Loading...
HomeMy WebLinkAbout03.a.1) Cathodic Protection System Upgrade Cost Breakdown (Old Business)Central Contra Costa Sanitary District Cathodic Protection Upgrade Plan - Collections Systems Cost Estimate San Ramon P.S. /San Ramon FM High 2" Fuel Vent Pipe Replace anode bed & ensure electrical isolation of yard structures. M6 Force Main High M6 Force Main Instal two (2) magnesium anodes and one (1) diode to mitigate unknown interference. Orinda Crossroads P.S. /K -3A FM High Orinda Crossroads Pump Station Install two (2) test stations on force main & install cathodic protection. Lower Orinda P.S. /K -1 FM High Lower Orinda Pump Station Replace five (5) missing test stations on parallel K1 FM. Morgaga P.S. and force main High Moraga P.S. Install 10 amp ICCP system at pump station and install 4 ETS on the alignment. Wagner Ranch P.S. Moderate Wagner Ranch Pump Station Design and install ICCP. San Ramon P.S. /San Ramon FM Moderate San Ramon Force Mains Replace missing foreign pipeline test station on 24" FM at 134 +30, and replace cts on 12" & 14" FM at 98 +58 (post and board only) Bates Blvd Pump Station Moderate Bates Blvd PS Install ICCP (pending decision to replace existing test station) Concord Industrial P.S. Moderate RConcPS Install replacement anode bed. Fairview Pump Station Moderate M4A Force Main Install one (1) test station at manhole at east end of steel pipeline beneath 1 -680 overpass. Camino Tassajara 30" & 20" DI Sewer Pipeline Moderate 30" DI Sewer Pipeline Install four (4) test stations. 3.a.1uw**) $70,000.00 $70,000.00 $5,000.00 $1,500.00 $5,500.00 $85,000.00 $50,000.00 $55,000.00 $15,000.00 $6,000.00 $18,000.00 $12,500.00 $1,500.00 $25,000.00