HomeMy WebLinkAbout05. Strategic Plan Key Performance IndicatorsGOAL ONE
Meet Regulatory Requirements for the Good
of the Community and Environment.
Strategy 1
Strive to achieve 100% permit compliance in air, water, land and other regulations.
Initiatives
5
• Develop long -term strategies through the Treatment Plant Master to meet future
requirements for regulatory compliance, energy efficiency, and infrastructure
sustainability. Collaborate with sister agencies and industry associations to monitor
trends in regulatory changes.
• Anticipate new regulatory requirements by taking a proactive, collaborative approach
with regulatory agencies, and act before implementation of those new requirements.
• Actively manage greenhouse gas (GHG) emissions in the most cost effective and
environmentally responsible manner. This currently means keeping GHG emissions
below the California Cap and Trade Program inclusion threshold of 25,000 metric tons
CO2e per year
• Explore new technologies that use less energy and produce less GHG.s through inter-
agency events (e.g., information sharing and vendor presentations)
• Evaluate feasible new technologies through pilot studies
Strategy 2
Strive to reduce the number of sanitary sewer overflows by continuing Best Management
Practices.
Initiatives
• Continue seven -year system -wide CCTV Program.
• Establish defined cleaning cycles on a yearly basis.
• Ensure proper cross - training for CSO crews.
Goal 1: MEET REGULATORY REQUIREMENTS
Key Performance
FY 14 -15
FY 14 -15
FY 15 -16
Process
Data Tracking
Indicator
Performance
Target Met?
Target
Owner
Method
New Regulations
• Identify potential
Gauge impact of
J -M Petit
changes in
changes in permits in
regulatory
advance
permits and
respond
proactively
Air Quality
Identify new
Alan Weer
Title V
• Maintain
technologies to reduce
Compliance
excellent Title V
energy consumption
reports
compliance track
and limit GHG
record
emissions through
inter - agency
collaboration and pilot
studies
• Remain below
Maximize landfill gas
25,000 metric
combustion and
Randy Schmidt
California Air
tons of GHG
minimize natural gas
Resources
emissions
combustion
Board
Greenhouse
• Minimize occurrence
Gas
of Title V Reportable
Inventories
Compliance Activities
BAAQMD
• Finish
Submit compliance
approval of
compliance
plans to BAAQMD
incinerator
plans for new
compliance
incinerator rules
plans
effective in 2016
Reduce SSOs
• Have less than 3
• TV 175 miles per year
Paul Seitz
spills per 100
• Complete cross -
miles
training — Yellow Book
Manage Risk
• Hire Safety
• Recruitment
Deputy GM
Officer
completed by the end
of 2014
• Perform Safety
Compliance
• Address findings on
audit and
EORM audit
address findings
GOAL TWO
Ensure Financial Stability
Strategy 1
Maintain a Fair and Equitable Rate Structure based on Cost of Service study results.
f
Initiatives
• Conduct Cost of Service study
• Develop Reserves policy for the District Reassess District investment policy.
• Collaborate with other agencies to purchase goods and materials.
• Seek additional revenue opportunities, savings and grant opportunities.
Strategy 2
Address Unfunded Liability, minimizing it in the future.
Initiatives
• Define all elements of unfunded liabilities.
• Develop presentations for Board, staff, stakeholders and the public detailing the
unfunded liability.
3
Strategy 3
Implement prudent risk management procedures to minimize exposure to risk.
Initiatives
• Reduce /control costs of risk transfer in insurance and contracts.
• Reduce /control costs of liability claims and litigation.
• Establish target reserves for the self- insurance fund.
• Evaluate and implement additional cost - effective self- insurance opportunities.
• Hire District safety officer and increase trainings.
Goal 2: ENSURE FINANCIAL STABILITY
Key Performance
Indicator
FY 14 -15
Performance
FY 14 -15
Target Met?
FY 15 -16
Tar et
Process Owner
Data Tracking
Method
• Implement fair
• Study underway
April 2015
April 2016
Rate Structure
David Heath
Thea Vassallo
• Complete Cost of
• Study underway
Dec. 2014
Dec. 2015
J -M Petit
Annual Board
Service study to
Danea Gemmell
presentation
determine
revenue needs
• 10 Year Plan
• Policy adopted by
June 2015
incorporated into
Board
Cost of Service
study
• Determine
• Board adopt policy
percentage of
target reserves/
Formal Reserve
Policy determined
• Shared service
Collaborators
TBD
agreements with
identified and
other agencies
partnered
(Table continued on next page.)
4
Goal 2: ENSURE FINANCIAL STABILITY
Key Performance
Indicator
FY 14 -15
Performance
FY 14 -15
Target Met?
FY 15 -16
Target
Process Owner
Data Tracking
Method
Unfunded Liability
Actuarial
• All components
Presentations to
Sept/Oct annual
Sept/Oct
David Heath
reports; annual
defined
Board, staff and
updates
annual updates
audit;
public completed
Thea Vassallo
OPEB and
CCCERA
Manage Risk
• Prepare and
Provide Claim
Shari Deutsch
present the Risk
frequency; Workers
Management
Comp ExMod; Cal
Annual Report
HOSHA Statistics:
Insurance costs and
trends
J -M Petit
• Evaluate and
Board approval
Neil Meyer
update
Engineering
specs and
standard
contracts for
indemnity
language and
insurance
requirements
• Reduce /control
0 Implement revised
costs of liability
SSO and Backup
claims
Response Plan
• Establish target
0 Recommend to
reserves for self-
Board minimum
insurance fund;
reserve level
fully funded within
3 years.
• Reduce threat of
service
interruption thru
Asset Mgt.
GOAL THREE
Develop our Human Capital Resources
Strategy 1
Ensure appropriate staffing levels.
Initiatives
• Engage labor relations expert as advisor in negotiations, comparative studies, and other
matters of the District's human resource.
• Conduct benchmarking studies to determine appropriate staffing levels.
• Identify key positions that may be lost to retirements and prepare appropriate
succession plans.
• Develop appropriate strategy for succession planning.
Strategy 2
Develop and implement Management and Supervisor Academies.
Initiatives
• Identify potential, interested future leaders seeking future career development in the
District for targeted leadership training.
• Collaborate with industry, civic and other appropriate associations on shared leadership
development program models (e.g., Bayworks).
• Encourage senior leader involvement in industry-based associations.
• Encourage training through industry associations.
0
Strategy 3
Provide appropriate coaching, mentoring and development resources for staff to be successful
in current and future positions.
Initiatives
• Retool all current performance evaluations to focus on workforce and career
development outcomes for future human capital needs.
• Strive to create a quality of life and wellness culture consistent with the core values of
the District.
Goal 3: EMPLOYEE DEVELOPMENT
Key Performance
Indicator
FY 14 -15
Performance
FY 14 -15
Target Met?
FY 15 -16
Target
Process Owner
Data Tracking
Method
• Completion of
• Recommendation
Teji O'Malley
staffing needs
accepted by Board
David.Heath
assessment
in 2/15
• Compile list of
• List complete by
probable
1014
Managers
retirements
• Document
• Implement plans
Succession
succession
Planning
planning
Committee/Teji
objectives and
O'Malley
establish formal
i
succession plan
I
• Conduct
Training ongoing.
Michael Scahill
Customer
Service refresher
training for all
staff
(Table continued on next page.)
PA
Goal 3., EMPLOYEE DEVELOPMENT
Key Performance
Indicator
FY 14 -15
Performance
FY 14 -15
Target Met?
FY 15 -16
Target
Process Owner
Data Tracking
Method
Leadership
Development
Training
• Launch
• Mgt. Academy
Michael Scahill
Management
begins in 8/14
Academy
• Develop
• In development for
Teji O'Malley
curriculum for
1/15 start
Michael Scahill
Supervisor
Academy
• Establish
• In process
Succession
Mentorship
Planning
Program
Committee
• Actively
• Increase
Number of
David Heath
participate in
leadership roles in
association
Ops Director
industry related
associations
leadership
associations
positions
• Implement
• Launch in 1/15
Teji O'Malley
quarterly HR
supervisor
training sessions
• Hold lunch -time
• On -going
Teji O'Malley
brown bags for
J -M Petit
relevant industry
topics
Workforce
Development
• Develop SOPs
• SOPs completed
Managers
for every critical
by all depts.
function
• Develop list of
0 On -going
Directors and
scenarios that
managers
could disrupt
CCCSD service
(e.g.,
earthquake, fire,
power failure,
communication
failure, etc.) and
develop SOPS
for each scenario
GOAL FOUR
Be a Leader in the Wastewater Industry
Strategy 1
Use sustainable practices that minimize waste, maximize resources, protect the ratepayer,
improve the community, and embrace innovation.
P-1.111-1..N ". E
Initiatives
• Update MissionNision and core values statement to reflect forward thinking.
• Become a "Net Zero Consumer" consistent with best practice Utility of the Future
models.
• Continue collaborations and partnerships with sister agencies, public and private
entities.
Strategy 2
Collaborate with regional water and wastewater agencies to augment the region's water supply
while expanding access to recycled water for Central San customers.
X
Initiatives
• Pursue educational, regulatory and legislative initiatives that promote water recycling.
• Develop partnerships and collaborations with other districts, as well as public and
private agencies.
• Optimize our relationship with the Contra Costa Water District and continue to pursue
possible collaborative projects.
• Investigate satellite and scalping plants for use by public and private entities.
• Identify new funding sources on State and Federal levels including grants and SRF
loans.
• Develop operating parameters and asset needs required to provide recycled water to
the Concord Naval Weapons Station.
Strategy 3
Complete IT Master Plan integration throughout all District operations.
Initiatives
Review and adoption of the IT Master Plan.
Include in IT Master Plan the business requirements to enable online transactions for
permitting, payments, payroll and timecards along with other digital opportunities to
improve effectiveness and efficiency of service delivery.
Implement IT Master Plan.
10
Goal 4: CCCSD AS INDUSTRY LEADER
Key Performance
Indicator
FY 14 -15
Performance
FY 14 -15
Target Met?
FY 15 -16
Target
Process Owner
Data
Tracking
Method
Become the Utility
of the Future
• Rework Mission
Adopted by Board
Yes
Michael Scahill
statement to
7/14
reflect a forward -
thinking
organization
• Reduce energy
Decreased energy
Percent of
J -M Petit
consumption by
consumption
energy
Neil Meyer
_ percent
reduction
Alan Weer
• Reclaim
Collaborate with
Ops Director
leadership in the
sister agencies,
field through
academia, public and
presentations,
private partnerships
pilot studies,
conference
Staff members to
participation,
make at least 5
annual
presentation per year
benchmarking
Recycled Water
• Complete
Apply for new drought
J -M Petit
recycled water
related RW grants
Melody LaBella
master plan
Danea Gemmel[
Roger Bailey
• Collaborate with
Finalize EBMUD
other agencies to
utilization agreement
increase amount
of Lafayette RW
of RW produced
pipeline
and used
• Reach agreement
• Quarterly meetings
on delivery of
with CCWD General
recycled water
Manager
with CCWD
• Establish list of
• Explore private
potential
scalping plants
customers for
recycled water
• Open RW filing
• In process
station
11
Key Performance
Indicator
FY 14 -15
Performance
FY 14 -15
Target Met?
FY 15 -16
Target
Process Owner
Data
Tracking
Method
Completed IT
Master Plan
• Review and
• Master Plan
David Heath
accept
accepted by Board
recommendations
2014
of Master Plan
• Implement
• Software system
System
David Heath
replacement of
selection completed.
implementation
Paul Seitz
CSO Accela
RFP for
complete
Dana Lawson
CMMS System
implementation
consultant completed
• Implement
• Funding approved by
RFP issued.
Elaine Boehme
Records Mgt.
Board. RFP issued
Contract
David Heath
System
for software vendor
awarded to
software vendor.
• Replace ERP
• Funding approved by
System
David Heath
System
Board. RFP
implementation
preparation in
in process with
process.
estimated
completion in
FY 16 -17.
12
GOAL FIVE
Provide Exceptional Customer Service
Strategy 1
Make a concerted effort to understand customer expectations and degree of satisfaction with
District services.
_A
Initiatives
• Develop residential and business surveys.
• Determine how survey results will be measured, communicated and acted on.
Strategy 2
Increase District interaction with local, state, and federal officials.
Initiatives
• Give annual or semi - annual presentations for City Councils by liaison Board members.
• Hold annual meetings with General Manager and Board liaison with Mayor, City
Manager and Public Works Director of each city, and County counterparts.
• Keep State legislators representing the District's service area and all County
Supervisors informed of Central San's mission, accomplishments, and relevant plans.
• Hold annual meetings between Board member and CC Water District.
• Appoint Board member(s) as liaison for CCWD and EBMUD.
Strategy 3
Develop Business Plan, integrating and prioritizing initiatives identified in the Strategic Plan.
13
Initiatives
Review options for one vs. two year budgets.
Update Standard Specifications and post to website.
Investigate viable use of social media outlets.
Strategy 4
Continue Emergency Operations and business continuity preparations throughout the District
to best respond in the event of a catastrophe.
Initiatives
• Perform periodic review of Business Continuity Plan.
• Continue to conduct bi- annual Emergency Operation Center exercises.
• Collaborate with local, county and state agencies in mutual aid program.
Goal 5: EXCEPTIONAL CUSTOMER SERVICE
Key Performance
FY 14 -15
FY 14 -15
FY 15 -16
Process Owner
Data Tracking
Indicator
Performance
Target Met?
Target
Method
Customer Survey
• Retain
Survey and /or focus
Michael Scahill
consultant and
groups launched
develop survey
after 1/15
for District
customers,
residential and
business
Political Interaction
• Increase
Stronger
Percentage of
Roger Bailey
interaction with
relationships with
meetings with
Board
client cities,
client cities, State
local officials
others
and County
4
legislators
• Have annual
Attend CASA's
Roger Bailey
outreach to state
Public Policy Forum
Board
and federal
and D.C.
officials
conference to meet
legislatures
Internal Business
Practices
• Permit
In process
Danea Gemmell
applications
updated and
posted to
website
• Explore
Determine how
Michael Scahill
communication
social media might
value and costs
be beneficial to
of using social
District
media
(Facebook,
Twitter, etc.)
14
Emergency
Capital
Operations
Procure
Un8 Range
Construct
• Comply with
• Conduct at least
Install
Plan Al
Shari Deutsch
SEMS and NIMS
one EOC activation
Capttetlze
requirements for
exercise per year
Dispose
local government
Salvage
ommission
emergency
• Expand or enhance
and
SUMP
Maintain
Repair
e
preparedness
the cache of
Revenue
and response
emergency
supplies needed to
respond in a
disaster
• Develop and
• Serve on the
maintain working
Operational Area
relationships and
Council
collaborative
opportunities
• Join the East Bay
with emergency
Regional
management
Communications
personnel in
System Authority
local and area
governments
• Create
In process
Shari Deutsch
emergency
Paul Seitz
response SOPs
J -M Petit
GOAL SIX
Maintain a reliable wastewater infrastructure
Strategy 1
Establish an Asset Management Program
Annual
Capital
&Mast
Procure
Un8 Range
Construct
capital
Install
Plan Al
Asset
Capttetlze
Reure Life
Dispose
Salvage
ommission
and
SUMP
Maintain
Repair
e
DOpera
Revenue
15
Initiatives
• Develop an Asset Management Policy for the District.
• Perform a strategic asset management gap analysis. Determine whether current
resources are being used effectively and what resources will be needed for effective
operation in the future.
• Develop an Asset Management Implementation Plan.
• Train District staff to understand the purpose and usefulness of asset management and
their roles in such a program.
Strategy 2
Update the Capital Improvement Program annually through prioritization and risk analysis
while focusing on the sustainability of customer and environmental needs and economic
demands.
Initiatives
• Use Asset Management Program to optimize operations, maintenance, rehabilitation
and replacement.
• Use computerized maintenance management system (CMMS) enhancements to align
with present and future asset management program needs
• Use condition assessments and predictive failure analysis to replace /rehabilitate
infrastructure at the most cost - effective time.
• Expand in -house capabilities for the inspection and assessment of collection system
assets.
• Create a new Wastewater Vulnerability Assessment Plan linked to District's Emergency
Operations Plan.
• Assure asset repair, rehabilitation and replacement efforts are coordinated within
affected communities to minimize disruptions and other potentially negative
consequences
Strategy 3
Increase enforcement of Overflow Protection Device ordinance.
Initiatives
• Articles in Pipeline newsletter, press releases and possible paid advertising announcing
District plans to enforce Overflow Protection Device ordinance, specifically the
consequences of not having an OPD.
• Targeted mailings in areas announcing the consequences of sewage back -ups into
homes (i.e. no liability on the District's part).
• Special discounts for the $50 OPD and /or discounted installation of OPDs by licensed
plumbers.
16
Goal 6: MAINTAIN INFRASTRUCTURE
Key Performance
FY 14 -15
FY 14 -15
FY 15 -16
Process
Data Tracking
Indicator
Performance
Target Met?
Target
Owner
Method
• Launch Asset
Active participation
Dana Lawson
Management
with consultant toward
Engineering
Program
the development of the
• Complete gap
asset management
analysis
plan i.e. participation in
• Implement plan
workshops /RFI and
other supporting
activities
• Make asset
Teji O'Malley
management part of
all employee training
• Complete
Paul Seitz
Wastewater
Alan Weer
Security
Neil Meyer
Assessment
J -M Petit
0 s Director
• Update 2010
• Update every 5 years
J -M Petit
infrastructure master
Danae Gemmell
Ian
• Annual infrastructure
CIPP Manager
master plan update
• Complete condition
Assessment/Condition
Neil Meyer
assessment within
based maintenance
Ops Director
maintenance group
(CBM) /Predictive
maintenance (PDM)
program
enhancements CMMS
enhancements
SOP /Best Appropriate
Practice (BAP)
update/development.
• Begin OPD
Develop incentive
Michael Scahill
enforcement
program
Paul Seitz
campaign
Roger Bailey
Danea Gemmell
17