August 31, 1978
EN
MEMORANDUM FOR: HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: AWARD PURCHASE OF 1800 KVA AUTO TRANSFORMER
Issue: The Board has previously recognized the need for an emergency
power supply system at the plantsite; and on June 15, 1978, the Board
authorized $25,000 as initial funding for this system.
Background: An 1800 KVA Auto Transformer will be part of the emergency
power supply system. The supply of the 1800 KVA Auto Transformer was
advertised for public bid, and four bids were received. These bids were
opened at a public bid ovening on August 21, 1978. The low bidder is
McGraw Edison Co. with a bid of $14,134.
Recommendation: Purchase the 1800 KVA Auto Transformer from McGraw
Eidson Co. for $14,134 conditional upon receiving SWRCB approval.
Respectfully submitted,
K. Barker
KB:sl Construction Division Manager
Recommendation proved:
r
RoA�jolan
General Manager -Chief Engineer
CENTRAL �GONTRA COSTA SAI441ARY DISTRICT
J O B Stage 5B- -Phase I
LOCATION Treatment Plant
DATE August 21, 1978
ENGR. EST. $15,000
BIDDER
NAME
ADDRESS
BID PRICE
PHONE
McGraw Edison Co
c/o Artwell Electric Co.
P. 0. Box 1301
$14,134.00
Burlingame, CA 94010
347 -9804
R. E. Uptegraff
c/o Garland Affolter Eng.
58 Sutter St.
Corp.
$14,614.00
San Francisco, CA 94104
397 -1800
Pacific Electrical Supply,
Inc.
1906 Republic Ave.
San Leandro, CA 94577
$14,880.00
483 -0931
Fontaine Engineering Sales
Co.
P. 0. Box 6
Belmont, CA 94002
$15,645.00 •
592 -5853
jOB Stage 5B - Phase I BY Jack Case DATE_ 8/21 /78
CHKD. BY D. Gall as her _ DATE -8/21 /78 SHErT NO. 1 OF— 1 _�
I . 1 0
August 31, 1978
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: AWARD OF CONTRACT FOR DISTRICT SEWERING PROJECT 2981,
STEWART AVENUE, W.S. 29 SO. SEWERS, AND AUTHORIZE
THE CONSTRUCTION ACCOUNT.
BACKGROUND: The Board authorized staff to advertise DSP 2981 for bids
7-13-78 and such were received 8- 30 -78. Engineering Department staff has
reviewed and checked bids submitted from three contractors and the firm of
Peter Cole Jensen, Inc., is the apparent low bidder at $88,752.00 (see
attached tabulation).
District staff estimated the cost of the work under contract at $94,830.00
in July 1978 and a total Project cost of $130,530.00. Including the low
bid received of $88,752.00 (6.5% under that estimated), the revised total
estimated project cost is $117,367.00 or 9% under that estimated prior to
receiving bids.
An amount of $10,000.00 was previously authorized on 12- 15 -77. $107,367.00
additional funds are necessary to complete the project.
RECOMMENDATION: Award contract for the construction of DSP 2981 to Peter
Cole Jensen, Inc., and authorize the amount of $)07,367.00 to cover the
balance required for the contract, construction contingencies and incidentals
and street resurfacing.
Respectfully submitted,
A.
Jay 5. McCoy
Collection System Engineering
and Services Division Manager
JSM:DLS:sf
Attachment
Reco e Approved:
oger 14
Generar -Chief Engineer
` CENTRAL ._:OwTRA COSTA SAIC�ARY DIS'T'RICT
JOB DISTRICT SEWERING PROJECT 2931
LOCATION STE14ART AVENUE
DATE AUGUST 30, 1978
E N G R. EST. 11','10-00
BIDDER
NAME
ADDRESS
PHONE
BID PRICE
PETER COLE JENSEN, INC.
P. 0. Box 553
Danville, CA 94526 (415) 837-7600
$88,752.00
D.C.M. CONSTRUCTION
1601 Cherry Avenue
Auburn, CA 95603
(916)885-4539
$117,774.00
MOUNTAIN CONSTRUCTION,
P. 0. Box 116
San Ramon, CA 94583
INC.
(415) 837 -1101
$127,537.00
JOB
BY
CHKD. BY DATF—.— ___ SHEET N0.
DA'r - U/30/78
1
O F— —
C) Q
August 31, 1978
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: CLAIMS ADMINISTRATION FUNDING, 5A -I and 5A -II PROJECTS
ISSUE: In the establishment of a Construction Engineering Division,
a major assignment was the claims administration including litigation
support connected with on -going incomplete projects. This activity is
a construction cost,and accounts and funding approvals are required.
BACKGROUND: The Construction Division funding is almost entirely
project - oriented, although there will be some 0 &M charges when assisting
other Divisions or when a project has not received construction approval.
To channel the costs of this Division into proper cost centers, new
accounts and funding are needed. Attached is an estimate from Ken Barker
for claims administration costs for fiscal year 1978 -79. From this, we
propose two new accounts with funding as recommended below.
RECOMMENDATION:
Project
5A -I
5A -II
WCD: jv
attachment
Acct. No. Description
2010.1.6 Claims Administration
2010.2.6 Claims Administration
Recommendati n A proved:
Roger' J� olan
General Manager -Chief Engineer
Total
Respectfully submitted,
Authorization Request
$ 125,000
36,000
$ 161,000
W. C. Dalton
Deputy
General Manager -Chief Engineer
0 0
CENTRAL CONTRA COSTA SANITARY DISTRICT
CONSTRUCTION DIVISION
ESTIMATE OF COSTS FOR CLAIMS ADMINISTRATION
July 1, 1978 - July 1, 1979
K. Barker
33%
of
time
= $ 15,000
J. Case
33%
of
time
= 10,000
Project Secretary
33%
of
time
= 6,000
Claims Analyst Senior
100%
of
time
= 30,000
Claims Analysts (2)
100%
of
time
50,000
Filing Clerks (2)
100%
of
time
= 30,000
Allowance for supplies and consumables = 15,000
Allowance for travel for depositions = 5,000
and document searches
Total = $161,000
c c.
August 31, 1978
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: DISTRICT ANNEXATION NO. 60
PROBLEM: To fully process this annual annexation and get the properties on
the District tax roll for the next year, it is necessary to begin the
process this month.
BACKGROUND: District Annexation No. 60 is (1) the accumulation of
properties which have requested annexation and have been approved for
annexation by the Board of Directors over the past year, and (2) properties
which, during our Environmental Quality Charge survey, were discovered to
be connected to the sewer system, but outside of the Sanitary District
boundaries. These served properties have all paid proper fees and charges
at the time of connection, but for some reason were not included in previous
annexations. On the basis that they have all requested service and paid
fees, we regard them as having previously provided written consent to
annexation.
RECOMMENDATIONS: (1) Adopt Resolution making a Negative Declaration and
Providing for Notice Thereof, September 7, 1978
(2) Adopt Resolution of Application for District
Annexation No. 60 ,August 31, 1978
Respectfully su i ted,
W. C. Dalton
Deputy
General Manager -Chief Engineer
WCD:sf
Recommendation Approved:
Roge J. olan
General Manager -Chief Engineer
g-31,-78/
August 30, 1978
MEMORANDUM FOR: HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: AUTHORIZATION OF $16,527.74 FROM THE FIELD MODIFICATION
APPROVAL OF NOVEMBER 15, 1977 FOR THE PURCHASE OF A
50H.P. MOYNO PUMP AS A STANDBY UNIT IN THE SOLIDS
CONDITIONING BUILDING
Issue: The temporary sludge pumping facility for the solids handling
bu Is ding does not have a backup system.
Background: A change order was processed to provide for a temporary
sludge andling facility consisting of a vari -drive Moyno pump unit and
appurtenant piping. It was intended that this unit suffice for initial
plant startup and emergency upset con0itions which may occur later.
Since the Contractor has failed to complete the contractual work in the
solids conditioning building in a timely manner, an additional backup
unit is required. It appears that this system of sludge disposal will
be required for several more months.
Recommendation: Authorization of $16,527.74 from the field modification
approval of ovember 15, 1977 for the purchase of a 50 H.P. Moyno pump.
DGN:mg
Reco ndation A proved:
Roger J. D Ian
General Manager -Chief Engineer
Respectfully submitted,,
D. G. Niles J
Manger, Plant Operations
August 29, 1978
MEMORANDUM FOR: THE HONORABLE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: AUTHORIZATION OF $332,000 FOR STAGE 5A PHASE I
CONSTRUCTION MANAGEMENT ACCOUNT NO. 2010.1
ISSUE: The Stage 5A Phase I Water Pollution Control /Reclamation
facility construction project requires additional authorization for
Construction Administration.
q -3f - -7 �/
BACKGROUND: The Stage 5A Phase I Construction Project has received
a total authorization of $628,960 to provide for District expenses in
the construction of this project. It is over expended by $132,000 as
of July, 1978.
The anticipated completion date of February 10, 1978, has not
been met by the Contractor, and it is anticipated that District parti-
cipation will be required through June 30, 1979• The projected cost
to the District, including overhead, is $16,239 per month. These are
allowable costs for grant participation pursuant to the maintenance
of records showing the basis for such charges including necessary time
records and other substantiating data and acceptance by the Environmental
Protection Agency and the State.
RECOMMENDATION: Authorization of $332,000 for Stage 5A Phase I
Construction Management Account No. 2010.1.
Respectfully submitted
D. G. Niles
Manager, Plant Operations
DGN :mm
Reviewed by:
W. C. Dalton
Deputy General Manager -Chief Engineer
Recommendation approved:
U
oger . Dol n
General Manager -Chief Engineer
0
DAccount 2010.1 (DE)
DISTRICT EXPENSES FOR 5A, PHASE I CONSTRUCTION
ESTIMATED DISTRICT EXPENSES FOR THE 1978 -79 FISCAL YEAR
(12 mo.) (10,715 /mo.) = 128,580
36% overhead 46,289
Total labor cost 174,869
miscellaneous supplies 20,000
Total cost $194,869
say $200,000
% Time
Manager, Plant Operations
$3292
50
$1646
Construction Manager
2820
33
930
Senior Engineer
2685
100
2685
Associate Engineer
2385
33
787
Civil Engineering Associate
2116
100
2116
Engineering Aid lI
1551
100
1551
Clerk
1000
100
1000
Total Monthly Salary Cost
$15,849
$10,715
ESTIMATED DISTRICT EXPENSES FOR THE 1978 -79 FISCAL YEAR
(12 mo.) (10,715 /mo.) = 128,580
36% overhead 46,289
Total labor cost 174,869
miscellaneous supplies 20,000
Total cost $194,869
say $200,000
August 29, 1978
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
FROM: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: REPORT ON FURNACE DRY SCRUBBER (5A, PHASE I)
Attached are copies of three descriptive drawings showing the
drying scrubber which has been installed to clean up the off gases
from the furnaces constructed under Stage 5A, Phase I.
A slide presentation has been prepared and will be presented at
the board meeting on August 31, 1978.
Respectfully submitted,
Roger 4Da
General Manager -Chief Engineer
RJD:jv
attachments
vY. os
3
8/31/78
1 lr t ` � ! �! 1. � Dry � I ♦ .:
1 \ _.. E - -- - �"'i i •9+ ) 41: -r •.tire.• — "�..._
�.rC � � f, r/ �- - (:3'.?IYHP•! � -: i.-.. , - � THC,4 ; EXH•+U: i
1 i
1 I
L
I
d,
1
l J
/WAV, au G /4<r
+.yob -aU EdCh
- -- aE L.I31=LY
IJ
PCATFX AI EL /?Z JO— - -- __ — - --T
_ - FcANG RIP - -- �`_ -U "SY ✓391— .� � �r �r . —� - - -- -- �1� -,t�
\'� fOR CON? SELr M734 ! U..IDs�R•r
3 M7812 � B 7r7 ✓ �
13 v n om
'CSTA SANITARY DISTRICT SOLIDS CONDIT'ON NG 9UIl.D!NG SHEET NUMBER ORAVf fk NUMBER
�TiON PLANT —STAGE 5A SECT ION 222 366 M 735
A ER
STANDARD
serles
rccD )
... a standardized large tube unit designed to handle your
toughest collection problems. Its versatility affords
maximum efficiency in applications:
fo- clinker cao ink r r,:. kiln ex'iz :, •s • xz -.sr _ .. , ;i _,n� It
• fur coke dust ceil4.ticn • rz. cc: c.n. �+; c. • , e•
ass.e "7. ...
i. st _;,ncenir:a :ia i; � i • a•: s '. - -
"0:" ?Ts Ere Cilti'c
Dust -laden gas enters the un,:t horizcr.tally and is channelled into the inlet
tubes by the pitch of the tuaesheet. As the gas passes through the helical
spinner vanes at the top of the inlet tubes, it is forced !nto a spinning action
which exerts centrifugal force or the dust particles. The centrifugal force,
combined with natural gravitational forces, hods the dust against the inlet
tube wz;l as it spr,ns dowrlwarl and completes the separation of entrained
dust from the ,;a-. As a result cf the cyclonic action, a vortex s fermeu
the area :m-ier a'ely be'ow the lower and of the outlet tube. This action then
craws the cleaned gas upward ; hrough t5e centered oaflet tube while the
dust continues downward I-ta :r.e -)pper. Cleaned gases are then eff•c.ent.y
discharged under modera'e pressure drop.
The optimum pcsrtion-ng and advanced design of the spinner vanes !n the
Series 348 oust - ol:ectc;r not only maintain the efficiencies of a small ^ult
tube collector but offer all of the important advantages inhere ^t in hrger
lure designs. For example. the large 24 -inch diameter inlet tube w•th L -inc:,
diameter dust outlet is essentially self cleaning. This feature minimizes plug-
ging and resultan: tube wear aim, is directly responsible for the reduction
of unit maintenance costs.
two desig:rIs a, --- a,xlable
A choice of two Series 348 designs is offered. The design V is equ;pped with
recovery vanes whic`l serve to increase the collectors capacity in Om per
tube. Design V units are recommended where min m,;m cost is the major
consideration. Design N is a high- ef`ic'ency unit which contains no recovery
vanes and s intended for use where higher- than - normal efficiencies are de-
manded. T`e selection chart and the efficiency nomogram corta:ned herein
include reference lines for both Design V and Design N.
The Series 348 Und employs the bas ; Per crPleS or package construction using a
prefabricated sub assemblies A wale asso'trnenl or standard a-rangements
is offered for wide range of ,ns1a'1 •hors. The roil is furnxshe on factory
assembled s fctfons and segments con von sent for shrpment and f+;d erection.
Outlet Tube Sub- Assembl
Spinner Vanes
P;enu,,n Assembly
Recovery Vane
Net Tube Sub-Assembly
Replaceable Cone
r
.. ,. .n ,.. per +t ; r W"tin— w uff a+t rt AMer an St deed. the .b[ht !
•
Y
0
1
AMERICAN- STANDARD SERIES 348 -A COLLECTOR
INSTALLATION INSTRUCTIONS
WELDED IN OUTLET
REMOVABLE OUTLET TUBE TUBE — STANDARD
WITH GASKET— OPT O
V X*$L I NAi
,�4s� t 4th �� •,,�� \ '
O
N UTLET TUBE SHEETS ' R.H. SIDE SHEET
REMOVABLE SPINNER - OPTIONAL
�,J I ✓
BACK OUTLET
FLANGE
i
r
ROW A
ROW A
r ROW r
L. H
TYPICAL FIELD ASSEMBLY
FIGURE 1
I
�S
ASSEMBLY
CORE ASSEMBLY WITH
WELDED FLIGHTS -- STANDARD
NLET TUBE CONE
TEEL — STANDARD
:AST IRON — OPTIONAL
ER
August 28, 1978
MEMORANDUM FOR: HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: AUTHORIZATION OF$49,932to ACCOUNT NO. 2010.2.0
ISSUE: The account No. 2010.2.0 treatment
requires an additional $49,932 authorization.
BACKGROUND: The Account No. 2010.2.0 was
to provide for District expenses, i.e., salary,
costs during the construction of the 5A, Phase
facilities.
plant construction-5A-11 (DE)
established with $200,068
overhead, and outside vendor
Il filtration - clearwell
This construction is completed with a total expenditure of $215,748
for District expenses through July 1978.
RECOMMENDATION: Authorization of $49,932 to Account No. 2010.2.0
treatment plant construction- 5A- 1l(DE) for a total authorization of $250,000.
Due to continuing delays in activating this project, further District
engineering and start -up expenses may be required, and it is felt that this
account should be maintained until the contract project is in service.
Respectfully submitted,
W. C. Dalton
Deputy General Manager -Chief Engineer
WCD:mm
Aoger Reco ndat io approved:
Do an
General Manager -Chief Engineer
WJ
August 28, 1978
VI. OB
6
8/31/7-1
MEMORANDUM FOR: HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: 5A, PHASE I WATER POLLUTION CONTROL /RECLAMATION
PLANT CONSTRUCTION ACCOUNT NO. 2010.1
Issue: The 5A, Phase I Water Pollution Control /Reclamation Plant construction account
No. 2010.1 requires additional authorizations and accounts to improve fiscal control.
Background: The Account No. 2010.1 established to provide funds for District expenses
for the construction of the 5A, Phase I project, requires additional authorizations to fund
future District expenses through June 30, 1979. These additional funds requested are as
follows and are further supported through attached memorandums:
ACCT.NO. ACCOUNT DESCRIPTION
2010.1 Treatment Plant Construction -5A -I (DE)
1.6 Claims Administration
AUTHOR-
IZATIONS $REQUESTED
628,960
0
332,000
125,000
Recommendation: Board authorization of additional funds and accounts as listed.
Respectfully submitted,
W. C. Dalton
Deputy General Manager -Chief Engineer
WCD:jf
Recommendation Approved:
Roger�- Wolan
General Manager -Chief Engineer
E*
August 28, 1978
MEMORANDUM FOR: HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager - -Chief Engineer
SUBJECT: 5A, Phase II WATER POLLUTION CONTROL /RECLAMATION PLANT
CONSTRUCTION ACCOUNT NO. 2010.2
ISSUE: The 5A, Phase II Water Pollution Control /Reclamation Plant
Construction Account No. 2010.2 requires additional authorizations and
accounts to improve fiscal control.
BACKGROUND: The Account No. 2010.2 established to provide funds
for the District expenses for the construction of the 5A, Phase II project,
requires additional authorization to fund future District expenses through
June 30, 1979. These additonal funds requested are as follows and are
further supported through attached memoranda:
Description
2010.2 TREATMENT PLANT CONSTRUCTION - 5A -II (DE)
2.6 CLAIMS ADMINISTRATION
Authorization
$ Requested
200,068 49,932
36,000
The request for account 2010.2.1 is the amount needed to bring it to
the July level of expenditure. Please refer to the memo on account 2010.1.6
for the division and total of litigation support for 5A -I and 5A -II.
RECOMMENDATION: Board authorization of requested amounts and new
account.
Respectfully submitted,
L
W. C. Dalton
Deputy
General Manager -Chief Engineer
WCD : j v
attachment
Reco en?an on approved:
Roge J. an
General ger -Chief Engineer
N
August 28, 1978
VII. NB
3
8/31/78
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: EXECUTE CONSENT TO EXECUTION OF DEED FOR PUBLIC ROAD
PURPOSES TO COUNTY
No. Job No.
1 1597/64
JSM:WG:sf
Tract No. Area
M.S. 241 -77 Alamo
Remarks
Short form, District retains prior
easement rights. No cost to
District
This item was previously executed
as a "Consent to Dedication ".
The Board should rescind original
Resolution No. 78 -235, and adopt
new Resolution.
Respectfully submitted,
Jay S. McCoy
Collection System Engineering
and Services Division Manager
App r ved:
Roger D an
General M alter -Chief Engineer
Vet. NB
2
8/31/78
August 28, 1978
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: EXECUTE CONSENT TO DEDICATION TO COUNTY FOR PUBLIC ROAD
No. Job No. Tract No. Area Remarks
1. 551 5332 Walnut Creek Short form, District retains
prior easement rights. No
cost to District
Respe fully submitted,
Jay S. McCoy
Collection System Engineering
and Services Division Manager
JSM:WG:sf
Approved:
L
oger J. D )an
General Manager -Chief Engineer
August 25, 1978
VII. NB
4
8/31/78
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: AUTHORIZATION FOR FOUR PARCELS, P.A. I8-38 WALNUT CREEK
AREA, P.A. 78 -39 LAFAYETTE AREA, P.A. 78 -40 ORINDA AREA,
P.A. 78 -41 ALAMO AREA, AND P.A. I8-42 ALAMO AREA, TO BE
INCLUDED IN PENDING ANNEXATIONS TO THE DISTRICT
+a
G o\
Pt` Qa< �a
Pt
v�
�o•
g5 \
QatGe
Board Action
a
O� `�5 G� 2
\N
PJ'cr
78-38
W.C.
Yes
1.07
LISBOA DEV. CORP.
OWNER PLANS TO BUILD 3 SINGLE
P.O. BOX 2252
FAMILY HOMES. PLANS & MAP
Walnut Creek, CA
APPROVED BY COUNTY
139 -071 -014
18 -39
LAF.
Yes
.61
DAYTON E. GERANEN
OWNER PLANS TO CONSTRUCT ON
3539 'A' SPRINGHILL RD
SINGLE FAMILY RESIDENCE
LAFAYETTE, CA
231- 070 -07
'8 -40
ORIND
Yes
.32
K. M. THOMAS
EXISTING HOUSE. OWNER WOUL
364 EL TOYONAL
LIKE TO CONNECT TO SEWERS
ORINDA, CA
WHEN AVAILABLE
264- 092 -002
18 -41
ALAMO
Yes
2.7
ELBACO, INC.
OWNER PLANS TO BUILD 4 SINGLE
P. 0. BOX 415
FAMILY HOMES. PRELIMINARY PLANS
DANVILLE, CA 94526
APPROVED BY THE COUNTY.
193 - 262-12, 13 -17
18 -42
ALAMO
Yes
40
CONTRA COSTA COUNTY
PARCEL IS A COUNTY PARK. THE
ADMINISTRATION BLDG
PARK WILL HAVE RESTROOMS WHICH
MARTINEZ, CA
WILL BE READY TO CONNECT TO
DISTRICT SEWERS VERY SOON.
RECOMMENDATION: Authorize Parcels 78-38, 78 -39, 78 -40, 78 -41 and 78 -42
to be included in pending annexations to the District.
Respectfully submitted,
oeoAiE�::
W. C. Dalton
Deputy
General Manager -Chief Engineer
WCD:WG:sf
Re enVh A roved:
roger J. Gene 1 r -Chief Engineer
C
August 23, 1978
C
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: APPROVAL OF LETTER OF CONFIRMATION OF PROPOSED ANNEXATIONS
ISSUE: It is necessary to confirm with owners the fact that annexation
of their property has been approved and at the same time explain possible
limits on connections.
BACKGROUND: This subject has been discussed at previous Board meetings.
The attached letter has been drafted for your review and approval.
RECOMMENDATION: Approval of letter of confirmation of proposed annexation.
JSM :sf
by:
_i_�
J. to
District Counsel
Attachment
Respectfully submitted,
Jay S. McCoy
Collection System Engineering
and Services Division Manager
Reviewed by:
WOQ&9z�'
W. C. Dalton
Deputy
General Manager -Chief Engineer
Recommendati Approved:
&ed
D 11a4
General Manager -Chief Engines
VII. NB
6
8/31/7E
August 3, 1978
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: AtrrHORIZE $539.00 FOR THE 1978 AMERICAN CONGRESS ON
SURVEYING AND MAPPING TECHNICAL MEETING IN ALBUQUERQUE,
NEW MEXICO
ISSUE: As part of Wendle Whipple's active membership in the American
Congress on Surveying and Mapping and as District representative to
the East Bay Council on Surveying and Mapping, an affiliate of ACSM,
it is appropriate that he attend this meeting.
BACKGROUND: The District has been a participating member of the East
Bay Council on Surveying and Mapping since its instigation in 1952. This
is a nonfunded organization through which the basis for our system
mapping program was established. Currently a cooperative program for
a digitized mapping system or a mapping data base accessible to all
East Bay Surveying organizations is under study. Wendle Whipple is a
delegate from East Bay Council on Surveying and Mapping to the Meeting
in Albquerque. The funding for this meeting was included in the 1.978 -79
budget.
RECOMMENDATION: Authorize Wendle Whipple to attend conference.
Registration $40.00
5 days at $44 220.00
Transportation 279.00
$539.00
Respectfully submitted,
4iy!-
McCo /4
Collection System Engineering
and Services Division Manager
JSM:sf
Reviewed b
W. C. Dalton
Deputy
General Manager - -Chief Engineer
Reco end Approval:
Roger J. Ian
General Manager -Chief Engineer