MEMO TO: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: AUTHORIZATION FOR P.A. 79-22 (three parcels) DANVILLE AREA
AND P.A. 79-23 (one parcel) DANVILLE AREA, TO BE INCLUDED
IN FORTHCOMING DISTRICT ANNEXATION PROCEEDINGS
Owner
Parcel Address
No. Area Acreage Parcel No.
Remarks
-6- 79
N.B. 2
Lead
AdP_nry Art i
79-22
DANV.
24.05
SIDNEY CORRIE, JR.
1324 SPRING hEADOWS LN.
PROPERTY TO BE SPLIT INTO
COUNTY
CONCORD, CA 94521
THREE PARCELS. OWNER PLANS TO
BUILD THEIR RESIDENCE ON ONE
199-070-014, -15, - 16
PARCEL AND DEVELOP REMAINING
SITES AT A LATER DATE. NEGATIVE
DECLARATION BY COUNTY.
79-23
DANV.
0.98
JOHN DONOVAN, ET UX
EXISTING HOUSE - SEPTIC TANK
CCCSD
132 LA QUESTA DRIVE
HAS FAILED, MUST CONNECT TO
DANVILLE, CA
SEWER.
216-160-003
RECOMMENDATION: Authorize P.A. 79-22 and P.A. 79-23 to be Included in the
next formal annexation to the District.
JSM:sf
Reviewed By:
Clark L. Weddle
Mgr.,Engineering Dept.
Respectfully submitted,
Jays S. McCoy
Collection System Engineering
and Services Division Manager
Reviewed By: &RogeJ.
tion pp roved:
W. C. Dalton 1 an
Dep.Gen.Mgr.-Chief Engr. Gen.Mgr.-Chief Engineer
s
N.B . 5
August 31, 1979
MEMO TO: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: AUTHORIZE $135.00 FOR PAT DANNA TO ATTEND A SEMINAR ON DESIGNING
OF FORMS IN SAN FRANCISCO ON SEPTEMBER 14, 1979
ISSUE: This seminar will provide valuable information designed to lower
printing and processing costs of forms.
BACKGROUND: Pat Danna designs all forms used at the District. Her design
work involves taking an idea or sketch and turning it into a final product.
The seminar program as shown on the attachment contains a great deal of
pertinent information directly related to the work that Pat does. The seminar
content will provide up-to-date information which can be used to streamline
current work practices.
RECOMMENDATION: Authorize $135.00 for Pat Danna to attend a seminar on
designing of forms in San Francisco on September 14, 1979.
Respectfully submitted,
Jay S. McCo
Y
Collection System Engineering
and Services Division Manager
JSM:sf
Attachment
Reviewed By: Reviewed By: Recommendation Ap roved:
Clark L. Weddle W. C. Dalton *Roger4J.D
Manager, Engr. Dept. Deputy Gen.Mgr.-Chief Engr. General Manager -Chief Engr.
Here"s ghat You Gag Q
You will receive practical, step by step forms design instructions.
These how -to -do -it professional techniques will he presented by
Marvin Jacobs, using close-up color slides. This shirtsleeves,
no-nonsense seminar does not deal in theories and vague concepts.
It is hard hitting and intensive. It includes slide lectures, group
discussions and question and answer periods. You will learn
techniques that you can put to immediate use.
In addition, you will receive a take-home packet
containing THE RECENTLY PUBLISHED BOOK,
"FORMS DESIGN, CLEAR AND SIMPLE", forms
management, forms analysis and forms design reference
sources (associations, publications, suppliers, educational
programs, etc-), printing specification forms, a certificate
of completion... and much morel
The seminar is designed for both the beginner and the
experienced person who is involved with business forms. It
will provide practical information and how -to -do -it techniques to
those involved in the teaching, management, analysis, designing,
spec writing, sales, production, purchasing, typesetting and
printing of business forms.
Seminar mates ar t- Lceatians
SEPTEMBER 13 -- IAS ANGELES
Los Angeles Bonaventure Hotel, Fifth and
Figueroa, Los Angeles, California 90071,
(213) 624-1000
SEPTEMBER 14 --ht� k RAS N�GL`SC;O
Hyatt Hotel on Union Square, 345 Stockton Street,
San Francisco, California 94108, (415) 398-1234
DALLAS — OCTOBER 18
HOUSTON — OCTOBER 19
PHILADELPHIA — NOVEMBER 15
WASHINGTON, 1).C, -- NOVEMBER 16
SEMINAR PROGRAM
9:00 a.m. - 4:00 P.M.
8:45 Registration / Coffee and Danish Roils
goo Introduction to Forms Design
The relationship between forms design and the efficiency of
paperwork systems. An overview of forms management and
forms control.
Forms Analysis Overview
The collection and analysis of information concerning thefill-
in and processing of the form
10.15 Coffee Break
10:30 Principles of Forms Design
The basic principles of scientific forms design (grouping into
standard form components, establishing ilem sequence,
horizontal and vertical spacing for handwritten and machine
written forms, box and other design styles).
Form Graphics
Selecting type and line weights, forms typography (serif vs.
saris serif, point sizes, caps vs caps and lower case), optical
balance, contrast, logo deve,opment, color, graphic aids
(screens, reverses, etc.).
Noon Group Luncheon
1:oo Step -by -Step Design Procedures
Forms design tools (design rulers, design layout papers,
design triangle, etc.). Determining the form size, basic
drawing procedure, caption lettering, indicating text, screens,
reverses, etc., professional design techniques (columns,
ballot boxes, eye guides, key itern highlighting, etc.).
2.45 Coffee/Soft Drinks
3.0o Forms Construction and Specialty Forms
The difference between sheet -fed and web press forms,
forms construction, special features (numbering, punching,
perforating, etc.), marking the layout for special features,
designing unit sets, continuous and other specialty forms.
Printing Specifications and Procurement
Purpose of written printing specifications, writing the
specifications, how to get lorms printed quickly and
accurately.
4 00 Conclusion
Seminar Leader: Marvin Jaeu'Eps
Marvin Jacobs is the president of Formsman Inc., a forms design
and typesetting corporation serving more than 200 accounts
nationwide. He is also a forms and typesetting author and lecturer.
Mr. Jacobs has conducted more than 7.00 seminars
which have been attended by more than 4,000 participants.
He is a frequent speaker at graphic arts meetings conducted by
associations such as The Fusiness Forms Management Associa-
tion, The In -Plant Printing Management Association and The
National Composition Association.
He is also the author of two typesetting books, a forms
design book and numerous articles in trade journals.
011PncP t-ss«rw ..-mdss ir%« Anel Cva- P e►fiPr
a9au!6u3 491g3-aa6eueW leaauag
uelo •p j 60d
:Aq panojddy
aao14JO lauuosaad
°11 'g 11eq
G:
'paI!wgns �KI- nj43adsab
•oossy saaAoldw3 as000 `4u9p!s9ad
suaga!M •W aa49d
—0 l"f
:Aq paMa!naa
j9au! 6u3 jaiq3 Ainda0
-aa6eueW leuaua0 Ainda0
uozle0 •O 'M
:Aq paMa!nag
wa :-199
.J3eJs Jol.ilsl0
oa uo!;nq!lls!p pue uolleo!lgnd 6u!z!uoggne pue loogpueH aql Jo lenoadde
s,paeog aya 6ullsanbaa ,jaded uo!l!sod a auedaud ll!M 944 yluow lxaN
•Ma!AaJ s,pueog aql joj painq!als!p 6u!aq s! loogpueH aaAoldw3 aql :3nssi
N0O9ONVH 33AOldW3 3H1 3O AdOO 13tl2i0 30 NOI.LngIbISIO :133MS
aaau!6u3 ja!g0-aa6eueW leaauag 'uelo0 •p aa6og :VIA
SNIO32i 10 30 0 VOO 3141 30 U39W3W 319VHNOH 3141 :01 wnaNVHOW3W
6L61 `g uagwaidaS
$'9'N
N.B.9a
September 6, 1979
MEMO TO: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: W. C. Dalton, Deputy General Manager -Chief Engineer
SUBJECT: APPROPRIATION OF SEWER CONSTRUCTION FUNDS TO COMPLETE CHLORINATION
SYSTEM PROJECT
Issue: It has been recommended by District counsel that the Chlorination
Project be considered as an emergency project and that emergency funding be
appropriated from Sewer Construction Funds to complete the work as soon as
possible.
Background: The preliminary total cost for completing the Chlorination Project is
estimated at $73,100, which includes construction and engineering costs as follows:
1. Construction Costs
New chemical air pad System and Appurtenances $29,300
Chlorine piping modifications 13,400
Install two new evaporators 19,300
Subtotal $62,000
2. Engineering Costs
Engineering to Date $ 5,050
Estimated engineering required to complete work 2,750
Construction Management 3,300
Subtotal $11,100
Grand Total $73,100
The above work is recommended to provide a safer, more reliable system which
also retains the features of the existing design.
Recommendation: Adopt resolution declaring this project to be an emergency
project, and authorize the appropriation of sewer construction funds in the
amount of $73,100 to complete the Chlorination System Project.
Respectfully submi ted,
Clark L. Weddle
Manager, Engineering Department
�! N.B.9 a
September 4, 1979
MEMO TO: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: W. C. Dalton, Deputy General Manager -Chief Engineer
SUBJECT: APPROPRIATION OF SEWER CONSTRUCTION FUNDS TO COMPLETE CHLORINATION
SYSTEM PROJECT
Issue: It has been recommended by District counsel that the Chlorination
Project be considered as an emergency project and that emergency funding be
appropriated from Sewer Construction Funds to complete the work as soon as
possible.
Background: The total cost for completing the Chlorination Project is
estimated at $53,690, which includes construction and engineering costs as
follows:
1. Construction Costs
o New chemical air pad System and Appurtenances
o Chlorine piping modifications
• Install two new evaporators
Subtotal
2. Engineering Costs
o Engineering to Date
s Estimated engineering required to complete work
Subtotal
Grand Total
$21,300
9,700
14,900
$45,900
5,040
2,750
7,790
$53,690
The above work is recommended to provide a safer, more reliable system which
also retains the features of the existing design.
Recommendation: Adopt resolution declaring this project to be an emergency
project, and authorize the appropriation of sewer construction funds in the
amount of $53,690 to complete the Chlorination System Project.
Respectfully submitted,
Clark L. Weddle
Manager, Engineering Department
CLW:sf
Reviewed By:
W. C. Dalton
Dep•Gen•Mgr.-Chief Engr.
pWrovedy•Roolan
General Manager -Chief Engineer
N.B.9b
September 4, 1979
MEMORANDUM TO: HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager - Chief Engineer
SUBJECT: AUTHORIZATION NOT TO EXCEED $3,250 FOR SEWER AND WATER
LINES TO SERVICE ENGINEER DEPARTMENT TRAILERS
ISSUE:
Sewer and water service is required for the three Engineering
Department Trailers south of the Treatment Plant Administration
Building.
BACKGROUND:
Because of the lack of personnel office space at the Treatment
Plant the Engineering Department Manager, Special Projects, and the
Construction Section of the Construction Division have recently moved
into three trailers located south of the Treatment Plant Administration
Building. The Construction Division solicited quotes from the following
contractors:
Newell Downs
B & J Sewer Contractors
Barrett & Barrett
Don's Sewer Service
Baptista Septic Tanks & Sewer Service
Only Newell Downs submitted a quote for the work. The rest of the
contractors did not submit a quote because there are presently a lot of
larger sewer projects going in the District for which they are committed.
The Newell Down's quote for $2,955.00 is lower than our estimate for
$3,120.60 using Lee Saylor's current costs as a basis of the estimate.
The Newell Down's quote for $3,120.60 plus a ten percent contingence
equals the total for $3,250.00.
The cost of providing sewer and water service was included in the
budget for establishing services to temporary trailers.
MEMORANDUM TO: HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
RECOMMENDATION :
Authorization not to exceed $3,250 for sewer and water line to
service Engineering Department Trailers south of Treatment Plant
Administration Building.
Respectfully submitted,
K. KFoe�-
Construction
Division Manager
ATTACHMENTS
Reviewed B :
W. C. Dalton
Deputy General Manager
-T -
k\x��
Clark Weddle
Deputy Chief Engineer
(2)
R endat'n proved:
Roge J. lan
General Manager - Chief Engineer
CER17irAr CpNrCA cosr,# SANirA)Tv D/fTA/CT
O N/ 6 a y ,r C,45 E AvGvsT 3i� s 79
COST INFORMATION
DOWNS PIPELINE ESTIMATE BASIS
QUOTE LEE SAYLOR
Description Quantity Unit Price Total Unit Price Total
4"Sch 40 PVC 205 ft $7.00/LF $1435.00 $9.42/LF $1931.00
li"Sch 40 PVC 390 ft $3.00/LF 1170.00 $3.05/LF 1189.50
Manhole 1 ea $150.00 150.00 included in above
Connection
Cleanouts 4 ea $50.00 200.00 included in above
Subtotal 11 $2955.00 11 $3120.60
10% contingence 295.00
Total $3,250.00
CENTRAL CONTRA COSTA SANITARY DISTRICT
WORK ORDER AND AUTHORIZATION
Job No.
Description
Position Paper:
Date 9/4//9 Lead Dept. Eng.
Date Board Approved
Authorization S
Date Acctg. Notified
Date Work Complete
Date Closed Account
Request approval of the following work order and authorization:
proposed Position Paper (P.P, j attached if further information is needed complete requested data below
DESCRIPTION: Sewer and Water service for three tram err south of T'rPat-mPnt P1 aRt
Administration Building
BACKGROUND:
See Position Paper
COST DETAIL: Is this a grant project? Yes No (It Yes, attach accounting procedure for grant)
Dept. Share
Engineering
Maintenance
Plant Operations
Others:
Total Authorizations?
REMARKS:
Requested By:
Department Manager
Estimate
$3,260
Reviewed By:
W.C. Dalton, Deputy GMCE
Acct. No.
52000.1.08
Final Cost
Authorized By:
Roger J. Dolan, GMCE
Attachment: Proposed P.P. to Board 2089-5-77
N.B.9b
September 4, 1979
MEMORANDUM TO: HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager - Chief Engineer
SUBJECT: AUTHORIZATION NOT TO EXCEED $3,250 FOR SEWER AND WATER
LINES TO SERVICE ENGINEER DEPARTMENT TRAILERS
ISSUE:
Sewer and water service is required for the three Engineering
Department Trailers south of the Treatment Plant Administration
Building.
RArvnPn!!Nn
Because of the lack of personnel office space at the Treatment
Plant the Engineering Department Manager, Special Projects, and the
Construction Section of the Construction Division have recently moved
into three trailers located south of the Treatment Plant Administration
Building. The Construction Division solicited quotes from the following
contractors:
Newell Downs
B & J Sewer Contractors
Barrett & Barrett
Don's Sewer Service
Baptista Septic Tanks & Sewer Service
Only Newell Downs submitted a quote for the work. The rest of the
contractors did not submit a quote because there are presently a lot of
larger sewer projects going in the District for which they are committed.
The Newell Down's quote for $2,955.00 is lower than our estimate for
$3,120.60 using Lee Saylor's current costs as a basis of the estimate.
The Newell Down's quote for $3,120.60 plus a ten percent contingence
equals the total for $3,250.00.
The cost of providing sewer and water service was included in the
budget for establishing services to temporary trailers.
MEMORANDUM TO: HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
RECOMMENDATION.:
Authorization not to exceed $3,250 for sewer and water line to
service Engineering Department Trailers south of Treatment Plant
Administration Building.
Respectfully submitted,
K. Barker
Construction Division Manager
ATTACHMENTS
Reviewed B
W. C. Dalton
Deputy General Manager
Clark Weddle
Deputy Chief Engineer
(2)
Recommendation Approved:
Roger J. Dolan
General Manager - Chief Engineer
191
CofAl rqG to VrA.,o cosTof 54N4,*-AMv oisTR/cT
EAlG rN &'EAfiNG vEvA.fT/�tENT
• ON/G Dy d 'r.45Fs Avc�sr 3�� X979
COST INFORMATION
DOWNS
PIPELINE
ESTIMATE BASIS
QUOTE
LEE
SAYLOR
Description
Quantity
Unit Price
Total
Unit Price
Total
4"Sch 40 PVC
205 ft
$7.00/LF
$1435.00
$9.42/LF
$1931.00
li"Sch 40 PVC
390 ft
$3.00/LF
1170.00
$3.05/LF
1189.50
Manhole
1 ea
$150.00
150.00
included in
above
Connection
Cleanouts
4 ea
$50.00
200.00
included in
above
Subtotal
$2955.00
$3120.60
10% contingence
295.00
Total
$3,250.00
CENTRAL CONTRA COSTA SANITARY DISTRICT
WORK ORDER' AND AUTHORIZATION
Job No.
Description
Position Paper'.
Date9/4/79 Lead Dept. Eng.
Date Board Approved
Authorization S
Date Acctg. Notified
Date Work Complete
Date Closed Account
Request approval of the following work order and authorization:
proposed Position Paper (P.P.1 attached if further information is needed complete requested data below -
DESCRIPTION: Sewer and Water service for three tr!il ers south of Jr afinent_ el ant
Administration Building
BACKGROUND:
See Position Paper
COST DETAIL: Is this a grant project? Yes No (If yes, attach accounting procedure for grant)
Dept. Share
Engineering
Maintenance
Plant Operations
Others:
Total Authorization(s)
REMARKS:
Estimate Acct. No. Final Cost
$3,260 52000.1.08
Requested By: Reviewed By: Authorized By:
Department Manager
W.C. Galton, Deputy GMCE
Roger J. Golan, GMCE
Attachment: Proposed P.P. to Board 2089--6-77
September 6, 1979
MEMORANDUM TO: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: AWARD OF CONTRACT FOR D.S.P.3058-I (HOLDING BASIN
RENOVATION PROJECT)
BACKGROUND: Advertising for bids was authorized by the Board on August 2,
1979, and bids were received August 29, 1979. The low bidder (Winton Jones
Contractor, Inc.) has previously done work for the District and after present
investigation is considered by staff to be an acceptable contractor for the
project.
RECOMMENDATION: Award contract for D.S.P.3058-I to the low bidder, Winton
Jones Contractor, Inc. for the bid price of $182,145.00.
Resp fully submit ed,
Ro r J. Dolan
General Manager -Chief Engineer
RJD:rm