MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: WATERSHED 35 SOUTH TRUNK CHARGE
ISSUE: Adjustment of the watershed charge to current conditions.
BACKGROUND: On August 10, 1978, a study of the WS 353 trunk situation was presented to
the Board with certain recommendations. All recommendations were approved with the
reservation that staff would review and confirm actual costs based on a pending contract, and
would ask for correction, if the estimate presented was out of line. This has been done, and
while the actual construction cost decreased, so did future connections. The end result was a
slightly higher unit charge from the $1,000 first recommended.
RECOMMENDATION: Adopt an Ordinance fixing the WS 35 South charge at $1,050.00 per
residential unit and 2,000.00 per acre minimum for non- residential uses.
Respectfully submitted,
W. C. Dalton
Deputy General Manager -Chief Engineer
WCD:jf
Recommendation Approved:
Roger J. Dolan
General Manager -Chief Engineer
16 nly- 2
f ``1 VI. os
L� 2
10/19/78
October 16, 1978
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: DISTRICT ANNEXATION NO. 60
ISSUE: Adoption of Resolution Ordering Annexation of territory encompassed in District
Annexation No. 60.
BACKGROUND: District Annexation No. 60 contains 842 acres in 40 parcels, is legally
inhabited and a logical extension of District service. These parcels have been submitted
by their owners and approved by the Board for annexation over the past year. Following
the Resolution of Application and the hearing before LAFC on October 4, 1978, the
annexation was approved by LAFC without the necessity of further notice or hearing
or calling for an election by the Board of Directions.
RECOMMENDATION: Adopt resolution ordering the annexation of territory contained
in Distsrict Annexation No. 60.
Respectfully submitted,
U'�e�
W. C. Dalton
Deputy General Manager -Chief Engineer
WCD:jf
Recommendation Approved:
Roger I Dolan
General Manager -Chief Engineer
VII, 8 NB
10/19/78
October 11, 1978
MEMORANDUM FOR: HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: AUTHORIZATION OF $250 FOR THE PURCHASE OF NICKLE-
CADMIUM BATTERY TESTER
Issue: Due to uneven charging /discharging cycles, it has been difficult to
maintain the nickle- cadmium batteries used in the RCA portable walkie talkies
at full charge.
Background: Nickle- cadmium batteries provide a reliable source of power for
portable radios when they are fully charged. Unfortunately, these batteries
can be overcharged which then decreases their effectiveness. Repeated over-
charging will ultimately make the battery appear to be "dead," at which point
it is usually discarded.
A new device has been released by RCA which tests batteries by slowly
draining current until the unit drops to 8v, after which the unit is given a
full recharge. Such a maintenance tool will prolong the usefullness of the
twenty batteries currently used at the plant and will prevent their premature
discard, thus saving $80 a piece.
Recommendation: Board authorization of $250 for the purchase of one RCA
nickle-cadmium battery tester.
DGN:mg
A dation App ved:
D an
General Manager -Chief Engineer
Respectfully submitted,
(�R . 0. fi _.►
D. G. Niles
Manager, Plant Operations
E0
October 11, 1978
MEMORANDUM FOR: HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
VII. N8
7
10/19/78
SUBJECT: AUTHORIZATION OF $2,000 FOR PURCHASE OF DECWRITER TELEPRINTER
Issue: A computer input terminal with hardcopy output is required for
MIS applications.
Background: Phase I of the Stage 5B contract specifies a DECWRITER, Model LA36
teleprinter to be supplied, primarily for production of documents for the pre -
ventive maintenance program, operations reports and required regulatory reports
but also to act as a backup unit for an identical unit which serves as the online
alarm /event logging printer. MIS application programs such as the preventive
maintenance package are currently being put into use, and the need for this
teleprinter exists ahead of the release of the specification.
Recommendation; Board authorization of $2,000 for purchase and installation of
one DECWRITER Model LA36 identical to an existing unit.
DGN mg
Recommendation Approved:
Lam, r.-,r
Roger J. Dolan
General Manager -Chief Engineer
J
Respectfully submitted
fiyz�'
D. G. Niles
Manager, Plant Operations
VII. NB
70/79/78
September 29, 1978
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: AUTHORIZE $5,763.76 ADDITIONAL FUNDS FOR CORROSION ENGINEERING
WORK BY CERCO AND EXTEND THE EXISTING AGREEMENT WITH CERCO FOR
ONE YEAR INCORPORATING A NEW FEE SCHEDULE
ISSUE: The agreement that Corrosion Engineering and Research Company ( CERCO) has
with the Sanitary District has expired but the work contemplated under the agree-
ment has not been completed.
BACKGROUND: CERCO`s initial agreement with the District was first approved by
the Board on September 18, 1975. The agreement was extended in September 1977 to
September 18, 1978.
The work contemplated under the initial agreement and changes to the original
scope of work are explained in the attached letter. A new fee schedule is also
attached. A summary of costs is included below:
PROJECT
LID 50 MARTINEZ
K -3A LINE
CHARLES HILL
MISCELLANEOUS
PROJECTS
NAVAL WEAPONS
AUTHORIZA-
WORK DONE
WORK DONE
INCREASES
ESTIMATED
TION FOR
UNDER ORIG.
UNDER CHANGED
DUE TO
AMOUNT TO
ORIG.SCOPE
SCOPE OF
SCOPE OF
NEW FEE
COMPLETE
OF WORK
WORK
WORK
SCHEDULES
PROJECT
$6,500
$2,717.25
$4,057.00
$600.00*
$2,000.00
5,000 296.85 0
2,500 1,693.36 0
ADD IT ION L
AUTHORI-
ZATION
NEEDED
$2,874.2
2,000.00 ** 7,000.00 2,296.8
N
PUMP STATION 2,700 2,692.66 0 0 600.00 592.61
* Previously paid
** To be paid $5,763.71
RECOMMENDATION: Authorize $5,763.76 additional funds for corrosion engineering
work by CERCO and extend the existing agreement with CERCO for one year incorporating
a new fee schedule.
Respectfully submitted,
'by S. McCoy
Collection System Engineering
and Services Division Manager
JSM: sf
Attachments
. . . ove r
September 26, 1978
CERCO Nos. 7540
7541
7542
7730
Central Contra Costa
Sanitary District
P. O. Box 5266
Walnut Creek, California 94596
ATTENTION: Mr. Jay McCoy
SUBJECT: Consulting Agreement
Various Projects
Gentlemen:
(415) 697-2954
c-1n
In accordance with your request, we have reviewed the referenced projects and are
pleased to furnish an explanation of changes in scope of work and additional costs
involved.
The initial agreement between CCCSD and CERCO was first approved by the Board of
Directors on :'�--ptember 18, 1975. Authorization• was received or. September 22, 191-5 to
proceed with work for the following projects based upon estimated costs submitted by
CERCO:
Estimated Cost
LID -50 Martinez $6,500.00
K -3A Line - Charles Hill 51000.00
Miscellaneous Projects 2,500.00
LID -50 MARTINEZ
Tha initial estimate for LID -50 Martinez was based upon conducting pipe to soil
potential measurements along each section of pipeline, conducting interference tests
adjacent to other cathodically protected facilities and submitting a report
N
n
cl
tai
tj
Q
W
a3
tj $
.I w tw . 72
September 26, 1978
CERCO Nos. 7540
7541
7542
7730
Central Contra Costa
Sanitary District
P. O. Box 5266
Walnut Creek, California 94596
ATTENTION: Mr. Jay McCoy
SUBJECT: Consulting Agreement
Various Projects
Gentlemen:
(415) 697-2954
c-1n
In accordance with your request, we have reviewed the referenced projects and are
pleased to furnish an explanation of changes in scope of work and additional costs
involved.
The initial agreement between CCCSD and CERCO was first approved by the Board of
Directors on :'�--ptember 18, 1975. Authorization• was received or. September 22, 191-5 to
proceed with work for the following projects based upon estimated costs submitted by
CERCO:
Estimated Cost
LID -50 Martinez $6,500.00
K -3A Line - Charles Hill 51000.00
Miscellaneous Projects 2,500.00
LID -50 MARTINEZ
Tha initial estimate for LID -50 Martinez was based upon conducting pipe to soil
potential measurements along each section of pipeline, conducting interference tests
adjacent to other cathodically protected facilities and submitting a report
0
CCCSD -2- September 26, 1978
recommending corrective action. A pipe to soil potential survey was completed along
the pipeline in June 1976. Results of this survey indicated all pipeline sections were
inadequately protected, and current requirements had substantially increased since
initial construction. The District was advised that additional testing would be required
in order to identify the problems involved and determine necessary corrective action.
The alternative would have been to submit the report recommending additional testing.
We were advised by the District to continue testing and attempt to identify the problems
involved. When authorized funds have been expended, additional funds would be
requested. In an effort to determine the cause for increased current requirements for
each section of pipeline, extensive testing has been performed which was outside the
original scope of work. In addition, delays in installation of new test facilities by the
District and scheduling problems by CERCO resulted in some increase in costs due to
increases in our Fee Schedule. Based upon the original Fee Schedule of 1974, additional
testing which was outside the original scope of work amounted to $4,057.00. Work
performed since the new Fee Schedule was authorized by the Board of Directors resulted
in an additional $600.00 increase. Therefore, changes in scope of work plus increased
rates accounts for an additional $4,657.00 over and above work which was originally
planned.
We are presently analyzing test data which was collected for this project. Estimated
costs for completion of analysis and the report amount to $2,000.00. We cannot be
certain that we have identified the problems involved until the analysis is complete. It
may be necessary to conduct more tests after submission of the report, in which case,
the costs for testing will be in addition to estimates included in this document.
Funds expended and billed for this project through April 30, 1978 amount to $7,374.25,
which amounts to $874.25 over the original authorized estimate of $6,500.00. Additional
estimated funds needed for comp!etion of analysis and report ($2,000.00) bring the total
to $2,874.25 over the authorized expenditure. This is considerably less than the cost of
extra work which amounted to $4,657.00.
K -3A LINE - CHARLES HILL
In our letter dated August 25, 1978, we explained that work on this project had been
deferred waiting corrective action by BARTD. To date, we have expended a total of
0 0
CCCSD -3- September 26, 1978
$296.85 for preliminary consultation in designing test facilities in preparation for
testing. This leaves a balance of $4,703.15 from the authorized amount of $5,000.00.
The original estimate was based upon our Fee Schedule which was effective
September 1, 1974. The 1978 Fee Schedule, which is presently being considered along
with an extension of the consulting agreement, represents an average 40 percent
increase over 1974 rates. Therefore, an additional $2,000.00 over and above that which
was previously authorized will be required to complete work originally planned and
estimated.
MISCELLANEOUS PROJECTS
The original estimate for this project was set at $2,500.00 since actual work to be
performed could not be delineated, and a reasonable estimate could not be provided. The
only work which was known when the original proposal was submitted included a
corrosion investigation of the Port Chicago and Bates Avenue Pump Stations. This work
was completed in July 1977 for a total cost of $1,693.36.
PURCHASE ORDER NO. 33920E
The referenced purchase order, dated September 16, 1977, authorized work for design of
cathodic protection and checkout and adjustment of the completed system to be
installed by District forces. In our letter of August 25, 1973, we mistakenly referred to
this purchase order as work for the N.G. Pipeline. The estimate for this work, included in
our report "Corrosion Investigation - Naval Weapons Pumping Stations" dated July 1977,
included an estimate of $2,200.00 for engineering design and $500.00 for checkout and
adjustment. However, costs for design amounted to a total of $2,692.66, which exceeded
the design estimate of $2,200.00 by $492.66. The amount of work involved in completing
design involved more than we originally anticipated. Since the installation is presently
being completed by District forces, checkout and adjustment has not been completed.
Since authrrized funds for this project have been depleted, additional funds in the
amount of $600.00 will be required to complete the checkout and adjustment.
E0
EFFECTIVE 1/1/ 78 (415) 847-2954
A. PERSONNEL CHARGES
PROFESSIONAL SERVICES
Principal
Senior Engineer
Corrosion Engineers
TECHNICAL SERVICES
Technician
Drafting
Clerical
LITIGATION
Court Appearance
Deposition
FEE SCHEDULE
RATE PER HOUR
$ 45.00
39.00
34.00
20.00
16.00
12.00
RATE PER DAY
$500.00 (Min.)
500.00 (Min.)
a
ONE -HALF DAY
a
$250.00 (Min.) o
$250.00 (Min.) 07
0
B, MISCELLANEOUS CHARGES - The following expenses will be invoiced :0
at cost:
c�
1. Commercial Transportation >
r
2. Personal or Company -owned vehicle at sixteen cents ($.16) o
per mile, portal -to- portal
3. Lodging and subsistence when outside home office city
4. Required reproduction of all necessary documents
5. Necessary toll telephone calls, telegraph, postage and
shipping charnes oR
r0
C. SPECIAL SERVICES - Authorized special services and equipment
applicable to work which differs from items normally furnished
will be invoiced at cost plus ten percent (100), including:
1. Specialized equipment and instrumentation
2. outside consultants
3. Civil surveying, soil borings, and laboratory expense
4. Commercial binding and printing
5. Special stationery, tracing cloth and other drafting
supplies
TERMS OF PAYMENT
Charges will be invoiced monthly at thirty (30) days net. An
interest rate of 1 -1/2 percent per month will be charged on
overdue accounts.
tA
Q +t' 0
Z
as
Pt
VII. NB
3
10/19/78
September 13, 1978
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: AUTHORIZATION FOR PARCELS, P.A. 78-51 LAFAYETTE AREA,
P.A. 78 -52 CONCORD AREA, P.A. 78 -53 WALNUT CREEK AREA,
TO BE INCLUDED IN PENDING ANNEXATION TO THE DISTRICT
yea
\o c ease
P<
78 -51 I LAF IYes 1 6.05
�o•
5
OK eg o0
Q�41,�Pa q ",,
GAYE GIRDLER
1620 BIRD ST.
DROVILLE, CA 95965
167 - 130- 23(Dtn)
78-52 CON Yes 1.21 DAWSON & GAFFNEY
P.O. BOX 5190
CONCORD, CA
110 - 120 -52
78 -53 W.C. Yes 4.13 ELVIN B. LIEN
490 LUNADA LANE
WALNUT CREEK, CA
188- 320 -006
Board Action
a
KIN
e
SEPTIC TANK FAILED.
COUNTY ORDERED ABATEMENT
PROPERTY OWNERS HAVE CON-
STRUCTED NEW BUILDING AND
MUST CONNECT TO THE DISTRI
SYSTEM
PROPOSED SUB. 5198- 6 LOTS.
NEGATIVE DECLARATION AND
PRELIMINARY APPROVAL BY
C.C.000NTY
RECOMMENDATION: Authorize Parcels 78 -51, 78 -52 and 78 -53 to be included in
pending annexation to the District.
Respectfully ubmitted,
14. C. Dalton
Deputy
General Manager -Chief Engineer
WCD:WG:sf
Recommendation Approved:
Roger J. Dolan
General Manager -Chief Engineer
0
MEMORANDUM FOR: HONORABLE
VIA: Roger J.
SUBJECT: AUTHORIZE
TO RONALD
j'"�, VII. NB
',,,0 2
10/19/78
October 12, 1978
MEMBERS OF THE BOARD OF DIRECTORS
Dolan, General Manager -Chief Engineer
EXECUTION AND RECORDING OF QUITCLAIM DEED
R. OGG, ET AL - JOB 2645 - PARCEL 3B - ORINDA AREA
ISSUE: The property owners have requested this quitclaim which will permit
them to install a redwood deck and other improvements within the area of
our existing easement.
BACKGROUND: The subject easement was created to provide future sewer service
to properties south of Longridge Road.
This easement is no longer required because a replacement easement was granted
to this District and recorded on October 10, 1978.
The property owners have paid the required processing fee.
RECOMMENDATION: Approval. Adopt Resolution, execute Quitclaim Deed and
authorize its recording.
Respectfully submitted,
4•
Jay S. McCoy
JSM:WG:sf
Reviewed By:
r
W. C. Dalton
Deputy
General Manager -Chief Engineer
A da n pproved:
Tan