Loading...
HomeMy WebLinkAbout05. Inspection Charges for Connection at Foundation Inspection90, Central Contra Costa Sanitary District April 16, 2014 TO: ENGINEERING AND OPERATIONS COMMITTEE VIA: ROGER BAILEY, E E ANAGER DANEA GEMMELK/�MENTAL SERVI ES DIVISION MANAGER TOM GODSEENIOR ENGINEER FROM: KIM STAHL, DEVELOPMENT SERVICES SUPERVISO SUBJECT: INSPECTION CHARGES FOR CONNECTION AT FOUNDATION INSPECTION The current CCCSD procedure for new development projects is that the capacity and inspection fees are collected and the physical connection to the sewer is made when the structure's rough plumbing and roof have been completed ( "Roof and Rough "). If a developer wants to connect when the building foundation is completed, a Special Approval process has been established. This process includes a preconstruction site visit from a CCCSD inspector, the installation of a plug to protect the sewer during construction, a charge for the plug removal inspection and confirmation of the installation of a clean out and overflow protection device, and the payment of all connection fees. Sewer connection at the building foundation phase has become so frequently requested that staff has created a "connection at foundation" fee which consists of the individual inspection fees currently charged under the Special Approval process. Staff is also revising the Standard Specifications to include the "connection at foundation" procedure in the 2014 edition. The connection at foundation fee results in a savings to customers by not having to pay a portion of the Special Approval fee and results in permits being issued faster as special conditions do not need to be drafted and reviewed for each and every project. With this change in procedure a developer will now have the choice to either: 1. connect at Roof and Rough, or 2. connect at the building foundation phase The "connection at foundation" fees, a combination of fees are already in effect, are shown in the table below. April 16, 2014 Page 2 Inspection Charges for Connection at Foundation Inspection All rates are "per sewer connection" N: \ENVRSRV\Board Comm ittees \Engineering & Operations \Inspection Charges for Connection at Foundation Inspection 4-16 - 14.doc "Roof and New Old Fees with a Rough" Fee "Connection at Special Foundation" Fee Approval Residential — up to 4 units $360 $720 $793 Commercial and Multifamily $360 $900 $993 Residential greater than 4 units All rates are "per sewer connection" N: \ENVRSRV\Board Comm ittees \Engineering & Operations \Inspection Charges for Connection at Foundation Inspection 4-16 - 14.doc