HomeMy WebLinkAbout05.a. Public hearing re Smith Road Contractual Assessment District (CAD) No. 2012-1 in AlamoCentral Contra Costa Sanitary District 5• Q -
' BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: June 19, 2014
Subject. CONDUCT A PUBLIC HEARING, 1) CONFIRM AND LEVY FINAL
ASSESSMENTS FOR SMITH ROAD CONTRACTUAL ASSESSMENT
DISTRICT (CAD) NO. 2012 -1; 2) ADOPT A RESOLUTION DIRECTING
THAT THE 2014 -15 ASSESSMENTS BE COLLECTED ON THE CONTRA
COSTA COUNTY PROPERTY TAX ROLL; AND 3) APPROVE A
PROPOSED ORDINANCE TO ESTABLISH REIMBURSEMENT FEES
FOR THE PROPERTIES WHICH CONNECT TO DISTRICT PROJECT
5773 (SMITH ROAD CAD NO. 2012 -1)
Submitted By: Initiating Dept. /Div.:
Russell Leavitt, Engineering Assistant III Engineering /Environmental Services
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
T. Brightbill, Senior Engineer
D. Gemmell, Environmental Services Division Manager
K. Alm .Roger S. Bail
Counsel for the District General Mana r
ISSUE: Work has been completed on the Smith Road CAD No. 2012 -1 and final
assessments can be established and levied. Board of Directors authorization by
resolution is needed to place charges on the Contra Costa County property tax roll.
When a reimbursement fee is proposed for properties that could connect to sewers
installed by others, the District Code requires that a public hearing be held prior to the
Board of Directors' consideration of the fee.
RECOMMENDATION: Conduct a public hearing; adopt a resolution confirming and
levying final assessments for the Smith Road CAD No. 2012 -1; adopt a resolution
directing that the 2014 -15 assessments be collected on the Contra Costa County
property tax roll, and approve a proposed ordinance to establish reimbursement fees
for the properties which connect to District Project 5773 (Smith Road CAD No. 2012 -1)
in Alamo.
FINANCIAL IMPACTS: This action will allow the District to be reimbursed for project
costs totaling $124,538. If the recommended reimbursement fees are established by
the Board following the public hearing, a CAD participant may, over time, recover the
non - participants' share of the cost of the CAD facilities as non - participants connect.
ALTERNATIVES /CONSIDERATIONS: Not applicable.
BACKGROUND: The Board of Directors ordered improvements for Smith Road CAD
No. 2012 -1 in Alamo at its June 7, 2012 meeting. The area is shown in Exhibit A. The
CAD improvements have been completed and final costs are shown in Exhibit B. The
CAD benefits seven properties. Five property owners are voluntarily participating in this
C: \Users \danderson\AppData \Local \Microsoft \Windows \Temporary Internet Files \Content.Outlook \DVCG8C5G \PP Smith Road
CAD Final Assessment and Reimb 6 -19 -14 Final.doc Page 1 of 4
POSITION PAPER
Board Meeting Date: June 19, 2014
subject: CONDUCT A PUBLIC HEARING, 1) CONFIRM AND LEVY FINAL
ASSESSMENTS FOR SMITH ROAD CONTRACTUAL ASSESSMENT
DISTRICT (CAD) NO. 2012 -1; 2) ADOPT A RESOLUTION DIRECTING
THAT THE 2014 -15 ASSESSMENTS BE COLLECTED ON THE CONTRA
COSTA COUNTY PROPERTY TAX ROLL; AND 3) APPROVE A
PROPOSED ORDINANCE TO ESTABLISH REIMBURSEMENT FEES FOR
THE PROPERTIES WHICH CONNECT TO DISTRICT PROJECT 5773
(SMITH ROAD CAD NO. 2012 -1)
CAD. Based on these final costs, the final assessments for each participating property
have been determined and appear as Exhibit C, Assessment Roll. All five participants
have chosen to include reimbursement fees for downstream special facilities (Jobs
4936 and 5377) in their assessments. The final assessment amounts differ slightly
because of an agreement between the property owners related to the sharing of costs
related to a construction change order and adjustments to the reimbursement costs
based on each property owner's date of connection. The Board is requested to confirm
and levy these final assessments. A resolution (Exhibit D) has been prepared which, if
adopted, will confirm and levy assessments.
A resolution of the Board is needed to place the 2014 -15 assessment for the CAD on
the Contra Costa County property tax roll. This resolution is included as Exhibit E and
includes all participating properties. Participants who pay their assessments up front by
July 18, 2014 will avoid incurring interest and being charged on the tax roll. Those
property owners who do not pay their assessments up front will have chosen to pay
over a ten -year period on the tax bill.
Other property owners who have chosen not to be assessed, and thus have not paid or
financed an assessment, are known as CAD "non- participants." In the future, these
non - participants may connect to the contributed public sewers. When they do so, the
CAD contract specifies that the District will charge them a repayment or reimbursement
fee. Once collected, this fee is disbursed to the prior participants. The amount of the
fee is proportional, based on the final costs and number of participants to date. The
proposed reimbursement fees are summarized in Exhibit 1 of Exhibit E. Of the
remaining two non - participants, the first to connect would pay 1 /6th of the cost
($20,756.50), which would be disbursed to the five original participants. This buy -in
would make the new connector a participant as well, eligible to receive reimbursement
from the second connector, who would pay 1 /7th of the cost ($17,791.29). That
amount would be disbursed to the then six prior participants.
Appropriate notices have been posted, and published in both the Contra Costa Times
and the San Ramon Valley Times. In addition, individual letter notices were mailed to
the owners of all affected properties, as required by District Code.
C:\ Users \danderson\AppData \Local \Microsoft \Windows \Temporary Internet Files \Content.Outlook \DVCG8C5G \PP Smith Road
CAD Final Assessment and Reimb 6 -19 -14 Final.doc Page 2 of 4
POSITION PAPER
Board Meeting Date: June 19, 2014
Subject., CONDUCT A PUBLIC HEARING, 1) CONFIRM AND LEVY FINAL
ASSESSMENTS FOR SMITH ROAD CONTRACTUAL ASSESSMENT
DISTRICT (CAD) NO. 2012 -1; 2) ADOPT A RESOLUTION DIRECTING
THAT THE 2014 -15 ASSESSMENTS BE COLLECTED ON THE CONTRA
COSTA COUNTY PROPERTY TAX ROLL; AND 3) APPROVE A
PROPOSED ORDINANCE TO ESTABLISH REIMBURSEMENT FEES FOR
THE PROPERTIES WHICH CONNECT TO DISTRICT PROJECT 5773
(SMITH ROAD CAD NO. 2012 -1)
RECOMMENDED BOARD ACTION: Conduct a public hearing; adopt a resolution
confirming and levying final assessments for the Smith Road CAD No. 2012 -1; adopt a
resolution directing that the 2014 -15 assessments be collected on the Contra Costa
County property tax roll; and adopt a proposed ordinance (uncodified) to establish
reimbursement fees for sanitary sewer facilities in District Project 5773 (Smith Road
CAD No. 2012 -1).
Attached Supporting Documents:
1. Exhibit A. Approved Boundary and Assessment Numbers
2. Exhibit B. Final Cost Report - June 2012
3. Exhibit C. Final Assessment Roll
4. Exhibit D. Resolution Confirming Final Assessments
5. Exhibit E. Resolution Directing that the 2014 -15 Assessment be Collected on the Contra Costa County
Tax Roll
6. Exhibit F. Ordinance (Uncodified) to Establish Reimbursement Fees for the Properties Which Could
Directly Connect to District Project 5773
C:\ Users \danderson\AppData \Local \Microsoft \Windows \Temporary Internet Files \Content.Outlook \DVCG8C5G \PP Smith Road
CAD Final Assessment and Reimb 6 -19 -14 Final.doc Page 3 of 4
C:\ Users \danderson\AppData \Local \Microsoft \Windows \Temporary Internet Files \Content.Outlook \DVCG8C5G \PP Smith Road
CAD Final Assessment and Reimb 6 -19 -14 Final.doc Page 4 of 4
EXHIBIT B
SMITH ROAD CONTRACTUAL ASSESSMENT DISTRICT
CAD NO. 2012 -1; SEVEN PARCELS
FINAL COST REPORT — JUNE 2012
ITEM
AMOUNT
Construction
8 -inch diameter sewer, manholes, laterals (a), paving
$106,191
Total Construction Cost
$106,191
Private Engineering
Survey and Design
$8,952
Total Private Engineering Cost
$8,952
District Services
Plan Review – Mainline
$2,370
Construction Inspection
$7,025
Total District Costs
$9,395
TOTAL PROJECT COST WITH STREET LATERALS
(CONSTRUCTION + PRIVATE ENGINEERING +
DISTRICT)
$124,538
(a) For portion of lateral sewer in street or right -of -way.
EXHIBIT C
SMITH ROAD CONTRACTUAL ASSESSMENT DISTRICT
CAD NO. 2012 -1
FINAL ASSESSMENT ROLL
ASSESSMENT
NUMBER
PARCEL
DESCRIPTION
PREPAID
AMOUNT
TAX ROLL
ASSESSMENT
AMOUNT
(10 -YR EQUAL
PAYMENTS ) (a
1
196- 070 -015 -9
$27,673.54
$3,720.20
2
196- 070 -007 -6
$32,994.88
$4,435.54
3
196- 070 -008 -4
$32,673.54
$4,392.34
4
196- 100 -001 -3
Not participating
Not participating
5
196- 061 -004 -4
32,899.74
$4,422.76
6
196- 061 -003 -6
Not participating
Not participating
7
196- 061 -015 -0
27,673.54
3,720.20
(a) Interest rate for annual assessments is 6.00 %.
IW:/Ctl:111r�7
RESOLUTION NO. 2014- d/S
A RESOLUTION OF THE CENTRAL CONTRA COSTA SANITARY DISTRICT
CONFIRMING FINAL ASSESSMENTS
FOR SMITH ROAD
CONTRACTUAL ASSESSMENT DISTRICT NO. 2012 -1
WHEREAS, This Board has taken a series of actions preliminary to establishing final
assessments for the Smith Road Contractual Assessment District No. 2012 -1, Central
Contra Costa Sanitary District, Contra Costa County, California.
NOW, THEREFORE, The Board of Directors of the Central Contra Costa Sanitary
District resolves:
The Board adopted its Resolution of Intention (Resolution No. 2012 -016) to order
the improvement described therein under the Municipal Improvement Act of 1911,
and directed Jarred Miyamoto - Mills, Engineer of Work, to prepare the report
required by Section 5898.22 of the Streets and Highways Code.
2. Pursuant to Resolution No. 2012 -17, the Board approved a map showing the
boundaries of the land benefited by the proposed improvement. A copy of the
boundary map was filed in the office of the County Recorder of the County of
Contra Costa in the Book of Assessment and Community Facilities Districts. The
improvement is generally described as follows:
Design and construction of approximately 594 linear feet of 8 -inch
sanitary sewer pipeline and one standard manhole, together with
appurtenant work and facilities located along Smith Road in Alamo,
California.
3. The Board established June 7, 2012, as the date for a public hearing to create the
Smith Road Contractual Assessment District No. 2012 -1.
4. The owners of record were provided ballots 45 days before the hearing on which
owners could indicate approval of or opposition to the imposition of assessments.
5. The Board of Directors conducted a public hearing on June 7, 2012, pursuant to
Section 5898.26 of the Streets and Highways Code and gave every person
present an opportunity to comment on and object to the proposed Contractual
Assessment Program, the improvement and the extent of the Assessment District.
Resolution No. 2014- 0 /"
Smith Road CAD No. 2012 -1
Page 2 of 3
6. The Board found that no written protests against the proposed improvement were
made by owners representing more than one half of the area of the land to be
assessed for the improvement.
7. The Board approved the Engineer's Report and each component part of it,
including each exhibit incorporated by reference in the report, one of which was a
table of estimated assessments.
8. The Board found that the Engineer's Report, fairly and properly apportioned the
cost of the improvement to each parcel of land in the Assessment District in
compliance with the Agreement between the owners and District and in proportion
to the special benefits derived by each parcel, in relationship to the entirety of the
capital cost of the improvement. A draft version of the Agreement, within which
the participating owners voluntarily agreed to the imposition of an assessment,
was attached as an exhibit to the Engineer's Report and was incorporated by
reference.
9. Lastly, the Board ordered the improvement described in paragraph 2 and as
detailed in the Engineer's Report.
10. The work on the improvement has been completed pursuant to a private
agreement entered into by the owners, and was accepted on July 18, 2013. The
final costs for the improvement have been determined; the final assessments for
each property have been determined; and a Notice of Assessment will be sent to
each property owner after the Board confirms the final assessments.
11. The final assessments for each property appear on the Assessment Roll. The
Board hereby confirms and levies each individual final assessment as stated in the
Assessment Roll.
12. Payment of all or any part of such final assessments may be made at the office of
the Permit Section, Central Contra Costa Sanitary District, 5019 Imhoff Place,
Martinez, California 94553. The deadline for receipt of such payment by the
Controller is the close of business on July 18, 2014. Thereafter, unpaid
assessments will be payable in yearly installments of principal and interest at 6.00
percent compounded annually over a period of ten (10) years.
Resolution No. 2014- O/ 6r
Smith Road CAD No. 2012 -1
Page 3 of 3
PASSED AND ADOPTED this 19th day of June, 2014, by the Board of Directors of the
Central Contra Costa Sanitary District by the following votes:
AYES:
Members:
NOES:
Members:
ABSENT:
Members:
David R. Williams
President of the Board of Directors
Central Contra Costa Sanitary District
County of Contra Costa, State of California
COUNTERSIGNED:
Elaine R. Boehme, CIVIC
Secretary of the District
Central Contra Costa Sanitary District
County of Contra Costa, State of California
Approved as to form:
Kenton L. Alm, Esq.
Counsel for the District
EXHIBIT E
RESOLUTION NO. 20114-0/6
A RESOLUTION OF THE CENTRAL CONTRA COSTA SANITARY DISTRICT
DIRECTING THAT THE 2014 -15 ASSESSMENT FOR SMITH ROAD
CONTRACTUAL ASSESSMENT DISTRICT (2012 -1)
BE COLLECTED ON THE CONTRA COSTA COUNTY TAX ROLL
WHEREAS, the Central Contra Costa Sanitary District ( CCCSD) has entered into
written agreements with certain property owners who have formed Contractual
Assessment Districts to pay for sewer improvements over a ten -year period; and
WHEREAS, the CCCSD Code provides that CCCSD may elect to collect current
charges and delinquent charges on the tax roll as provided by Section 5470 and
following, of the California Health and Safety Code; and
WHEREAS, it is considered economical and efficient to collect the assessment for the
Smith Road Contractual Assessment District (2012 -1) for the 2014 -15 fiscal year on the
Contra Costa County tax roll;
NOW, THEREFORE, be it resolved by the Board of Directors of the CCCSD that the
2014 -15 assessment for the Smith Road Contractual Assessment District (2012 -1) is
listed in Exhibit 1 attached hereto and by this reference made a part hereof, may be
collected on the Contra Costa County Tax Roll.
Passed and adopted this 19th day of June, 2014 by the CCCSD Board of Directors by
the following vote:
AYES:
Members:
NOES:
Members:
ABSENT:
Members:
David R. Williams
President of the Board of Directors
Central Contra Costa Sanitary District
County of Contra Costa, State of California
COUNTERSIGNED:
Elaine R. Boehme, CIVIC
Secretary of the District
Central Contra Costa Sanitary District
County of Contra Costa, State of California
Approved as to form:
Kenton L. Alm, Esq.
Counsel for the District
EXHIBIT 1
CAD 2012 -1: Smith Road
Assessor's Parcel Number
Amount
196- 070 -015 -9
$3,720.20
196- 070 -007 -6
$4,435.54
196- 070 -008 -4
$4,392.34
169- 061 -004 -4
$4,422.76
196- 061 -015 -0
$3,720.20
Totals parcels
EXHIBIT F
ORDINANCE NO. , 8'Z
AN ORDINANCE (UNCODIFIED) TO ESTABLISH REIMBURSEMENT FEES FOR
THE PROPERTIES WHICH COULD DIRECTLY CONNECT TO
DISTRICT PROJECT 5773 (SMITH ROAD CAD 2012 -1) IN ALAMO
WHEREAS, the Central Contra Costa Sanitary District (District) Code Chapter 6.20
provides for reimbursement to installers of standard and special facilities from fees
charged property owners when they apply to connect their property to the public
sewer system; and
WHEREAS, District Code Chapter 6.20 provides for the establishment of
reimbursement accounts for constructed standard and special facilities; and
WHEREAS, District Project 5773 (Smith Road CAD 2012 -1), the location of which are
shown in Exhibit 1 of this ordinance, are standard facilities as defined in District Code
Chapter 6.20; and
WHEREAS, reimbursement fees have been calculated by a method consistent
with the District's Contractual Assessment District Program, which calculations are
summarized in Exhibit 2; and
WHEREAS, a properly noticed public hearing to receive comments on the
proposed reimbursement fees was conducted at the District Board of Directors'
regularly scheduled meeting on June 19, 2014.
NOW, THEREFORE, the Board of Directors of 'the Central Contra Costa Sanitary
District does ordain as follows:
Section 1.
The reimbursement fees applicable to properties that connect to District Project
5773 (Smith Road CAD 2012 -1) standard facilities, as set forth in Exhibit 2 of
this ordinance, are hereby established.
Said reimbursement fees have been calculated in the manner required by
the District's Contractual Assessment District Program.
Section 2
The reimbursement fees set forth in Exhibit 2 of this ordinance shall be
administered, adjusted, and collected according to the provisions the District's
Contractual Assessment District Program.
Section 3
This ordinance shall be a general regulation of the District and shall be
published once in the Contra Costa Times and the San Ramon Valley Times,
newspapers of general circulation within the District, and shall be effective on
Ordinance No. 2$Z
Smith Road CAD No. 2012 -1
Page 2 of 2
the eighth calendar day following such publication and shall be effective until
such time as the fees are amended by Ordinance.
PASSED AND ADOPTED by the Board of Directors of the Central Contra Costa
Sanitary District on the 19th day of June, 2014, by the following vote:
AYES:
Members:
NOES
Members:
ABSENT:
Members:
David R. Williams
President of the Board of Directors
Central Contra Costa Sanitary District
County of Contra Costa, State of California
COUNTERSIGNED
Elaine R. Boehme, CIVIC
Secretary of the District
Central Contra Costa Sanitary District
County of Contra Costa, State of California
Approved as to Form:
Kenton L. Alm, Esq.
Counsel for the District
EXHIBIT 2
SMITH ROAD CAD 2012 -1
REIMBURSEMENT FEES FOR DISTRICT PROJECT 5773 (a)
Existing CAD Participants
5
Total Project Cost
$124,538
First Non - participant
Connector ( #6)
1/6 of Subtotal Project Cost
$20,756
Second Non - participant
Connector ( #7)
1/7 of Subtotal Project Cost
$17,791
(a) Reimbursements to Jobs 4936.1, 4936.2 and 5377.2 owed separately.