HomeMy WebLinkAboutAGENDA BACKUP 03-30-1978March 27, 1978
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: CLAIM OF MR. & MRS. STEPHEN WISE, 125 FAIRFIELD PLACE,
MORAGA IN THE AMOUNT OF $75,000.00 PROPERTY DAMAGE
ISSUE: This claimant is the neighbor of the DeJarnett's, 119 Fairfield
Place who have also filed a claim for damages.
BACKGROUND: This is a slide area that was repaired by the former
owners of the properties with the financial participation of the
District. Both owners guaranteed the work. I don't feel that there
is any real basis for this claim because the repair work has not
damaged the Wise property.
RECOMMENDATION: Deny claim and refer to insurance carrier.
Respectfully submitted,
Robert H. Hinkson
Manager, Maintenance Department
RHH:yb
Re endatio proved:
Roge J. D an
General Manager -Chief Engineer
VII. NB
3
3/ 30/ 7E
0 VII. NI
4
March 27, 1978 3/30/7F
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: REQUEST AUTHORIZATION TO CLOSE ACCOUNT 2910 "DEER TRAIL
SEWER RELOCATION" AND RETURN $1,2b1.00 SURPLUS TO
APPROPRIATE ACCOUNT
ISSUE: $5,000.00 was authorized by the Board for this work. The job
has been completed and there is a surplus of $1,261.00 in the authori-
zation that can be returned to the appropriate account.
BACKGROUND: A pier for a retaining wall was driven through the 6" sewer
line on Deer Trail. To correct the problem it was necessary to relocate
the line away from the slide area the wall is containing.
RECOMMENDATION: Close account #2910 "Deer Trail Relocation" and return
$1,261.00 to appropriate account.
Respectfully submitted,
Robert H. Hinkson
Manager, Maintenance Department
RHH:yb
Rec mmend?jj proved:
_ZZ �r
Roge� J.
Genera l Manager -Chief Engineer
VIZ. NB
3/30/7$
March 14, 1978
MEMORANDUM
FOR: HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA:
Roger J. Dolan, General Manager -Chief Engineer
SUBJECT:
AUTHORIZATION OF .
FROM
5A, PHASE I CONSTRUCTION ACCOUNT
THE
Issue: The
construction
following expenditures were made from the 5A, Phase
account and
I
are submitted for your approval:
P. 0. No.
�~
Descri tion
Authorized
34711
Cost
,370.92
34704
Installation of eight shower doors 817.3
Purchase of 4
conductor 22 awg
telephone wire and installation of 978.66 6
34$66
telephones
34867
Updating chlorine analyzer 1,288.00
Purchase of Vertical
34852
Blinds
Purchase of material to supply 2,420.07
pp Y 1,430.00
Power to Gate G34507 x'935.03
Previously Approved
Expenditures $18x370.92
Total Expended
$.25 � 305.95
Recommendation: Board approval of 6,
Phase I construction account
pofdthi�seamount
construction
and reimbursement
account. toethe
Respectfully submitted,
;�y
DGN:mg D. G. Niles
Manager, Plant Operations
Re mendation Approved:
Rog J. olan
General Manager -Chief Engineer
VI. 08
2
3/30/78
March 23, 1978
MEMORANDUM FOR: HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: Authorize the attached quote for a cost audit
of the District garbage franchises.
ISSUE: An audit is required to justify the costs reported by the
garbage franchises in their 1977 financial statements and 1978 -79
rate request.
BACKGROUND: The garbage companies franchised by the District are
currently preparing requests for increased rates for 1978 -79. In
the past, a study has been performed by the District staff to justify
reported costs. However, because of the personnel shortage we are
currently experiencing in our accounting office, a study by the
District staff will take more time than is available. Therefore, it
is recommended that the District authorize Mr. Sandy Plourde, our
CPA on retainer, to perform the cost study. Mr. Plourdes time schedule
and financial quotation is attached.
RECOMMENDATION: Authorize the attached quote for a cost study of the
District garbage franchises.
Respectfully submitted,
Ronald R. Reagan
Senior Accountant
Reviewed by:
W. C. DALTON
Deputy
General Manager -Chief Engineer
Recommendation Approved:
ROGER . D N
General Manager -Chief Engineer
p O
March 22, 1978
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan
General Manager -Chief Engineer
SUBJECT: NE14 OFFICE BUILDING
I. SITES
There were a total of 27 building sites submitted for consideration
(Exhibit A). We have selected eight for further evaluation. The
final recommendation to the Board should be ready by the end of April
after the architect has a chance to review the sites.
2. SELECTION OF ARCHITECT
We have received a total of 46 submittals from architects and we have
screened these submittals down to eight (Exhibit B
45- minute interviews for architects for Friday, �' We have scheduled
to 5:15 p.m. The scope of the interview is coverediin7therattacheda'm.
letter we propose to send to the architects (Exhibit C).
3. BUILDING EXTERIOR DESIGN
This is the appropriate time to consolidate our ideas on what the
building will look like. To help us in our consideration of a desired
design, pictures of existing, local buildings have been placed on the
display board. See Exhibit D for partial list. Please indicate your
preference as to exterior design.
Respectfully submitted,
Jack Best
anager- Engineering Department
JLB:sf
Approved:
,-A r ,
Roger J• olan
General Manager -Chief Engineer
J EXHIBIT A
C
f '
i
T February 24, 1978
I'
O .
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
FR02 ", Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: RUNNING SUiMRY OF LOCATIONS CONSInERED FOR NE'
W OFFICE SITE
Si. to
1. Y.V. & No.
Wiget
2. No. Civic
& Pine
3. Treat &
// Oak Road
lO 4. Taylor at
l Norse, P.H.
5. Mon.Plaza &
C1eay.,P.H.
6. Olympic
7. Camino
Diablo
8. Sprin -brook
9. No- Calif. &
Pringle
10. Treat &
Buskirk
11. Treat & Oak
Meeting of February 16, 1978
Area
Sq.Ft. Price
100,000 $2.70 /s F
Problems
Remote
Recent
Sale
Zoning
Access;
Location
Size,
Location
Zoning
Location,
Slide
Size
Redevelop -
men t
None
Consider
Further
No
No
Yes
Yes
No
Yes
No
No .
No
Yes
Rd ' a. r. Prone Yes
$650,000
-.✓1 32. Hwy 24 & 187, 000
�iacre Rd Mtz $1- 25 /S.F. Location No
$234,000 Nt View San.
Additional sites being investigated will be included in Board books
at neeting.
$270,000•
320,000
$7.00 /S.F.
$2,240,000
158,558
$2.49/S.F.
$400,000
149,846
$1.41 /S.F.
$212,000
57,374
$3 to $5.50
per S.F.
409,464
$3 to $5
per S.F.
226,512
$0.43/S.F.
$97,500
12,763
$215,000
74,000
$16.50 /S.F.
$1,221,000
Meeting
of March 2, .1978
126,000
$5.00 /S.r.
$630,000
100 000
$6 50/
Problems
Remote
Recent
Sale
Zoning
Access;
Location
Size,
Location
Zoning
Location,
Slide
Size
Redevelop -
men t
None
Consider
Further
No
No
Yes
Yes
No
Yes
No
No .
No
Yes
Rd ' a. r. Prone Yes
$650,000
-.✓1 32. Hwy 24 & 187, 000
�iacre Rd Mtz $1- 25 /S.F. Location No
$234,000 Nt View San.
Additional sites being investigated will be included in Board books
at neeting.
J
23•
Bates Ave
Indust.
0
0 EXHIBIT A
Conc.
Park
Area
of
No
Site
S Ft.
- �..: _.._
Price
- ----��
Problems
Consider
/
13•
Blvd. Way &
Flora
49 000
$5.61 /S.F.
Size
Fur4 ter
rr rr
++
$275,000
No
No'
25•
Meeting of March 16,
1978
14.
P.H. Rd. &
Topaz Ln., P.H.
125,975
$4.00 /S.F•
Access,
No
15!
$503,902
Location
No
26•
Brown Ave &
Deerhill Rd Laf
Howe Rd., Mtz
. 82,498
$2.30/S.F.
'
$395,000
,
Zoning
$190,000
Location
Mt. View San
No
6,2 Ac
16:
Geary Rd at
62,290
$800,000±
Location,
No. Main
Remodel
No
Zoning
'
Parking
17•,
'
Arnold Indust.
& Morello
2.709 Ac
1200
1.6� /S. F.
Location
No
Mt View San
18.
2730 North Main
2.35 Ac
$7- 8.50 1S.F.
$716- 870,000
Price
Yes
19:
Taylor near
Norse, P.H.
2.9 Ac
$295,000
None
$2.34/S. F.
Yes
20.'
Taylor near
Norse, P.H.
5 Ac
$250,000
Terrain
No
212
.
West of Port
Chicago Hiway
29 Ac
$2.5QjS.F.
Zoning
North of Hiiiay 4
Location
No
22,E
it Of
2.86 Ac
$1500 /1-lo
Lease
Zoning,
No
Location,
Lease
J
23•
Bates Ave
Indust.
Not
Conc.
Park
Available
of
No
24.
Galaxy way
rr
Conc .
rr rr
++
No'
25•
Vincent Rd
No
26•
Brown Ave &
Deerhill Rd Laf
2.87'Ac
$3.5,000
Location
'
$395,000
,
Zoning
Yes
27•
Camino Diablo Rd
6,2 Ac
N/A
Location,
No
Zoning
EXHIBIT B -
ARCHITECTS
1. CORLETT & SK4ER ARCHITECTS
Received
Ra-- n
121 Second St., S.F. 94105
3 -14
il.8
982 -1838
2. Hertzka & Knowles
'
25 thin St., S.F. 94105
3 -15
19.0
421 5891
3. Albert F. Foller Associates
100 Van Ness Avenue - 19th Fl
3 -16
15.5
San Francisco 94102
863 -8737
4. Caro Dorian & Associates
140 Geary Street
3 -16
18.1
San Francisco, CA 94108
5. Perata Sylvester Mutter
954 Risa Road
3-17
Lafayette, CA 94549
284 -1803
6. Lyons and Hill Aia Inc.
47 Quail Court Suite 301
3 -17
10.9
Walnut Creek, CA 94596
7- S. Iyama & Associates .
355 Grand Avenue
3 -17
i5.8
Oakland, CA 94610
8. Wurster, Bernardi & Emmons, Inc.
1620 Montgomery Street
3 -17
18.7
San Francisco, CA 94111
* 9. Hardison & i matsu Assoc
522 Washington St., S.F. 94111
3-20
26.8
981 -2025
* 10. Armas Sootaru
610 Las Juntas
3 -20
28.3
Martinez, CA 94553 228 -5252
11- Triangle Designs International
22585 Montgomery St., S.F. 94541
3 -20
9.3
581 0353
12. Confer Crossen & Nance
1200 Contra Costa Blvd., Conc 94523
3 -l0
22.2
686 2292
13, Liar - Mal inowski - Loo
1196 Boulevard Way W.C. 94596
3--20
23.9
939 --6842
0
14. Cousteau - Aiken, Inc.
31 Embarcadero Cove
Oakland, CA 945606
536-1700
15. Lin Wu Assoc.
1916 Webster St.
Alameda, CA 94501
523 -2550
16. Angell Lockwood Assoc
324 13th St - Rm 400
Oakland, CA 94612 832 -1855
17. Wm. Schuppel & Assoc.
550 Kearny Suite 640
S. F. 94108 788 -0310
18. Bond - Dougherty, Inc.
2118 Sacramento St.
Vallejo, CA 94590 707 643 -6431
19. Peter Kampf & Assoc
277 LaEspiral
Orinda, 94563 254 --5607
20. E. Paul Kelly
1537 Shattuck Avenue
Berkeley, CA 94709 845 -5010
21. Frank L. Hope & Assoc.
562 rlission St., S.F. 94105
434 -0381
* 22. Cometta and Cianfichi
3516 MacDonald Avenue Richmond
232 -2637
* 23. Dennis & Curtis
William Jeffries Associates
1250 Pine St., W.C. 94596 938 -5320
24. Richard V. Galvez & Associates
2100 Peralta Blvd
Fremont, CA 94536 793 -3690
25. Fitzpatrick, Karren, Seals & Solomon
420- 3rd St.,
Oakland, CA 94607 763 --6611
0
EXHIBIT B
Received Ra_ tim
3 -20 16.1
3 -20 17.6
3 -20 12.6
3 -20 10.3
3 -20 12.2
3 -20 12.4
3 -20 7.9
3 -20 15.2
3 -20 24.7
3 -20 27.2
3 -20 12.6
3 -20 12.1
EXHIBIT B
26. Peters, Clayberg and Caulfield
Rec--- -eived
RaLinA
370 Brannan Street
3 -20
8.7
San Francisco, CA 94107
* 27. Ishimaru, O'Neill & Simmons
577 Fifth Street
- 3-20
24.6
Oakland, CA 839 -8313
28. Eden & Eden
203 California St.,
3 -20
17.7
San Francisco, CA 94111 956 -3640
29. vBNA, Inc.
363 Thirteenth St
3 -20
17.5
Oakland, CA 94612 763 -1313
30. Richard A. Dobell & Associates
240 Lafayette Circle
3 -20
23.7
Lafayette, CA 94549 283 -1700
31. Akol and Yoshii - Architects & Engineers
125 University Avenue
3 -20
14.7
Berkeley, CA 841 6767
32. Paul Johansson & Associates
55 New Montgomery
3 -20
14.3
San Francisco, CA 94105 495 -4735
* 33. AEP
1620 North Main St., W.C. 94596
3 -20
30.0
938 -1242
34. Tada and Associates, ARchitects
Mitsuru Tada,
3 -20
11.5
305 Grant Avenue, 3rd Floor S.F. 94108
989 -2250
35. Wong - Brocchini & Associates
737 Beach Street
3-20
17.1
S.F. 94109 673 -6604
36. Ratcliff, Slama & Cadwalader
3408 Grove St., Berkeley 94703
3 -21
18'1
652-1-972
37. Reid & Taries Assoc.
1019 Market, San Francisco 863 -2420
3 -21
19.0
38. Lindsay Howden Associates
5332 College Avenue, Oakland CA 94618
3 -Y2
4.5
39. Robinson and Mills ARchitecture
1005 Sansome Street
San Francisco, CA
989 -2290
40. Philip Jack Associates
4344 Army Street
San Francisco, CA 94131
648 1012
41- Brown, McCurdy & Stickney
315 14th Street
Oakland, CA 94612
834 -8280
42. William A. Kendrick
4763 Nineteenth Street
San Francisco, CA 94114
43. Kaplan /McLaughlin
901 Battery St
San Francisco, 94111
44. Rockwell Chatham Marshall Assoc
888 Post Street
San Francisco, CA 94109
45. Beland, Gianelli & Assoc.
4287 Sonoma Boulevard
Vallejo, CA 94590
* 46 Mackinlay Winnacker McNeil
5238 Claremont Avenue
Oakland, CA 94618
47.
Note: * Selected for interview
EXHIBIT B
0
Received
3 -23 22.0
3 -23 24.6 * :
3 -24 14.1
3 -24 12.4
3 -24 17.3
3 -24 20.4
3 -24 20.2
3-24 25.2 *
LZ"T2trL2 Yj --- -- _
C-)
O
ARCHITECTS INTERVIEW SCHEDULE - APRIL 7, 1978
8:30 a.m. -
9:15 a.m.
INTERVIEW NO. 1
AEP
9:15 a.m. -
9:30 a.m. -
10:15 a.m. -
10:30 a.m. -
11:15 a.m. -
11:30 a.m. --
12:15 _
9 :30 a.m.
10:15 a.m.
10:30 a.m.
11:15 a.m.
11:30 a.m.
12:15 p.m.
1:15 p.m,
COMMITTEE D TALOGUE
INTERVIEW NO. 2
COMMIfiTEE D
DIALOGUE
INTERVIEW N0: 3
COMMITTEE DIALOGUE
INTERVIEW N0. 4
LUNCH
1620 North Main St., W.C. 94
938 -1242
Ishimaru, O'Neill & Simmons
577 Fifth St., Oakland
839 -8313
Philip ,Tack Associates
4344 Army St., S.F. 94131
648 1012
Mackinlay Winnacker McNeil
5238 Claremont Ave, Oak 94618
b58 -3530
z:zs p.m. -
2:00 p.m. -
2:15 p•m• -
3 :00 p.m. -
3:15 p.m. -
4:00 p.m. -
4:15 p.m. -
2:00 p.m.
2:15 p.m.
3:00 p.m.
3:15 p•m•
4:00 p.m.
4 :15 p .m.
5:00 p.m.
INTERVIEW NO. 5
COMMITTEE DIALOGUE
INTERVIEW N0. 6
COMMITTEE DIALOGUE
INTERVIEW N0. %
COMMITTEE DIALOGUE
INTERVIEW NO. 8
Hardison & Komatsu
522 Washington St. , S.p
S.F. 9411:
g81 -2025
Arenas Sootaru
610 Las Juntas, Mtz 94553
228 -5252
Dennis & Curtis
William Jeffries Assoc
1250 Pine St., W.C. 94596
938 -5320
5:00 p.m. -
5 :15 p •m•
COMMITTEE DIALOGUE
Cometta and Cianfichi
3516 MacDonald Ave,Richmond
232.2637
Note: All the
3/27/78;
above architects were contacted for
confirming letter sent 3/29/78.
appointments
JLB
n
J. J. CARNIAro NTRAL. CONTRA COCZ71 �
Tel. �� -saau esel fur the District SANITARY D I STR I CT`s'
CLYDE M. HOPKINS 1250 SPRINGBROOK ROAD
secretary MAILING ADDRESS P.O. BOX 5265
WALNUT CREEK, CALIFORNIA 94596
TEL. 934 -6727 AREA CODE 415
EXHIBIT B
ROGER J. DOLAY
General dlanagur— Ctli&f Engineer
W. C. DALTON
Deputy
General M40uger —Chief Engineer
Thank you for your submittal for architectural, services for
this District's new office building. Yours was one of a total of
46 which were received. All of the submittals were impartially
evaluated on the basis of:
1. The number of disciplines in which personnel in your
firm (excluding consultants) are capable.
2- Experience of your firm in the profile codes found on
page 3 of Standard form 254 which are associated with
the new office building.
3. Previous experience of your firm with office buildings.
4. The number of local projects which your firm has under-
taken in the last five years.
5. The content of the submittal itself.
Unfortunately, the rating of your submittal was not sufficiently
high enough to qualify for further consideration. Again, thank you
for your effort.
Very truly yours,
CENTRAL CONTRA COSTA SANITARY DISTRICT
Roger J. Dolan
General Manager -Chief Engineer
RJD:JM :sf
�� Recycled Paper
w EXHIBIT C
EXHIBIT ATTACHMENT TO INTERVIEW LETTER
1. Describe the design team and the extent of involvement anticipated
as you understand the scope of the project.
2. Describe your proposed programming procedure relative to the
District's input of spacial requirements, site selection, etc.
3. What is your company's present work load; and if selected, what
would be your availability to complete the work?
4. Describe in greater detail, your experience in dealing with offices
of the nature anticipated in this project.
5. Describe the financial arrangementas as you would accept or prefer
in dealing with the District. (Actual or final cost will not be a
consideration under this topic at this interview session)
b. What areas of project planning do you see as potentially most
time consuming and, notwithstanding jurisdictional delays, in what
time frames do you estimate the investigation, design and environ-
mental review and construction phases of the project?
7. What unique talents or other services can your company provide to
the enhancement of the project, and why should the District consider
such of import to the project and to the community?
8. In what range do you visualize the construction costs of this project?
EXAMPLES OF EXISTING BUILDINGS
Bui.ldinA
1. Board of Realtors
2. LaSalle College
3. George Gordon Center
4. Vallco Park
5. CCCWD Headquarters
6. Alameda County Public Works -
7. Richmond Health Center
8. Hayward Unified School District
9. Public Defenders Office
10. Lafayette City Hall
11. Office Complex
13. P.H. Park and Recreation
14• Citizens Savings
15. Office Complex
16. P.I.E. Offices
17. Safeway Offices
18. Foremost Ins. Offices
19. Calrus Offices
20. Fidelity Savings
21. S.F. Savings
22.
11
EXHIBIT D
Location
N. Wiget and Ygnacio Valley, W.C.
Susanville
Court & Escobar, Martinez
Cupertino
Concord Avenue, Concord
Hayward
Richmond
Hayward
1957 Parkside, Concord
975 Lafayette, Circle
3720 Mt Diablo Blvd., Lafayette
Taylor Blvd & Civic, P.H.
CC Blvd and Monument, P.H.
Oak Grove & Mitchell Dr., W.C.
Shadelands & Via Monte, W.C.
Oak Grove & Ygnacio, W.C.
Ygnacio & No. Wiget, W.C.
Ygnacio & Marchbanks, W.C.
No. California & Pringle, W.C.
No. California & Olympic, W.C.
0 V11. !fig
z
3/30/7
March 20, 1478
MEMORANDUM FOR: HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: Roger J. Dolan, General Manager -Chief Engineer
SUBJECT: EXECUTE "CONSENT TO COMMON USE" WITH P.G. &E. FOR CROSSING
EXISTING 100' IN WIDTH P.G. &E. EASEMENT NEAR DOLORES WAY
IN ORINDA
ISSUE: This "Consent to Common Use" is required to permit an 8 -inch sewer
main to cross P.G. &E's prior existing easement.
BACKGROUND: This agreement is the standard P.G. &E. Consent to Common Use
form. It retains their prior rights while permitting us to cross their
easement. It also provides that we can both use the common use area
provided we do not unreasonably interfere with the rights of the other.
RECOMMENDATION: Approval, execute document and authorize its recording.
Respectfully submitted,
Jack L. Best
Manager - Engineering Department.
JLB:sf
R end at n ppraved:
Roger J. olan
General Manager -Chief Engineer