. These are the fixed bond service obligations of the District, and the G.Q. issues are covered by a special tax rate. 18. The Martinez bonds have been redeemed. 19. It may be necessary to borrow on a short-term basis to provide cashflow funding if grant funding is no longer available, or if reserves are temporarily exhausted. 19 A. Repayment of Federal funds by and for industrial users. This section of the Federal regulations has been suspended for further study by Congress. 20. Sewage collection costs are estimated to cover inflation and growth. 21. Sewage treatment costs were previously based on estimates from Brown and Caldwell. For this projection, the present year's budget is increased annually to cover inflation and growth. 22. Provisions are made for increased future maintenance of the outfall. 23- Engineering costs are increased with inflation and growth. A greater proportion of engineering costs are job and capital related and this will increase, It would be advantageous to advance such costs from the Sewer Construction Fund as a budget transfer in the future. 24- Administration was increased for inflation and growth. 25. General, which includes employee benefits and other basic District overhead items, has been merged with "Administration with the intention to distribute more overhead costs to the generating Department or Division in the future. 26• The Environmental Quality Charges (sewer service charges) are based on Present State and Federal regulations. The total amount must generally equal the Operation and Maintenance and replacement costs of the District. In our case, this would be the total O & M expenditure less the payment by Concord for its share of treatment, disposal and overhead costs of the District, less other normal operating revenues. 27- The Special Service Charges were phased out with the implementation of the full sewer service charge in 1977-78 (Line 26) and the industrial cost recovery revenue is substituted thereafter on this line. 28. The major revenue under Service Contracts will be payment by Concord for operational costs for treatment and disposal of their sewage under the Concord- CCCSD Contract of 1974. 29- Property taxes for O & M (Running Expense) were phased out when the full service charge became effective. 30- O & M Revenues & Recoveries reflect charges for services performed such as inspection, permit issuance, franchises, pipe connections and repairs, etc., and interest earned on Running Expense short term investments. 31. Reclaimed water revenue is based on Water District contract guarantees only. 32• "MIscellaneous" reflects payments for repair, relocation, and reconstruction work performed for other agencies on a reimbursable basis, and carry-over funds from the previous fiscal year(s). 33. Contract Capital Payments are the payments by the City of Concord for its share of Central Contra Costa Sanitary District net expenditures for commonly used facilities. 34. Fixture charge revenue is geared to growth of system and to new Sewer Service Charge Units at increased fixture charge rates, if necessary. 35. Annexation charge revenue Is largely dependent on properties already within the District which will develop and pay charges at old rates. 36- Refer to Lines 17 and 49. 37. Property tax revenue for capital improvements can be phased out as adequate capital reserves are accumulated. Other sources of revenue such as increased fixture charges and watershed trunk sewer charges, can be substituted. r-- 38, The overall watershed program showed a surplus for the first time in 1976_7 See Lines 12 and 37. �. 39. It has been assumed that the District will continue its money man, emen program and keen reserves invested. 9 t 40• Grants received and anticipated. More detail is included in the S.C. cash flow Projection, 41. Withdrawals from and additions to { represent the actual difference between total expenditures aCapital to al R� Funds 42. thru 47. Except for 43., this section of the Flan is awaiting new State Water Control Board instructions. Lines 43. A., 43. B,) 44,, 45. & 46Reomrthe District's annual audit. , ae 4$. Accumulated total net cost of treatment and disposal facilities tD taxpayers. oistric t 49, Assessed Valuation projections were Proposition based on the growth factor and Pro 13 limitations. p 50. By law, Assessed Value (Line 48.) and fixed bond service costs (Line 17 establish this rate. . ) 51, The adoption of a sewer service charge, effective for the 1976-77 fiscalear, eliminated the tax rate for O & M or Running Expense. y 52, This pian shows the elimination of the balance of the Running Expense tax rate used for capitalization. 53. Addition of Bond, O & M and Capital tax rates. 54. Plant flow, f,r average dry weather condition in million gallons per da y are based on Concord flow and anticipated rate of growth for service area with no allowance for wet industry or substantial change in water use patterns (based on ABAG projections which are being re-evaluated). 55. This line reflects water pollution treatment capabilities as planned to meet projected plant flows. 56. ' The total annual flow is shown as recorded to date and projected at 400 ADWF. 57. Population served is based on 1970 and 1975 census figures and ABAG projections, which are subject to modification periodically. 58, The Sewer Service Charge units are the estimated units of all types with commercial and industrial connections as equivalents of living units in pterms of dollars. 59, The annual base Service Charge was estimated by balancing the Service Charge Units total and the annual Environmental Quality Charge total, which is fixed by the O & M total and the Concord Contract. 60. The growth rate of the District was assumed to decrease and stabilize as shown. o 61. Inflation was assumed to follow the target assessed value estimates for revenue needs of AB.8 to 1982-83 and then to decrease to 6% which has been fixed by the national administration as an acceptable level. W. C. Dalton Deputy General Manager Deputy Chief Engineer WCD:jf Q 0 (C(SD Central Contra Costa Sanitary arY Costrfct BOARD OF DIRECTORS POSITION PAPER ROGER J. DOWN General Manager—Chief Engineer sus�ecr EXECUTE CONSENT TO DEDICATION TO CONTRA COSTA COUNTY SUBD 5723 - JOB 3226 SUBMITTED Y �ay S. McCoy - ENGINEERING/COLLECTION SYSTEM "Yr• , ••i• I10-3 1 1/15/7! DATE Nov. 13, 1979 TYPE OF ACTION RIGHT OF WAY ISSUE: The extension of Tim Court into new Subd. 5723 runs along a Portion of an existing District easement. Tim Court will be dedicated to the County when the subdivision map is filed. BACKGROUND: The County requires a Consent to Dedication whenever a new road is dedicated to the County for public use if said road encroaches upon an existing easement. This is our standard consent document, the District retains prior ri hts. RECOMMENDATIONApproval, : A g , execute document and authorize its recording RE the County, R$VIEtiI/ED AND RECOMMENDED FOR BOARD ACTION INIT�ITING�DEPT DIV, CLW WCD GEXMGR./CHIEF ENG. SHEET OF SCD Cent0 0 ral Contra Costa Sanitary District BOARD OF DIRECTORS POSITION PAPER V14` ROGER J. DOLAN General Manager—Chief Engineer SU6JECT App ROVE DETACHMENT OF .45 ACRES AT THE WESTERN CORNER OF SHELL AVENUE AND HARBOR VIEW DRIVE IN THE MARTINEZ AREA SUBMITTED BY Jay S. McCoy - ENGINEERING/COLLECTION SYSTEM NO. VII. NB -4 11/15/79 DATE Nov. 13, 1979 r re yr ACTION DETACHMENT ISSUE: The subject property is located on this District's common boundary with Mt. View Sanitary District. The property will be split into two parcels; both can gravity serve Into Mt. View Sanitary District. They would have to pump into our system. BACKGROUND: This District and Mt. View Sanitary District have an understanding that any properties along or between our boundaries shall be included within the boundary of the District that can provide the property with gravity sewer service. RECOMMENDATION: Approve detachment of the subject property and concurrent annexation to Mt. View Sanitary District. Request that Mt. View Sanitary District initiate a Boundary Reorganization procedure with the Local Agency Formation Commission. INIT TINS, DEP /DIV. REVIEWED AND RECOMMENDED FOR BOARD ACTION -C LW WCD 7Z;Z�: SHEET 1 OF 1 �I _JOE CentaCon Contra Costa ((CSD 0 tary District MWP- BOARD OF DIRECTORS NO. POSITION PAPER VIA: ROGER J. DOLAN SUCT General Manager—Chief Engineer BJE AUTHORIZATION FOR P.A. 79-29 (ONE PARCEL) ALAMO AREA, TO BE INCLUDED IN FORTHCOMING DISTRICT ANNEXATION PRO- CEEDINGS SUBMITTED BY Jay S. McCoy - ENGINEERING/COLLECTION SYSTEM Vit. NB -5 11/15/79 DATE Nov. 13, 1979 ANNEXATION Parcel Owner Address No. Area Parcel No. Lead Remarks 79-29 ALAMOA envy H. w. Smith Const. Co. Owner to build one single family San Leandro, CA District 1524 - 150th Ave home on this parcel. 197-070-14 District to prepare a "Notice of Exemption" -58 Acres RECOMMENDATION: Authorize P.A. 79-29 to be included in the next formal anne RE the District. ration INIT1TING tREVIEWED AND RECOMMENDED pOR BOARD ACTION � �V. f ex CLW we D MGR./CHIEF ENG. SHEET OF ((CSD �' ( a Centra Contra Costa Sanitary ®istrQ*-,* BOAR® OF DIRECTORS POSITIOW PAPER VIA: ROGER J. DOLAN General Manager—Chief Engineer MWIZATION TO SIGN PACIFIC GAS AND ELECTRIC/CENTRAL CONTRA COSTA SANITARY DISTRICT AGREEMENT FOR ALTERNATE ELECTRIC SOURC T.P. GM190196 AND THE ADVANCE PAYMENT OF $17,529 TO SU9MITTEO BY PLANT OPERATIONS DEPARTMENT C IC G S AND ELECTRI NO. VII. NS -6 11/15/7! OATS November 8, 1979 TYPE OF ACTION AUTHORIZE EXECUTION OF AGREEMENT Issue: The provision of a standby electric power source l i Reclamation Plant will require a signed agreement betweenfPaclfor icwGasrandlEut on control, tral Contra Costa Sanitary District. en - Back round: The Water Pollution Control/Reclamation facility presently has only one source of electric power for the operation of the Plant. A standby power system has been approved by the State for funding and is presently being designed. In order to provide electric power to the standby between Pacific Gas and Electric and the Sanitary Distriictewillstemhave to bereement executed. This agreement provided 1.8 mva of electric power on a "when available basis" (having a reserved capacity would have costa required to a pproximately $20,000 per mo.) we are P Y $17,529 in advance for Pacific Gas and Electric costs, and we will be committed to a total monthly cost of $460, of which $253.77 may be discontinued at a later date. This agreement meets the requirement of providing a second independent of the primary power source, which will Power source completely failure of the treatment Plant's provide emergency power during a primary power source. Recommendation: Authorization to sign Pacific Gas and Electric/Central Contra Costa Sanitary District agreement, Treatment Plant GM190196 and make the required advance Payment of $17,529 to Pacific Gas and Electric. INITIATING d£PT./bIV. REVIEWED AND RECOMMENDED FOR BOARD ACTION i J. J. C. C. W. SHEET OF F ENG. a October 2, 1979 MMORANDUM FOR: HONORABLE MEMBE]RS OF THE BOARD OF DIRF�G'i�Ogs FROM: Roger J. Dolan, General Manager --Chief Engineer SUBJECT: AUTHORIZATION TO SIGHT PAC* C GALS AMID ELECTRIC/CENTRAL 03N'.rRA COSTA. SANITARY DISTRICT Ate' FjjR ALTMW= ELECTRIC SOURCE COMMA T, T.P. GM 190196 and THE ADVANCE PAYMENT OF $17,529 its PACIFIC GAS AND E &.r= MC Issue: rhe provision of a standby electric Pollution Control power source for the Water Pacific Gas and Electric/C7entral Contra lCo�, require a, sib a��t between Sanitary District. Back-- ground: The Water Pollution Contml/Reclamaticn, facility bias orily one source of electricpy power for the operation of the Plant. A SAY r system has been approved by the State for funding and is presently bung designed. In order to provide electric power to the em Rent between Pacific Gas and Electric and the Ssystem, an ace- to be executed. Y District will have This agreement provides 1.8 mva of electric power on a "when available basis„ (having a reserved capacity would have cost an additional $ are required to pay $17,529 in advance for Pacific Gas and Electric oasts, and we will. he c=Mitted to a Natal monthly cost of $460, of which: $253.77 ray be discontinued at a later date. This agreercent meets the .requirement of Providing a second power source cmletely independent of the primary power source, which will provide sow cy Power during a failure of the Treatment Plant's primary Powe Ream mandation: Authorization to sign Pacific Gas and Electric/Central Contra Costa Sanitary District agreement, Treatment Plant Q4190196, and Rake the required advance payment of $17,529 to Pacific Gas and Electric. Roger J. Dolan RJD:bc General Manager -thief Erugineer Reviewed by: J. J. Ca niato Distric Legal Counsel it ( t T C' G'. w 0 (D '((j5D Central Contra Costa SanitaryDistrict r�ct BOARD OF DIRECTORS I POSITION PAPER VIA' ROGER J. DOLAN 1 Genera! Manager—Chief Engineer suerEcz AUTHORIZATION TO EXECUTE A CONTRACT WITH FMC ASSOCIATES FOR REPAIRS TO THE SOLIDS CONDITIONING BUILDING SUBMITTED BY John Larson - ENGINEERING/SPECIAL PROJECTS N U. VII. NB -8 11/15/7! ------------ UA i E Nov. 13, 1979 TYPE OF ACTION AUTHORIZE EXECUTION OF CONTRACT BACKGROUND: The boiler room explosion on September 24, 1979, caused significant damage to the solids conditioning building and its various systems. Temporary repairs allowing interim operation of the auxiliary boilers were completed on November 7, 1979, and the rental boilers have been removed. Detailed engineering and architectural work is required to return the solids conditioning building to its original condition. Design of repairs to the various mechanical, electrical, and instrumentation systems is estimated to require 2060 man hours of engineering and drafting. Design of architectural and structural repairs is estimated to require 440 manhours of effort. This level of effort is beyond the capacity of the Engineering Department. A scope of work has been discussed with FMC Associates, designers on the steam line repairs. They have the engineering/architectural capability of completing this work in a timely manner. Because of the difficulty in defining a detailed scope of work, a cost times a multiplier contract with a cost ceiling appears to be the most appropriate type of contract. In addition to designing the required repairs to the solids conditioning building, FMC Associates will provide the design for a new sludge thickener odor control .facility. Of necessity, the new design should consider all odor sources in the vicinity. Because of previous odor problems experienced with using the floor drain system for centrate disposal, the scope of work, should be expanded to include evaluation and design of an alternative centrate disposal system. The estimated cost ceiling for engineering is: Solids conditioning building repairs 66, Centrate Disposal System Modifications $000 $1100,,000 Total $76,000 Engineering work for the centrate disposal system may be performed by FMC Associates, or another engineering firm. Funding for the solids conditioning building repair work would come out of the boiler room explosion account previously established. A new sewer construction account is needed for design of the centrate disposal system. REVIEWED AND RECOMMENDED FOR BOARD ACTION INITIATING DEPT./Div. r J.L. C.L.W.W.C.A. r G M R/CH F ENG. SHEET 1 OF 2 f POSITION PAPER Nov. 13, 079 °age Two I RECOMMENDATION: Authorize the execution of a contract with FMC Associates for design of repairs to the solids conditioning building with a cost ceiling of $66,000. Authorize the execution of a contract for evaluation and design of a centrate disposal system with a cost ceiling of $10,000. ((CSD 0 Central Contra Costa Sanitary District BOARD OF DIRECTORS POSITION PAPER VIA: ROGER J. DOLAN General Manager—Chief Engineer SUBJECT AUTHORIZATION OF $15,000 FOR SURVEY & DESIGN OF DSP 3023 A RELOCATION OF SEWERS TO ACCOMMODATE THE MODIFICATION OF THE OAK PARK BLVD AND GEARY ROAD INTERSECTIONS WITH INTERSTATE 680 STATE UTILITIES AGREEMENT 106.75.) SUBMITTED BY Jay S. McCoy - ENGINEERING/COLLECTION SYSTEMS No. VII. NB -9 11/15/79 DATE Nov. 13, 1979 I YPE OF ACTION AUTHORIZATION OF $15,000 FOR SURVEY & DESIGN OF DSP 3023 BACKGROUND: The State has directed this District to submit relocation plans by December 17, 1979, for sewer in conflict with the State's proposed modifi- cation to the subject intersections. The cost of the work to be borne by the State. The preliminary estimate for the sewer relocation project is $60,570.00. RECOMMENDATION: Authorize $15,000 for survey and design of DSP 3023, a relocation of sewers to accommodate the State, UT 106.75.0. V. REVIEWED AND RECOMMENDED FOR BOARD ACTION INIT ;T�2 DEPT. DI CLW WCD MGR./CHIEF ENG. SHEET OF K N (((SD Central Contra Costa Sanitary District BOARD OF DIRECTORS NO. Bids1 . is- 71 POSITION PAPER vIA. ROGER J. DOLAN DATE Novemb er i 4, 1979 General Manager—Chief Engineer SUBJECT TYPE OF ACTION REQUEST AUTHORIZATION TO ACCEPT VEHICLE BIDS Acceptance of Bids 1979-1980 DISTRICT BUDGET - TOTAL: $68,865.82 Authorize Purchase SUBMITTED BY Robert H. Hinkson, Manager, Collection System Operations ISSUE: Bids were received November 7, 1979 for ten (10) vehicles authorized in the 1979-1980 District budget. BACKGROUND: SPEC. NO. TYPE NET PRICE BIDDER A 1 1/2 Ton Pickup $ 5,622.40 Anderson GMC B 2 Small Pickup (4 Speed) 11,130.98 Don Young Ford C 2 Small Pickup (Automatic) 12,210.00 Don Young Ford D 2 3/4 Ton Pickup 14,120.82 Anderson GMC E 1 Sub/Compact 5,308.90 Sun Valley Ford F 1 1-1/2 Ton Cab/Chassis 14,217.65 Sun Valley Ford G 1 Compact Sedan 6,255.07 Sun Valley Ford Total Aggregate Bid: $68,865.82 1 1 Compact Sedan 6,166.01 $75,031-83 *Purchased in August, 1979 In order to expedite delivery and to reduce costs we have chosen to independently contract for the painting of the District colors on some of the units for $750.00. We will have the utility beds for the 3/4 ton units reconditioned at $600.00 each ($1,200.00 total). The dump box for the 1-1/2 ton chassis will be purchased and installed by Transport Supply for $4,441.00. The total expenditure will be $81,422.83. This will be slightly below the budget figure of $81,600.00. RECOMMENDATION: Authorize acceptance, and award vehicle bids in the amount of $68,865.82. REVIEWED AND RECOMMENDED FOR BOARD ACTION ITIATING DEPT./QIV. EN R./C IEF ENG. SHEET l OF 1