HomeMy WebLinkAbout07.d.1)e) Action Summary-Engineering & Operations Committee 5-27-14Sanrtaty DishiCf
REGULAR MEETING OF THE BOARD OF DIRECTORS
CENTRAL CONTRA COSTA DAVID R. WILLMMS
SANITARY DISTRICT President
ENGINEERING & OPERATIONS MICHAEL R.MCGILL
President Pro Tent
COMMITTEE PAUL CAUSEY
JAMES A. NEJEDLY
TAD J. PILECKI
ACTION SUMMARY PHONE: (925) 228 -9500
FAX.- (925) 676 -7211
Chair Pilecki www.centralsan.org
Member Causey
Tuesday, May 27, 2014
1:00 P.M.
2 I Floor Conference Room
5019 Imhoff Place
Martinez, California
PRESENT: Chair Tad Pilecki, Member Paul Causey, General Manager Roger Bailey,
Capital Projects Division Manager Andrew Antkowiak, Senior Engineer Sasha
Mestetsky, Senior Engineer Edgar Lopez, Director of Administration David Heath,
Associate Engineer Rita Cheng (left after Item 3.), Associate Engineer Dan Frost (left
after Item 3.), Plant Operations Division Manager Alan Weer (left after Item 3.),
Environmental Services Division Manager Danea Gemmell (left after Item 3.), Senior
Administrative Technician Christina Gee
1. Call Meeting to Order
Chair Pilecki called the meeting to order at 1:00 p.m.
2. Public Comments
None.
*3. Review draft Position Paper authorizing the General Manager to execute an
agreement with Collison Engineering for professional engineering services at a
cost not to exceed $95,000 for Phase 1 of the Zeolite- Anammox Pilot Plant Study
as part of the Plant of the Future Project, District Project 7315
Associate Engineer Rita Cheng gave a presentation (attached) on the proposed
12 -month pilot plant study, providing background on the zeolite- anammox
research, the Phase 1 scope of work, and a description of the pilot plant at Union
Sanitary District. She noted that, since the establishment phase of the pilot plant
Engineering & Operations Committee Action Summary
May 27, 2014
Page 2
study requires warm temperatures, the contract would need to be awarded soon
to take advantage of the imminent summer climate.
Member Causey questioned how this project was related to the other Plant of the
Future projects. Associate Engineer Dan Frost noted that District Project 7287
would be closed out, and Capital Projects Division Manager Andrew Antkowiak
noted that the pilot plant study was a spinoff of DP 7287.
Chair Pilecki asked that, in the future, staff clarify when a new DP number is
assigned to a project.
COMMITTEE ACTION: Reviewed and recommended Board authorization for
the General Manager to execute the contract, with the caveat that staff
explain from where the money is coming and how District Projects 7301,
7287, and 7315 are related. The information requested is below:
The 2011 Treatment Plant of the Future visioning exercise was completed
under the Treatment Plant Master Plan Update, District Project 7287. The
Plant of the Future Roadmap, District Project 7315, was opened in Fiscal
Year (FY) 2013 -14 as a contingency project within the Treatment Plant
Program in order to initiate the Plant of the Future Roadmap project
recommended as a result of the 2011 Treatment Plant of the Future
visioning exercise and related piloting work. District Project 7287 will close
out at the end of Fiscal Year 2013 -14 and is being replaced with District
Project 7315 in the FY 2014 -15 Capital Improvement Budget (CIB) with the
same budget as previously shown for District Project 7287 in the FY 2014 -15
CIB. The FY 2014 -15 estimated expenditures include piloting efforts only.
Additional costs are expected to complete the Plant of the Future Roadmap
project. District Project 7301 is for other current and future treatment plant
planning projects and is not related to District Projects 7287 and 7315. The
pilot work is being included as part of District Project 7315 instead of
District Project 7301 because the pilot and pilot results will be tied into the
Plant of the Future Roadmap.
*4. Review schedule of upcoming bids and awards and discuss change orders over
$50,000
Senior Engineer Edgar Lopez stated that there was one change order for the
Primary Treatment Renovations, District Project 7285, which will be discussed at
the next Committee meeting.
Senior Engineer Sasha Mestetsky distributed a Schedule of Upcoming Bids and
Awards (attached). He noted that the CCTV Sewer Inspection project will be bid
soon and charged as an O &M expense, as previously recommended by the
Committee.
Engineering & Operations Committee Action Summary
May 27, 2014
Page 3
COMMITTEE ACTION: Received the information.
*5. Receive information on the bid for the Walnut Creek Sewer Renovations,
Phase 10, District Project 8413
Mr. Mestetsky distributed a summary of the bids received for the project
(attached), noting that the deadline to withdraw any bids was May 27, 2014. He
also distributed a historical chart of sewer renovation projects to demonstrate
how costs have increased through the years (attached). He stated that the FY
2014 -15 costs for the Walnut Creek Sewer Renovations, Phase 10 project will be
higher than what was listed in the Capital Improvement Budget (CIB) /Capital
Improvement Plan (CIP) Binder, but will be within the 15% contingency.
Chair Pilecki noted that it has been a priority of the Board not to impact a
neighborhood more than once if possible, and consolidating the work in keeping
with this practice likely contributed to the size of the cost of the project.
Member Causey stated his opinion that the project was $700, 000 over budget,
according to the FY 2013 -14 numbers, and questioned the timing of the award.
COMMITTEE ACTION: Received the information. Requested that staff
prepare an announcement for a future Board meeting regarding the high
cost; present the final budget page at the next Committee meeting; and
explain how the total project cost compares to the CIB /CIP numbers in the
Position Paper to be considered by the Board at the July 3, 2014 Board
Meeting.
*6. Receive construction update for Primary Treatment Renovations, District
Project 7285
Mr. Lopez gave an update on the construction (attached).
Chair Pilecki requested that, in the future, the percent of the total contract
amount that change orders represent be listed next to the change order amounts.
COMMITTEE ACTION: Received update.
7. Review draft Position Paper conducting public hearing to consider adopting the
proposed Fiscal Year 2014 -15 Capital Improvement Budget (CIB) and approving
the 2014 Ten -Year Capital Improvement Plan (CIP) (CIB /CIP to be distributed
with the June 5, 2014 Board agenda packet)
Capital Projects Division Manager Andrew Antkowiak noted that staff is working
on making the changes to the CIB /CIP suggested by the Committee at the last
meeting. Staff now has more accurate numbers, which affect the carryover, and
Engineering & Operations Committee Action Summary
May 27, 2014
Page 4
the total authorization will be less and will change again with actual numbers and
authorizations in September 2014.
Member Causey stated that it was difficult for him to recommend the CIB/CIP
without the completed IT Master Plan or Strategic Plan. He noted that he was
inclined to vote against it because he believed it to have issues of transparency,
citing the uncertainty of how the Zeolite - Anammox Pilot Plant Study would be
funded and under what District Project it was included. He stated that he was not
opposed to the projects or budget, but needed to understand what was being
asked for, and did not fully understand the allocations and authorizations.
General Manager Roger Bailey stated that the IT Master Plan and Strategic Plan
did not change the fundamentals of the budget. Staff is working on presenting the
information more clearly, however, a budget is needed to move forward.
COMMITTEE ACTION: Reviewed and recommended the Board conduct the
public hearing to consider adopting the proposed Fiscal Year 2014 -15
Capital Improvement Budget (CIB) and approve the 2014 Ten -Year Capital
Improvement Plan (CIP).
*8. Discuss and receive update on the Sludge Blending Tank Emergency
Mr. Lopez provided pictures of the gunite failure at the top of the Sludge Blending
Tank, which stands 35 -feet high. He stated that it posed a safety hazard and
appeared to be hanging three inches off the tank (the gunite itself is five inches
wide). The failure was attributed to a possible water intrusion behind the gunite
and corrosion of the bar. The tank was originally built over fifty years ago for
digesters, but today it is filled with two to three feet of blended sludge. Staff
would like to hire DN Tanks to knock off the gunite and evaluate the rods, and, to
do so within the necessary timeline, the General Manager would have to declare
an emergency.
COMMITTEE ACTION: Received the update and recommended the Board
declare an emergency at an upcoming Board meeting.
9. Announcements
a. Next meeting scheduled for Monday, June 23, 2014 at 1:00 p.m.
b. Re- bidding of the Plant of the Future Project
General Manager Roger Bailey announced that the Plant of the Future will
be re- scoped and re- advertised to select a consultant according to the
District's selection process. The extent of Plant of the Future and nutrient
issues will be included in the Request for Proposal.
Engineering & Operations Committee Action Summary
May 27, 2014
Page 5
COMMITTEE ACTION: Received the announcements.
10. Suggestions for future agenda items
Member Causey asked when the discussion he requested was to take place
regarding the cost of in -house staffing versus contract inspection services.
He stated that he was concerned by the cost difference of the hourly rates
in the contracts awarded by the Board in April 2014. General Manager
Roger Bailey stated that, since the cost of service study includes a staffing
needs assessment, and staffing issues fall under the purview of the
Administration Committee, it was his preference to consider the matter at
the completion of the study, targeted for the end of December 2014.
Member Causey was comfortable with that approach.
11. Adjournment — at 2:33 p.m.
* Attachment
5/27/2014
• Phase 1 of the Zeolite Anammox Pilot Plant
for nitrogen removal from final effluent
— Execute Professional Engineering Services
Agreement with Collison Engineering
• At a cost not to exceed $95,000
• As part of the Treatment Plant of the Future
project, D.P. 7315
0
Phase 1 Zeolite Anammox
Scope of Work
• 3,000 gal /day volume method system
• Determine site - specific nutrient removal performance
• Estimate capital and operational expenses for a 100,000
gal /day pilot (Phase 2)
• Financial Impacts:
— $95,000 for 12 months
— Equipment rental after 12 months - $2,500 /month
5/27/2014
2
• Significantly lower energy costs
50% aeration cost for aerated and 0% for non- aerated
• Reduced sludge production
• Significantly lower construction costs
• Low O &M cost
• No external carbon
• Effective at any concentration
- Sidestreams, mainstreams, and water re -use
• Less greenhouse gases
- Reduce N20 by at least 50% compared to
conventional nitrification /denitrification
Pilot at Union Sanitary District
• June 2012- December 2013
• Pilot treated 3,500 gal /day of secondary effluent in a
mobile semi - trailer
• Volume Method reactors linked to polishing tanks using
Surface Area Method
• Results:
- > 95% removal for ammonia, and >90% removal for
nitrate
- Majority ammonia removal from 35mg /L --> 10mg /L ( -5hrs)
- Total ammonia removal: 35mg /L -> 1 mg /L (- 10hrs)
1 �
3
Questions?
5/27/2014
Capital Projects Division
Schedule of Upcoming Bids and Awards
Printed; 5/27/2014
DP No.
Project Title
Project
Scheduled
Engineer's
Date Bids
Low Bid
Contractor
Award
Manager
Bid Opening
Estimate
Received
Date
8413
Walnut Creek Sewer Renovations,
Nancy
05/22/14
$ 2,350,000
05/22/14
$ 2,288,000
K. J. Woods
07/03/14
Phase 10
Molina
Sewer CCTV Inspection Project
Alex Rozul
06/03/14
$ 850,000
06/19/14
li
8410
Cathodic Protection, Phase 1
Michael
07/01/14
$ 380,000
107/01/14
Penny
8415
Martinez Sewer Renovations, Phase 4
Michael
03/01/15
$2,000,0001'--
2,000,000
TBD
Penny
8412
Pleasant Hill- Grayson Creek Trunk
Nancy
04/01/15
$'5, 000,OOOt
TBD
Sewer
Molina
7311
TP Safety Enhancements, Phase 4
Brad
TBD
TBD
TBD
Leidecker
7291
Seismic Upgrades for the Pump &
Jason
TBD
TBD
TBD
Blower Building
DeGroot
7297
Wet/Dry Scrubber Replacement
(Clint Shima
TBD
TBD
TBD
7310
TP Piping Renovations, Phase 8
Brad
TBD
TBD
Leidecker
8421
Lafayette Sewer Renovations, Phase 9
Nancy
- - TBD
! TBD
TBD
Molina
I
- - --
* Dates are subject to change.
ATTACHMENT 2
WALNUT CREEK SEWER RENOVATIONS, PHASE 10
DISTRICT PROJECT 8413
SUMMARY OF BIDS
PROJECT NO.: 8413 DATE: MAY 22, 2014
PROJECT NAME: WALNUT CREEK SEWER RENOVATIONS, PHASE 10
PROJECT LOCATION: WALNUT CREEK, CA
NO. OF ADDENDA:
ENGINEER'S ESTIMATE: $2,350,000
NO.
BIDDER
BID PRICE
1
K. J. Woods Construction, Inc.
$2,288,000
San Francisco, CA 94124
2
D'Arcy & Harty Construction, Inc.
$2,584,405
San Francisco, CA 94124
3
Bay Pacific Pipelines, Inc.
$2,730,650
Novato, CA 94947
4
Pacific Trenchless, Inc.
$2,735,909
Oakland, CA 94607
5
Ranger Pipelines, Inc.
$3,291,309
San Francisco, CA 94124
BIDS OPENED BY /s/ Donna Anderson
DATE: May 22, 2014
C:\ Users \smestets\AppData \Local \Microsoft \Windows \Temporary Internet Files \Content.Outlook \WORFY9PQ \8413 Award Contract
PP - WC10.docx Page 5 of 6
r;;-o
YEAR
PROJECT
FOOTAGE
(LF)
ENG EST
LOW BID
ENG EST
($ /LF)
LOW BID
($ /LF)
2014
Walnut Creek, Ph. 10
8,500
$2,350,000
$2,288,000
$276
$269
2014
North Orinda, Ph. 5
7,800
$1,900,000
$1,748,000
$244
$224
2013
Diablo, Ph. 2
9,350
$1,800,000
$2,085,370
$193
$223
2013
Lafayette, Ph. 8
8,300
$1,500,000
$1,321,305
$181
$159
2012
Walnut Creek, Ph. 9
12,000
$2,000,000
$1,688,000
$167
$141
2012
North Orinda, Ph. 4
14,400
$2,100,000
$1,562,091
$146
$108
2011
Walnut Creek, Ph. 8
10,000
$1,700,000
$1,338,000
$170
$134
2011
Lafayette, Ph. 7
14,000
$2,000,000
$1,638,900
$143
$117
2011
South Orinda, Ph. 5
11,000
$2,285,000
$1,538,000
$208
$140
2010
Diablo, Ph. 1
5,900
$1,500,000
$1,304,464
$254
$221
0
Martinez, Ph. 3
5,350
$1,268,000
$959,080
$237
$179
9
r
South Orinda, Ph. 4
11,500
$1,540,000
$1,124,281
$134
$98
9
Lafayette, Ph. 6
13,200
$1,800,000
$1,314,125
$136
$100
Sp
5/28/2014
k0b
Construction Update:
Primary Renovations Project
DP 7285
May 2, 2014
Primary Renovations
• Overall status: —40% Contact work complete.
• Current project focus:
— Performance Test new Huber grit system
— Continuing electrical, transferring equip to Temp
MCC.
— Installation of PLC Panel (RIO)
— PST 4 work (drive shafts, sprockets, bearings,
concrete repair, etc.)
— Concrete coatings — Pre -air and scum hopper
— PE Pump 1 rehabilitation
1
5/28/2014
Grit Washers
i 4
5/28/2014
3
5/28/2014
Concrete Coatings
i
s After —scum hopper coated
Before — scum hopper
t
Primary Effluent Pumps
` � � ice•
It
r �_
VFD Room (Old Electric Shop)
5/28/2014
61
Contract Budget
• Original Contract amount: $ 10,277,000
• Change Orders: $ 244,992
• Total Contract amount: $ 10,521,992
• Payment to WM Lyles: $ 4,526,000 (43 %)
5/28/2014
R
Sludge Blending Tank Emergency g
Picture 1 — Gunite failure at the east side of the tank overhanging the lime equipment.
Picture 2 — zoomed in view of Picture 1 location.
Sludge Blending Tank Emergency
_l
Picture 3 — View of failure from the top of the tank.