Loading...
HomeMy WebLinkAbout10.a. (Handout) Emergency Situation re Sludge Blending Tank/6.4. ( Sludge Blending Tank Emergency Repair Update Edgar Lopez Senior Engineer June 19, 2014 11 Central Contra Costa Sanitary District Protecting Public Health and the Environment Continued Demolition Top bar separated at north side OUMMU M 0D ° M I 4� ::- -1-4i 'C- IW4(�V,,W W14, Ah Emergency Work Status • Completed demolition, removed gunite with severe delamination and cracking. • Discovered 2ndbroken tension bar • Conducted field investigations by structural engineer and tank contractor. • Finalizing reports. • Operations to continue limited use of tank until finishing a permanent repair under the contingency project. - �� Estimated Costs • Currently authorized = $200,000 • Estimated Contractor costs to date _ $ 30,000 • Estimated District Engineering,/Inspection costs to date = $ 20,000 STAFF RECOMMENDATION • Board continue Sludge Blending Tank Emergency using W.C. Maloney, DN Tanks, and District Forces Next steps •Continue tank evaluation. Possibly use non- destructive methods to inspect other rods. • Finish the emergency work by W.C. Maloney and DN Tanks, then demobilize. • Terminate Emergency and continue with the contingency project to evaluate, design and bid appropriate repair. • Come back to the Board to award the repair project and authorize contingency funds as needed. = D