HomeMy WebLinkAbout06.a. Cost of Service Pricing Objectives and Staffing Needs Assessment Update6•a. Central Contra Costa Sanitary District DATE: August 8, 2014 TO: HONORABLE MEMBERS OF THE BOARD / FROM: ROGER S. BAILEY, GENERAL MANAGER SUBJECT: RAFTELIS POWERPOINT FOR AUGUST 14, 2014 BOARD MEETING The attached PowerPoint is a draft meant to give you an idea of the intended direction for the Cost of Service workshop that will take place at the August 14, 2014 Board meeting on the following topic: Cost of Service Pricing Objectives and Staffing Needs Assessment Update. A final PowerPoint is expected to be available on the day of the meeting. Attached Supporting Documents: 1. Draft Raftelis PowerPoint - Pricing Objectives and Staffing Update 8/8/2014 DRAFT 8/8/2014 ro a -.A - i Equitability (Cost of The rate structure should ensure that each customer class is contributing Service Based equitably towards revenue requirements based upon the costs of providing Allocations) service to each customer class. Minimization of The rate structure should be developed such that adverse rate impacts on each Customer Impacts customer class are minimized. Rate Stability The rate structure should minimize dramatic rate increases or decreases over the planning period. Affordability The rate structure should not overly burden low volume customers. Simple to The rate structure should be easy for District customers to understand, utilizing a Understand and moderate level of educational tools. In addition, the rate structure should be Explain able to be effectively maintained by District staff in future years. Ease of The rate structure should be compatible with District's billing system. In addition, Implementation the rate structure should allow for the continuation of existing management and system reports. Revenue Stability The rate structure should provide for a steady and predictable stream of revenues to the utility under varying conditions. Conservation The rate structure should encourage water conservation. DRAFT Weight — Most Important = 4 1 — Very Important = 3 — Important = 2 � � - 211 — Least Important = 1 49 6 e Rating Rate Structures — A+ has 4.3 point value 4 C- has 1.7 point value 5 8/8/2014 3 8/8/2014 DRAFT DRAFT e Alternative Sewer Rate Structure Residential Fixed Only (Current Structure) Fixed by Residential Type Non- Residential • Fixed Only • Variable Only (Current Structure *) • Fixed and Variable *Current non - residential rates have minimum annual charge 9 10 8/8/2014 5 DRAFT ,- What are Capacity Fees? - One -time capital charges assessed against new development as a way to provide or cover a proportional share of the costs of capital facilities constructed or to be constructed for its use New users should pay their proportionate share to buy into the existing wastewater system • Government Code Secti capacity fees must: Reflect the link between received by new custom, Not exceed the proporti, providing service 11 8/8/2014 A DRAFT New customers only pay an amount equal to the net investment already made by existing users, based on replacement cost less depreciation This approach is suited for agencies that have capacity in their system and are essentially close to build -out JCurr Demand (EC U) Vuy;lnost U) 13 New customers pay for additional capacity requirements, irrespective of the value of past investments made by existing customers This approach is best suited for growing communities where additional facilities are needed to accommodate growth Incremental Increase in Capacity (EDU) 14 8/8/2014 Fi DRAFT Combination of Buy -In and Incremental Cost approaches based on capacity in current system and additional capacity needed 7Buy-ln Cost Incremental EDU) Cost ($ / EDU) is Original Cost Original Cost less Depreciation (OCLD) Replacement Cost Replacement Cost less Depreciation (RCLD) -- Commonly used method — More defensible since replacement cost recovers the cost of replacing the capacity in current dollars and also accounts for depreciation of the system 16 8/8/2014 9 DRAFT Capacity fees are typically calculated based on $ /Equivalent Dwelling Unit (EDU) - Residential customers typically equal 1 EDU Can differentiate between different types of residences, e.g. SFR, MFR, Mobile Home, Condos, etc. Non- residential customers loadings are compared to residential customers loadings to convert to an EDU basis 17 i 18 8/8/2014 9 DRAFT • Project Kick -off • Staffing needs • Recycled Water • Benchmarking • Project Introduction assessment Policy Discussion Workshop to Board Interviews • Staffing needs • Validation of • Employee Survey assessment Interview Findings •COSStudy — Pricing Interviews Reports Objectives Workshop • Present COS Study • Present • Present • Discuss SNA Findings • Submit Final Study Benchmarking Plan Benchmarking • Finalize COS Study Reports • Offsite Financial Results • Prepare Draft • Rate Model Training Planning Workshop • COS Study Workshop Reports and Manual • Present COS Study Results Your input is essential so that we can understand the challenges and help Central San be an innovative industry leader and a desirable and rewarding place to work. 19 20 8/8/2014 10 DRAFT A. Employee Driven 10 B. Board driven C. Management driven D. Other • Strengthen and optimize: — Organization -wide processes, resource allocation and structure (governance and administration) — Engineering and operations department processes, resource allocation and structure • Provide the means to meet emerging workforce support and succession management needs Q\0,¢ OF �� 21 22 8/8/2014 11 23 DRAFT Do the Organizational Structure and Primary Workflows Provide -- ? 11 2 8/8/2014 12 DRAFT Profetting Puhbc Health and the Environment 1. What three words would you use to describe Central San's work culture? Please use single words for each response. it C _ 2. Since you've been at Central San, what accomplishmendtasklaward are you most proud of? 26 8/8/2014 13 DRAFT 8/8/2014 14 DRAFT 8/8/2014 15 DRAFT -There are always areas of opportunity to improve. We do not look at individual performance and no one is "at fault." W This is neither a time and motion study, nor a compensation study. This is all about looking for improvement opportunities to support organizational performance and make it easier to do work and /or reduce risk to the District and staff. 31 8/8/2014 1111,91