HomeMy WebLinkAboutAGENDA BACKUP 04-06-1978April 4, 1978
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
FROM: John J. Carniato, Counsel for the District
SUBJECT: BAY AREA AIR POLLUTION CONTROL DISTRICT VIOLATIONS,
NOTICES NOS. 6648 & 6649
ISSUE: Central Contra Costa Sanitary District Violation Notices
Nos. 6648 dated November 24, 1977 and 6648 dated December 1, 1977.
RECOMMENDATION: After investigation, it appears the violations
are accurate and t Is Counsel's recommendation that compromise fines
be paid and made a part of our claim against the contractor. There
are early indications that the violations result from malfunctioning
of equipment due to contractor's error. / 1
Rep"tful llsu i tad,
arnfdto
s 1 for the District
JJC:jv
-
April 3, 1978
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: AUTHORIZATION FOR ONE PARCEL, P.A. 78 -17 WALNUT CREEK
AREA TO BE INCLUDED IN PENDING ANNEXATION TO THE DISTRICT
0 moo.
Q ice
eID
e6
`0r �e
a
Qec �G�e
�o•
5
O`t'�Paat QatGe\
e
V1I. NB
1
4/6/78
Board Action
a
try of N , 0
XP \1
P G pe
78 -17
W.C.
YES
5.74
Boundary IV Partnership
Proposed Subd. 4984
433 California St.
Approved plan and Negative
San Francisco, CA 95104
Declaration by the City of
135 - 050 --15
Walnut Creek.
RECOMMENDATION: Authorize Parcel 78 -17 to be IncI.uded in pending annexation
to the District.
Respectfully submitted,
W. C. Dalton
Deputy
General Manager -Chief Engineer
WCD:WG:sf
Recommendation Approved:
Roger J. Dolan
General Manager -Chief Engineer
1 -
0 VI. OB
2
4/6/78
April 3, 1978
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: FINANCIAL PLAN UPDATE
ISSUE: To complete project application forms for 5B -I (and possibly
5B -II, Stage I), it will be necessary to have a current Financial
Plan.
BACKGROUND: The last revision of the Financial Plan was July 1, 1977.
Since then, we have received the annual audit, and a number of changes
in project planning have occurred. Further revision will be necessary
after receipt of the 1977 -78 audit and possibly after the election, and
after project grant contract execution.
This particular revision assumes that the Jarvis -Gann Initiative
does not pass, that grants will not be forthcoming after the 5B -II,
Stage I project, and that short term borrowing (30 months) will be
necessary by 1986.
RECOMMENDATION: Review and adopt the April 6, 1978 Financial Plan for
use until the June 6, 1978 election results are analysed.
WCD :jv
Ap roved:
Rog J. Dolan
General anager -Chief Engineer
Respectfully submitted,
W
W. C. Dalton
Deputy
General Manager -Chief Engineer
f
J J. CAitNIATU ANTRAL- CONTRA COS
Counsel I'm rle District SANITARY DISTRICT
Tel. 939- 5330
CLYDE M. liUPliiNS
12S0 SPR INGBROOK ROAD
Secretary MArLING ADDRESS P O BOX 5266
WALNUT GREEK CAL.IFORN A 94596
TEL 934 6727 AREA CODE 415
March 30, 1978
CENTRAL CONTRA COSTA SANITARY DISTRICT
Financial Plan
ROGER J. DOLAN
General Manager -Chief Engineer
W. C. DALTON
Deputy
General M:ulager -Chief Engineer
Notes to supplement Financial Plan dated April 4, 1978. Refer to line
numbers on left margin of chart.
Under wastewater capital improvements, Treatment Plant, the grant % for
projects as listed is net to allow for ineligible items. Treatment Plant
includes disposal (outfall) and all reclamation and energy recovery works.
1. Grant Project complete. The 1978-79 work is for re- grading and restoration
for areas used for supernatant ponding and construction borrow and fill.
The 1981 -82 work is for levee reinforcement, and work after that date will
be general upgrading.
2. Project approximately 99% complete and will provide 40 MGD primary and 30
MGD advanced treatment including nitrification and denitrification.
(Pending estimated claims and lawsuits are included in 1979 -80 costs.)
3. Project complete. (Five hundred forty -five (545) thousand $ in 1972 -73
is engineering by Bechtel, Inc., which was included in Phase I and for
which grant funds have been received under Phase I.) Provides 30 MGD
water reclamation including filters and terminal storage reservoir. A
second contract completed certain items. (Pending estimated claims and
law suits are included in 1979 -80.)
4. Stage 5B, Phase I project to bring secondary treatment capability to 40
MGD. E1R /EIS hearing was held September 30, 1976 for entire 5B project.
5. Stage 5B, Phase 11 is the solid waste energy recovery project substituting
RDF for natural gas or fuel oil in the existing sewage solids conditioning
process. It involves a front -end solid waste processing plant, RDF storage
and transportation, and modifications to furnaces.
� - Recycled Paper
Financial Plan
2
6. Stage 5B, Phase III is the second stage of the solid waste energy recovery
project which will include expansion of the front -end solid waste plant
and of the thermal energy conversion units to provide additional power
for the water reclamation plant.
7. Stage 6 project is planned to expand the treatment plant capacity to the
next logical stage, and the reclamation plant capacity to the demand level
for reclaimed water. Although no grant funds are anticipated for this
project, there is a possibility that State and Federal laws may be changed.
Under present regulations, planning must begin when 75% of capacity is
reached. Projections indicate that this expansion must be In service in
the mid-- 1980's.
8. Miscellaneous plant improvement projects include alterations to the out -
fall and plant site as well as interval upgrading of various plant elements.
9. Line E (1974 -75 expenditure) may require minor improvements covered under
Miscellaneous. Watershed 23 requires two major paralleling projects, the
first is under contract.
10. Line G (Watershed 33) is the major trunk line problem facing the District
and planning is under way. Uncertainties about population distribution
and density in the service area make it advisable to delay construction
and pipe sizing as long as practical, but it is necessary to establish
alignment and secure certain rights of way in the near future. It may be
necessary to construct segments between Walnut Creek and Danville in
advance of actual need in order to take advantage of cooperative project
planning with the City of Walnut Creek and the County Flood Control District.
Recent forecasts for WS 33 indicate a substantial population reduction from
previous planning studies. The 1977 -78 project is for paralleling on the
San Ramon summit area, and is under contract. As watershed charges are
collected, paralleling from the summit to Danville is planned.
11. Miscellaneous trunk sewer projects are shown followed by improvements
to capacities of pumping stations and force mains to Line M (Martinez
Trunk). The possible future use of this facility by the Mt. View Sanitary
District is too speculative to permit planning at this time.
12. Bollinger Canyon pipeline to eliminate or extend the existing leach field
was approved for Step I grants funding but declared ineligible for construc-
tion . The capacity problem during wet weather is under study and will be
corrected.
13. Provision for advancement of funds for secondary watershed trunk construction
is made in the next few years. Recoveries from previous advances and
collections of watershed charges are expected to offset these expenditures.
Financial Plan 3
14. Funding is provided for structure sealing and system improvement to
improve operation of the collection system and to reduce maintenance
costs and infiltration /inflow.
15. Only limited Local lmprovment District work is planned in the future
primarily where public health problems exist. A reversion to the 1911
or straight 1913 State Improvement Acts would eliminate District funding
involvement (aside from preliminary engineering and planning).
16. Funding for miscellaneous improvements to the collection system by District
forces to supplement contract work under Line 14 above and reimbursable
work performed for other agencies. The proposed office is included in 1978 -79.
17. & 18. These are the fixed bond service obligations of the District, and the
G.O. issues are covered by a special tax rate.
19. It may be necessary to borrow on a short -term basis to provide cash -flow
funding. See 1987 -90.
19. A. Repayment of Federal funds by and for industrial users. This section of
the Federal regulations has been suspended for further study.
20. Sewage collection costs are estimated to cover inflation (and growth to
198o-81).
21. Sewage treatment costs are based on estimates from Brown and Caldwell for
1977 -78 to 1981 -82. 1981 -82 reflects lowered fuel costs which are
considered to offset other increases, as does 1984 -85 when the second
resource recovery project is complete.
22. Provisions are made for increased future maintenance of the outfall.
23. Engineering was assumed to stabilize activities and costs are increased
with inflation.
24. Administration was increased for inflation and growth to 1980 -81 and for
inflation after that.
25. General, which includes employee benefits and other basic District over-
head items, is increased to match inflation and growth to 1980 -81 and at
the inflation rate thereafter.
26. The Environmental Quality Charges (sewer service charge) is based on present
State and Federal regulation. The amount must at least equal the Operation
and Maintenance and replacement costs of the District. In our case, this
would be the total 0 & M expenditure less the payment by Concord for its
share of treatment, disposal and overhead costs of the District.
Financial Plan
4
27. The present special service charges were phased out with the implementation
of the full sewer service charge in 1977 -78 (Line 26) and the industrial
cost recovery revenue is substituted thereafter on this line.
28. The major revenue under Service Contracts will be payment by Concord for
operational costs for treatment and disposal of their sewage (33% of
Lines 21 + 22 - Line 31 + 15% for overhead).
29. Property taxes for 0 & M (Running Expense) were phased out when the full
service charge became effective.
30. 0 E M Revenues & Recoveries have been held at a level lower than their
recent average to reflect less activity in local improvement districts,
building and miscellaneous activities.
31. Reclaimed water revenue is based on Water District anticipated sales
and contract guarantees.
32. "Miscellaneous" reflects payments for work performed for other agencies
on a reimbursable basis. Revenues from sale of recovered resources at
front -end solid waste plant as estimated by Brown & Caldwell are not
included in any Expenditure - Revenue calculations.
33• Contract Capital Payments are the payments by the City of Concord for its
share of capital improvements (including G. 0. bonds) at the Treatment
Plant.
Concord Capital Payments ($1,000)
ELOJ ect
to 7 -75 Molding Basins
5A, Phase 1
5A, Phase II
Misc.
75 -76 5A -I
5A -II
Misc.
76 -77 Holding Basins
5A -I
5A -II
5B-11
Misc.
Total Net
Expend. Expend.
827 238
28,570 2,127
1,814 1,814
i,5504
Concord
1,112
1,112
5,977
415
493
Z-,_W5 1 , 694
22,F0C
(53)
276
121
504
605
1,453 357
313
Share
1,106
1,106
962
2 �_09
1 008
3,076
continue...
Financial Plan
Gi
continued...
Total
Net
Project
Expend.
Expend.
Concord
Share
77 -78
5A -1
Est.
817
5A -I1
Est.
27
5B -1
1,235
5B -II
293
Misc.
",372
581
72
3,74V
30 +�$�
78-79
Molding Basins
300
58-1
(174)
5B -I1
204
5B -Ili
600
Misc.
343
5A -1
(983)
5A -11
(694)
—�+0+
(101)
495
39+3
3,643
79 -80
T. P. Fxpenditures
16,530
Grants
12,975
3,555
888
80 -81
T. P. Expenditures
19,800
Grants
16,187
3 -�
903
81 -82
T. P. Expenditures
10,300
Grants
1,575
9,925
2,481
82 -83
et. seg. Concord share at 25% of
Treatment Plant
Expenditures
34. Fixture charge revenue is geared to growth of system and to new Sewer
Service Charge Units at increased fixture charge rates, if necessary.
35. Annexation charge revenue is largely dependent on properties already within
the District which will develop and pay charges at old rates.
36. Refer to lines 17 and 49.
Financial Plan
3
1
37. Property tax revenue (and rate) for capital improvements can be phased
out as adequate capital reserves are accumulated and other sources of
revenue substituted.
38. Recoveries from LID's can be controlled and predicted, but recoveries from
advances to secondary watersheds will depend on the total amounts of such
advances and the rate of development within tributary areas. The overall
watershed program showed a surplus for the first time in 1976 -77.
39. It has been assumed that the District will continue its money management
program
and keep necessary reserves invested.
39A See line
19.
40. Grants received
& anticipated are as follows:
1973-74
1967 T.P. Expansion 0288
$ 113,000
Holding Basin
293,000
Project 5A, Phase 1
8,912,000
9,31 ,000
1974-75
1967 T.P. Expansion 0288
$ 42,100
Holding Basin
295,300
Project 5A, Phase 1
17,471,000
$17,808,400
1975 -76
Project 5A, Phase 1
$12,543,000
Project 5A, Phase II
10 883 000
$23,426,000
1976 -77
Project 880465701
$ 5,000
Project 0288
18,500
Project 5A, Phase 1
6,095,700
Project 5A, Phase II
349,700
Project 5B, Phase 1
0
Project 58, Phase II
169,200
6,638,100
$
1977 -78
Bollinger Canyon & 0288
60,000
1978 -79
Project 5A, Phase 1
$ 983,000
Project 5A, Phase 11
694,000
Project 58, Phase 1
924,000 Step 1 & 2
Project 56, Phase 1
1,750,000 Constr.
Project 513, Phase II
696,000 Step 1
$ 5,0 7,000
continued...
Financial Plan
1979-80 Project
Project
Project
Project
Project
1980 -81 Project
Project
1981-82 Project
Project
5A,
5A,
5B,
5B,
5B,
5B,
5B,
5B ,
5B,
Phase
Phase
Phase
Phase
Phase
Phase
Phase
Phase
Phase
1982 -83 Project 5B, Phase III
1983 -84 Project 5B, Phase III
1984 -85 Project 6
7
EPA @ 75% $ 4,500,000
EPA @ 75% 2,225,000
1,750,000 Constr.
1,500,000 Steps 1 & 2
3,000,000 Constr.
$12,975,000
$ 16,187 Constr.
Steps 1 & 2
1,575 Constr.
Constr.
Constr.
Constr.
Stages 1 & 2
1985 -86 Project 6
1986 -87 Project 6
1987 -88 Project 6
41. Withdrawals from and additions to ( } the Capital Reserve
Funds represent the actual difference between total Expenditures and
total Revenues.
42. thru 47. Except for 43. B. this section of the Plan is awaiting new State Water
Resources Control Board instructions.
42. E 43. This inciudes the accumulation of retained I.C.R. revenue. We are required
to establish a Wastewater Capital Reserve Fund as part of the Grant program.
This fund can substitute for our present Sewer Construction Fund, but it
is desirable to continue the separate Sewer Construction Fund as a Construc-
tion Capital Reserve Fund. For purposes of this Financial Plan, the two
were combined first and then separated to indicate the minimum amount
which must be maintained in the WCRF, 00%) of Line 44, or Line 46) under
present regulations. Concord and CCCWD contracts provide that each agency
will share in and keep available reserves as shown, thus reducing the
amount the Sanitary District must accumulate. (This I.C.R. requirement
has been suspended by EPA, and the SWRCB is working on new Revenue Program
Guidelines.)
N
Financial Plan a
44. The plant values shown begin with audits to 1973 -74, then add the construc-
tion costs as plant increments are completed.
115. One- thirtieth of Line 44.
46. Accumulation of Line 45.
47. Accumulated total cost of treatment facilities to local taxpayers. To
Line 44 is added $2,175,224 for the outfall. The investment of the
City of Concord is not shown separately.
48. Assessed Valuation projections were based on the growth factor and
anticipated inflation after 1977 -78.
49. By law, Assessed Value (Line 48) and fixed bond service costs (Line 17)
establish this rate.
50. The adoption of a sewer service charge, effective for the 1976 -77 fiscal
year, eliminated the tax rate for 0 & M or Running Expense.
51. This plan shows the eventual elimination of the balance of the Running
Expense tax rate used for capitalization. However, in view of financing
uncertainties and pending litigation, a reduced rate should be
continued.
52. Addition of Bond, 0 & M and Capital tax rates.
53. Plant flows for average dry weather condition in million gallons per
day are based on addition of all Concord flow and anticipated rate of
growth for service area with no allowance for wet industry or substantial
change in water use patterns(based on ABAG projections at 103 gpcd).
54. This line reflects water pollution treatment capabilities as planned to
meet projected plant flows.
55. The total annual flow is shown as recorded.
56. Population served is based on 1970 and 1975 census figures and rate of
growth and is related to County Planning Work and ABAG Series 3 projections.
57. The Sewer Service Charge units are the estimated living units of all
types, plus commercial and industrial connections as equivalents.
0
Financial Plan 9
Sewer Service Charge Units
ABAG Family Size projections applied to County and ABAG population with
adjustment for commercial users.
ABAG
1970
County wide
3.22
Danville -San Ramon
3.59
W.C., Concord, P.H.
3.37
Orinda, Laf., Mor.
3.05
1970
3.4
1975
3.3
1980
3.2
1985
3.1
1990
3.0
1995
2.8
2000
2.6
2000
2.59 Persons per living unit
2.67
2.67
2.55
58. The annual Service Charge was estimated by dividing the Service Charge
Unit total into the annual Environmental Quality Charge total.
59. The growth rate of the District was assumed to decrease and stabilize
in 1980 at 2% per year. (Over the past 10 years, annual growth has
averaged 5.25% in added miles of public sewer, 9.07% in increased
average daily plant flow, 4.6% in area of District, and 8.9% in total A-V.)
60. inflation was assumed to decrease to 6% which has been fixed by the
national administration as an acceptable level.
Footnote: These notes and the Financial Plan dated April 6, 1978 are issued
for interim review only and will be updated and corrected after the annual
budget is adopted, and the audit received. Pending changes in the SWRCB
guidelines may affect the format of the next revision.
W. C. Dalton
Deputy
General Manager -Chief Engineer
WC D : rm
3/30/78
April 3, 1978
MEMORANDUM FOR: HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: AUTHORIZATION OF $35,000 FOR OFFICES AND CONFERENCE
ROOMS AT THE WATER POLLUTION CONTROL/RECLAMATION PLANT
Issue: The potential litigation and long term staff requirements will require
office and conference facilities which presently do not exist.
Background: The proposed facilities can be made available at the Water Pollu-
tion Control /Reclamation plant at an approximate cost of $35,000 by utilizing
an unused storage room.
The advantages of converting this storage room are:
I. Provides facilities at the job site
2. Can be implemented quickly
3. Provides office and conference space at a cost of $25 /sq.ft.
4. Facility provides a high level of security
5. Facility can be utilized in the future.
Recommendation: Authorization of $35,000 for additional offices and conference
rooms at the Water Pollution Control /Reclamation plant.
DGN:mg
Reviewed:
W. C. Dalton
Deputy General Manager -Chief Engineer
Approved:
tri,dX Counsel
Respectfully submitted,
D. G. Niles
Manager, Plant Operations
Reviewed:
Roger 7. Do n
General Manager -Chief Engineer
VII. NB
2
4/W71
0
March 6, 1978
N
MEMORANDUM TO: D. G. Niles, Manager, Plant Operations
FROM: Kenneth Barker, Construction Coordinator
SUBJECT: ESTIMATE OF COSTS FOR PROPOSED OFFICES
Attached is an order of magnitude estimate for the
proposed offices in the basement of the administration building.
/. za.�
Kenneth Barker
KB:mg Construction Coordinator
Encl.
N
Order of Magnitude estimate for Converting Storage Room to Offices and Document
Storage
I.
Refurbish storage roar as per attached sketch
Pacific Mechanical Corp. (verbal estimate)
$25,000
2.
Install telephones
$
1,000
3.
Purchase and install paper shredder
$
1,000
4.
Install copying machine
$
500
5.
Furniture and filing cabinets
$
5,000
6.
Miscellaneous
$
1,500
$34,000
to
kk
Q
J
to
kk
Q
-u- harp
do -770,Y
.j u u
-I n
b3ddd
- H`1317 77rj 77Vli /131V
It
VII. N;
4/1,
6
March 28, 1978
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: AUTHORIZE $7,000 TO COVER THE COST OF SEAL COATING VARIOUS
ROADS DISTURBED BY DISTRICT CONSTRUCTION AND MAINTENANCE
PROJECTS
ISSUE: As part of the District's road restoration program, various county,
city and private roads require seal coating to restore surfaces disturbed by
District sewer construction and maintenance projects. A tabulation is
attached.
BACKGROUND: In the past the District has been able to effect a savings by
contracting with the county to perform this work at actual cost during their
annual scheduled seal coating program. Again this year we have requested that
the county include the District work in their scheduled seal coating program.
RECOMMENWHION: Authorize $7,000 to cover the cost of approximately 15,900
sq.yds of seal coating to restore various roads in the District as shown on
the attached tabulation.
Respectfully submitted,
Jack L. Best
Mager- Engineering Department
JLB:RM:sf
Attachment
Reco endation pp ved:
Roge J. Do an
General Manager- -Chief Engineer
n
r-I
d
O
U
w
cn
o�
R.'d Of-QM-,7NNOnOOnOn ri
W W CON OONmN r-I N O n Nww r-{
Crd M wr- ImNCAHC14 ul
H
>C
0 0oOOOOtn0000O0
0
W N.7O Y an C> C) w.D c•'1tom O
00
04 CN .D �7 r-1 Cn -7 1, W �7 N � t�0 to
r-1
nU'1ann.-!•nNNcNCrywcrl
tr1
Qi r-I N N H N
-Y
a r? y-+ H
ri
O
anrnW00Nm 0'T an.DW-1
O
-Apo
4;4.)x-1 3oa
r-i r•i -I U 4j 423
co
H r-4 r-I r-I N U •rl
an C4 C1 ui �i L� oo tv .o an C. Co C4
a
CO Q ED
or-4
r-4 ri
C)
F= O $4 A
a u m a 0 a == p.c
to v: r-)
a) it •14 -r-I •rl p u co U
U cd r-1 .Z
o�
R.'d Of-QM-,7NNOnOOnOn ri
W W CON OONmN r-I N O n Nww r-{
Crd M wr- ImNCAHC14 ul
H
>C
0 0oOOOOtn0000O0
an
W N.7O Y an C> C) w.D c•'1tom O
00
04 CN .D �7 r-1 Cn -7 1, W �7 N � t�0 to
r-1
nU'1ann.-!•nNNcNCrywcrl
tr1
Qi r-I N N H N
-Y
a r? y-+ H
ri
O an - O
• w Oo0CJOOOcn0 N MON an
5C 0 " 0r-0� %O r-i O% f- ODD O c,4 r- rI N
O .D0kn-zranOr -i m mm -:rdU
W cr1Mrlrgr-1N N r-I N rlNNN
W
U O� t70 00 00 %D W w 0 -d' .o -7 00
O O r1 H H r♦ .-A r•I N r-I O O O
itW to Ln Ln Ln Ln �l Ln to Ln Ln Ln Ln v'1
m W m m W m PU m QQ m m Pal m
w r- mcr cn%D%D co%O"mM L1
rW l M Ln M M M M tai M c''1 ri (n ri r-I
W to to Ln N Ln Ln Ln Ln Ln Ln Ln Ln art
04 H " H r-1 " " ,-I ,-I " ri ,-i r-I .-1
.o -:3r %a .o .o n .o an .-{ an .D -It
U W CA I'D CO U U U U w W P�1 Q
N an .O .D .A tD .O .DV Q\
A0 r- INMtr1M.YLn*01-MOt0 -1
co
W
t0 10
4-4 w tH to
10 G
CO co ro w w r?
C: ., I ni
•aaa cd cd
•r1 - 3rro
a r? y-+ H
P t+ + aJ t~
co
zz ►�i3P4 Ur�1
-Apo
4;4.)x-1 3oa
r-i r•i -I U 4j 423
co
H r-4 r-I r-I N U •rl
G f t LI
d, $4 4j -A •ri rl O >
CO Q ED
U A U ,L ,C : ,--I H o
p. W p
O 00 00 aO O al 'O O
F= O $4 A
a u m a 0 a == p.c
to v: r-)
a) it •14 -r-I •rl p u co U
U cd r-1 .Z
� -u
3 a. R.
fwd a. � cc�o
to o 4 �
Ca N cn cn cn FC+ a4 W Ix
a to X ,t.
W:wwtl;w tl:
w
a od td ca td to co al co
• td
w a O a a a a a 41 a
o'.4 o o
I U I I f 11 co I
U l U U
O
.�U-- i•rirl•�•�ri �•��.rjUU
U U C.7 U U U U p. U
U U U U
W
U O� t70 00 00 %D W w 0 -d' .o -7 00
O O r1 H H r♦ .-A r•I N r-I O O O
itW to Ln Ln Ln Ln �l Ln to Ln Ln Ln Ln v'1
m W m m W m PU m QQ m m Pal m
w r- mcr cn%D%D co%O"mM L1
rW l M Ln M M M M tai M c''1 ri (n ri r-I
W to to Ln N Ln Ln Ln Ln Ln Ln Ln Ln art
04 H " H r-1 " " ,-I ,-I " ri ,-i r-I .-1
.o -:3r %a .o .o n .o an .-{ an .D -It
U W CA I'D CO U U U U w W P�1 Q
N an .O .D .A tD .O .DV Q\
A0 r- INMtr1M.YLn*01-MOt0 -1
VI. OB
4J6/78
March 27, 1978
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: APPROVAL OF PLANS AND PROJECT MANUAL (SPECIFICATIONS)
AND AUTHORIZATION TO ADVERTISE FOR BIDS FOR DISTRICT
SEWERING PROJECT 2814, RELOCATION OF THE 39 -INCH LINE
C TRUNK SEWER BETWEEN GRAYSON CREEK AND WALNUT CREEK
CHANNELS TO ACCOMMODATE THE PROPOSED STATE FREEWAY
PACHECO AREA
ISSUE: The State Department of Transportation has requested subject work
and has executed a Utilities AGreement numbered 466.6 in which they agree
to pay all cost of the relocation except for any betterment that we may
derive.
BACKGROUND: We have received notification from the State (letter March 1,
1.978 attached) that right -of -way is clear and that they request our relo-
cation be accomplished prior to the State Freeway construction, estimated
to start late 1978 or early 1979. The job construction is estimated at
$381,240.
RECOMMENDATION: Approve plans and project manual and authorize advertising
for bids for DSP 2814.
Respectfully submitted,
Jack L. Best
pager- Engineering Department
JLB:DLS:sf
Attachment
Recommendation pp ved:
Roge J. Dc an
General Manager -Chief Engineer