HomeMy WebLinkAboutENGINEERING & OPERATIONS ACTION SUMMARY 03-17-14I( Central Contra Costa Sanitary District
We 1 -19 TO,vl
REGULAR MEETING OF THE
CENTRAL CONTRA COSTA
SANITARY DISTRICT
ENGINEERING & OPERATIONS
COMMITTEE
ACTION SUMMARY
Chair Pilecki
Member Williams (Alternate)
Monday, March 17, 2014
2:00 p.m.
2nd Floor Conference Room
5019 Imhoff Place
Martinez, California
BOARD OF DIRECTORS:
DAVID R. WILLIAMS
President
MICHAEL R. MCGILL
President Pro Tent
PAUL H CAUSEY
JAMES A. NEJEDLY
TAD J. PILECKI
PHONE: (925) 228 -9500
FAX. (925) 676 -7211
wWW.centralsan.org
PRESENT: Chair Tad Pilecki, Member Dave Williams (Alternate), General Manager
Roger Bailey, Director of Operations Curt Swanson, Capital Projects Division Manager
Andrew Antkowiak, Senior Engineer Sasha Mestetsky, Senior Engineer Edgar Lopez,
Senior Engineer Tom Godsey, Senior Engineer Dana Lawson, Plant Operations
Maintenance Division Manager Neil Meyer, Accountant Amal Lyon, Finance Manager
Thea Vassallo (left after Item 7.), Senior Engineer Dana Lawson (left after Item 9.),
Senior Administrative Technician Christina Gee
1.
2.
3.
Call Meeting to Order
Chair Pilecki called the meeting to order at 2:00 p.m.
Public Comments
None.
Old Business
a. Review staff's responses to questions from the previous meeting:
District
District Project Name
Information Requested
Project
(Responses are included in the Agenda Packet as
No.
Attachment 3.a.)
1)
7272
Electric Blower
Why expenditures to date were such a high
Renovation
percentage of the estimated construction cost
Engineering & Operations Committee Action Summary
March 17, 2014
Page 2
Regarding Item 3. a. 1), Senior Engineer Edgar Lopez reported that the
electric blower project began in 2007, and a total of $441, 000 has been
spent to date, with no design completed yet. The project has, since its
inception, morphed to include nutrient removal evaluations and nitrification
feasibility studies. Staff still plans to perform the work identified in the
original evaluation.
Chair Pilecki suggested that the amount spent on nitrification should be
tracked as such.
COMMITTEE ACTION: Reviewed staff's response to Item 3.a.1).
Deferred Items 3.a.2) and 3.a.3) to a later meeting, when Member
Causey would be present for the discussion.
4. Review Fiscal Year 2014 -15 Capital Improvement Budget (CIB) and 2014 Ten -
Year Capital Improvement Plan (CIP).
Capital Projects Division Manager Andrew Antkowiak gave the PowerPoint
presentation included in the agenda packet, reviewing the proposed Ten -Year
Plan, planned Capital Expenditures, programs and selected projects, and next
steps in the approval process.
Member Williams noted that issues related to responsibility for maintenance of
private sewer laterals are becoming increasingly visible in the wastewater
industry. He suggested that staff review East Bay Municipal Utility District
(EBMUD)'s Regional Private Sewer Lateral Ordinance. He also inquired about
the costs charged by the cities for roadway replacement, noting that if they
become unreasonable, the Board may consider discussing the matter.
Chair Pilecki suggested that for the Fiscal Year Treatment Plant Program and
similar tables, `Annual Expense" be re- categorized as "Estimated Expenditure."
Member Williams inquired as to the costs and scope of the maintenance
agreement with Solar Turbines for the upgrades of the cogeneration system. He
suggested that staff utilize the maintenance staff at EBMUD as a resource, since
they have experience with Solar Turbines as a vendor for similar work.
District
Project
No.
District Project Name
Information Requested
(Responses are included in the Agenda Packet as
Attachment 3.a.)
2)
8410
Cathodic Protection
Breakdown of costs
System U grade
3)
8226
Seismic Improvements
Total cost of moving the HOB staff and a cost
for Headquarters Office
breakdown, including the Board - approved award
Building (HOB)
(lowest bid) plus contingency plus construction
management plus total project cost and pre -bid
expenditures
Regarding Item 3. a. 1), Senior Engineer Edgar Lopez reported that the
electric blower project began in 2007, and a total of $441, 000 has been
spent to date, with no design completed yet. The project has, since its
inception, morphed to include nutrient removal evaluations and nitrification
feasibility studies. Staff still plans to perform the work identified in the
original evaluation.
Chair Pilecki suggested that the amount spent on nitrification should be
tracked as such.
COMMITTEE ACTION: Reviewed staff's response to Item 3.a.1).
Deferred Items 3.a.2) and 3.a.3) to a later meeting, when Member
Causey would be present for the discussion.
4. Review Fiscal Year 2014 -15 Capital Improvement Budget (CIB) and 2014 Ten -
Year Capital Improvement Plan (CIP).
Capital Projects Division Manager Andrew Antkowiak gave the PowerPoint
presentation included in the agenda packet, reviewing the proposed Ten -Year
Plan, planned Capital Expenditures, programs and selected projects, and next
steps in the approval process.
Member Williams noted that issues related to responsibility for maintenance of
private sewer laterals are becoming increasingly visible in the wastewater
industry. He suggested that staff review East Bay Municipal Utility District
(EBMUD)'s Regional Private Sewer Lateral Ordinance. He also inquired about
the costs charged by the cities for roadway replacement, noting that if they
become unreasonable, the Board may consider discussing the matter.
Chair Pilecki suggested that for the Fiscal Year Treatment Plant Program and
similar tables, `Annual Expense" be re- categorized as "Estimated Expenditure."
Member Williams inquired as to the costs and scope of the maintenance
agreement with Solar Turbines for the upgrades of the cogeneration system. He
suggested that staff utilize the maintenance staff at EBMUD as a resource, since
they have experience with Solar Turbines as a vendor for similar work.
Engineering & Operations Committee Action Summary
March 17, 2014
Page 3
COMMITTEE ACTION: Received the presentation.
5. Review schedule of upcoming bids and awards.
COMMITTEE ACTION: Reviewed the schedule.
6. Review current and projected change orders over $50,000, if needed
Mr. Lopez reported that staff had just executed a change order for almost
$50,000 on the Cogeneration Controls Upgrade, District Project 7308, for
removal and reinstallation work on the cogen generator. There was also the
potential for a cost of greater than $50,000 for replacement of the damaged
automated transfer switch at the Maltby Pumping Station. Both change orders
would be performed by the contractor on the Primary Renovations Project,
District Project 7285.
Chair Pilecki suggested passing the information on the Maltby Pumping Station
work to Senior Engineer Dana Lawson for asset management tracking purposes.
COMMITTEE ACTION: Received the report.
*7. Discuss proposed changes to proposed matrix setting forth revised General
Manager authorization limits set forth in the Capital Improvement Program
Budget.
Mr. Antkowiak distributed the Capital Improvement Program (CIP) Authorization
Limits Table 3, indicating changes made by the Board at its February 6, 2014
Board meeting.
The Committee concurred with staff's proposal to include contingency in the
General Manager and Board's authorization limits for individual equipment items
and equipment contingency in the Equipment Budget.
The Committee made no change to the proposed limits for the Individual
equipment items not in the Equipment Budget.
Mr. Antkowiak noted that the suggested $1,000,000 maximum per project above
final project budget could be excessive for smaller projects, given that the
intention of the Committee's changes was to provide oversight of large overruns.
The Committee proposed changing the limits to read "15% of final project budget
up to maximum of $1,000,000 per project" for the General Manager and "Greater
than 15% of final project budget or above $1, 000, 000 maximum per project" for
the Board.
Engineering & Operations Committee Action Summary
March 17, 2014
Page 4
COMMITTEE ACTION: Reviewed and recommended Board approval with
proposed changes. Attached is the table with previous changes made by
the Committee and Board (in red) and new changes made by the
Committee on March 17, 2014 (in blue).
*8. Review draft position paper to authorize the General Manager to execute a
professional engineering services agreement with Carollo Engineers, Inc. in an
amount not to exceed $1.2 million to develop the Treatment Plan of the Future
Roadmap; and approve a supplemental authorization of $1.3 million to the
Treatment Plant Program of the FY 2013 -14 CIB to cover this and other project
elements.
Senior Engineer Randy Schmidt distributed handouts regarding master planning
for facilities and the roadmap envisioned for the Treatment Plant of the Future
(attached).
Chair Pilecki and Member Williams agreed that the current title of District Project
7287, "Treatment Plant Master Plan Update," did not accurately describe the
Plant of the Future, and staff should implement a new District Project, specific to
the "Plant of the Future."
The Committee expressed concerns with reconciling the multi - phased vision for
the project with the variable nature of the potential technologies for the Treatment
Plant. Mr. Schmidt and Director of Operations Curt Swanson explained staff's
approach of the project in phases, noting that the proposed agreement was for
$1.2 million but would be executed and paid in separate parts.
Chair Pilecki suggested that there be a phase in between Phases 2 and 3, to
perform pilot tests as needed, look closely at alternatives, research appropriately
before picking one technology for the roadmap, and spend two to three years of
looking at alternatives before proceeding to Phase 3. Mr. Schmidt clarified that
those actions were envisioned as part of Phase 2.
Member Williams suggested that after Phase 1, assessment of future facility
needs, staff provide a policy -level report to the Board including costs, the current
options of today's technologies, and risks of pilot efforts.
COMMITTEE ACTION: Recommended that staff request the Board table the
Position Paper at the March 20, 2014 Board Meeting, pending re- drafting to
request authorization from the Board for the cost of Phase 1 only
(approximately $620,000).
Engineering & Operations Committee Action Summary
March 17, 2014
Page 5
9. Receive asset management update
Senior Engineer Dana Lawson reported that staff has selected Carollo
Engineers, Inc. after conducting formal interviews with the consultants who
responded to the Request for Proposal (RFP). She stated that the contract
amount was estimated at $96,000 to $97,000, with the possibility of additional
work and costs. Since this amount approaches staffs $100,000 limit, a Position
Paper will be brought to the Board at a later meeting to authorize execution of the
contract.
COMMITTEE ACTION: Received the update.
10. Announcements
a. Next meeting scheduled for Monday, April 21, 2014 at 1:00 p.m.
b. Chair Pilecki announced that he recently visited the new solids
handling facility and witnessed a drill of hauling dewatered solids
from the Emergency Sludge Storage Facility. He noted that the
landfill warned that the District should have a backup plan in place
for discarding the raw sludge. President Williams noted that EBMUD
would likely take the solids, in such an event.
11. Suggestions for future agenda items
None.
12. Adjournment - at 3:36 p.m.
* Attachment
Table 3: Capital Improvement Program Authorization Limits;
ACTION
GENERAL
MANAGER
BOARD OF
DIRECTORS
Approve Capital Plan
None
No limit
Authorize Capital Program budgets
None
No limit
Allocate funds to individual project budgets
Total program budget
No Board
plus contingencyLLl
authorization required
Authorize
Professional Consulting Services
$100,000 or less
Greater than $100,000
Consultant
Technical Consulting Services.
$100,000 or less
Greater than $100,000
Contracts
Professional Eng. Services.
$100,000 or less
Greater than $100,000
Allocate funds from program contingency accounts to
$100,000 or less per
Greater than $100,000
projects not included in the CIB
project?
Individual equipment items and equipment contingency in
$100,000 erless Up
,
the Equipment Budget
to amount specified
Above amount
in Equipment Budget
specified in Equipment
including contingenc
Budget including
contingency
Individual equipment items not in the Equipment Budget
$50,000 or less
Greater than $50,000
Authorize supplemental funds to program budgets/
Not applicable
Sewer Construction
contingency accounts
Fund balance
Allocate funds for project budget overruns after award of
dal prejest
Greater than 15% of
construction contract
budge ?4 15% of final
final project budget3 or
project budget3 up to
above $1,000,000
maximum of
maximum per project.
$1,000,000
abeve final Preiest
per project. above
lie 315% Af fiaal
a
Award construction contracts
$100,000 or less
Greater than $100,000
Authorize
Additive
$100,000 or less
Greater than $100,000
construction
change orders
Deductive
No limit
No Board
authorization required
Subcontractor substitutions
All substitutions
Substitutions protested
unless protested by
by subcontractor
subcontractor
Construction project acceptance
All projects
Informational
announcement to the
Board
Close out project
All projects
Memo provided to the
Board at end of FY
i GA PPGE?MbeF 15, 2044
�'- Limited by the remaining balances of the applicable program budget and contingency account
?Limited by the remaining balance of the applicable program contingency account
¢Final project budget is established at time of award of construction contract
4
There are three major "drivers" for
master planning facilities
Growth
Regulations
Aging Facilities
Improved performance and efficiencies
Expand treatment and permitted capacity
to accommodate planned growth.
Meet existing and anticipated future
regulatory requirements to protect the
environment, and public health and
safety.
Maintain reliability and cost - effectiveness
of existing asset functions.
Minimize the life -cycle cost to benefit
ratio.
The Master Plan inputs and outputs
SCENARIOS
Strategy Table
�45i! ■�
Structural
Non -
Conventiona Conventional
I
Non -
Structural
STRATEGIES
OUTPUTS
-1
ties
it
edule
ipital
penditures
ash Flow
Rates
3/17/2014
go
1
TREATMENT PLANT OF THE FUTURE ROADMAP
MARCH 10, 2014
1) Drivers
a) Rehabilitation /Replacement (Condition)
b) Regulatory Requirement
c) Economic
d) Improved Performance Benefit
e) Increased Capacity Needs
f) Policy Decision
2) Planning Approach
a) Confirm Existing Facilities /Performance
b) Identify Gaps /Needs Analysis
c) Identify Linkages /Alternative Evaluation
d) Optimization & Financial Analysis
e) Project Deliverables and Documentation.
3) Master Planning Workshops
a) Workshop 1 — Visioning, Goals, Objectives & Evaluation Criteria
b) Workshop 2 — Review Future Facility Needs
c) Workshop 3 — Review Alternatives, and Select the Best Apparent
Scenario
d) Workshop 4 - Recommendations and Implementation Plan
Phased Implementation - $1,321,000 (estimates)
Phase 1 - Assessment of Future Facility Needs (Tasks 1 through 4;
Workshops #1 & #2) - $613,000
1.0 Develop Goals & Objectives, Planning Principles, and Evaluation Criteria -
100 000
1.1 Project Control Plan and Outreach Support.
1.1.1 Develop Draft Project Control Plan.
1.1.2 Quality Control /Quality Assurance and Coordination.
1.2 Master Plan Goals, Planning Principles, and Evaluation Criteria
1.2.1 Develop Vision, Goals, and Objectives.
1.2.2 Develop Planning Guidance Principles.
1.2.3 Develop Alternative Evaluation Criteria and Metrics
1.3 Workshop 1 —Visioning, Goals, Objectives & Evaluation Criteria
2.0 Evaluate Existing Information and Data — $37,000
2.1 Description of Existing Facilities
2.2 Assess Past and On -going Studies and Reports.
3.0 Define Existing System and Planning Parameters - $155,000
3.1 Historical Wastewater Flows /Characteristics and Receiving Water Quality
3.1.1 Historical Wastewater Flows.
3.1.2 Historical Wastewater /Receiving Water Characteristics.
3.2 Existing Treatment Plant Performance and Capacity
3.2.1 Existing Treatment Plant Performance
3.2.2 Master Plan Design /Standby Criteria
3.2.3 Capacity Rating of Existing Facilities
3.3 Projected Wastewater Flows /Characteristics and Reuse Demands
3.3.1 Historical and Projected Service Area /Population
3.3.2 Summary of Historical and Projected Water Reuse Demands
3.3.3 Projected Wastewater Flows and Characteristics
4.0 Determine and Evaluate Future Needs - $321,000
4.1 Existing and Anticipated Regulatory Requirements
4.1.1 Review and Summarize Existing Regulations.
4.1.2 Develop Regulatory Scenarios
4.2 Asset Management Plan Review
4.2.1 Existing Asset Management Plan Description
4.2.2 Prioritization and Costs of Repair and Replacement (R &R) Projects
4.2.3 Assess Asset Management Implementation Needs
4.3 Determine Future Treatment Facilities Needs
4.3.1 Existing Process Optimization
4.3.2 Determine Level of Treatment and Capacity Needs
4.4 Workshop #2 - Future Facility Needs And "Spin Out" Projects
Phase 2 — Development of Alternatives, and Selection of the Recommended
Master Plan Scenario (Tasks 5 & 6: Workshop #3) - $593,000
5.0 Identify and Develop Project Alternatives - $404,000
5.1 Identify and Develop Treatment Alternatives
5.1.1 Liquids Treatment Alternatives
5.1.2 Biosolids Treatment/Reuse /Disposal Alternatives
5.1.3 Energy Use and Production Evaluation
5.1.4 Assessment of Impacts and Improvements to Address Global
Climate Change
5.1.5 Odor Control and Air Emission Reduction Evaluation
5.2 Field Assessments of Operating Installations
6.0 Screen and Evaluate Alternatives - $189,000
6.1 Identify and Summarize the Master Plan Alternatives
6.2 Evaluate, rank, and select the recommended Master Plan alternative.
6.3 Workshop #3 - Alternatives Evaluation and Selection of Recommended
Scenario
Phase 3 — Development of the Master Plan Scenario and Implementation
Plan (Tasks 7 through 9: Workshop #4) - $115,000
7.0 Develop Recommended Master Plan Program - $90,000
7.1 Description of Recommended Master Plan Program
7.2 Master Plan Implementation Schedule.
7.3 Estimated Costs and Revenues, CIP Plan, and Financial Plan
7.4 Workshop 4 - Recommendations and Implementation Plan
8.0 Prepare Master Plan Documents - $25,000
8.1 Master Plan Executive Summary
8.2 Master Plan Summary Report
8.3 Master Plan Project Notebooks
9.0 Provide Additional Services
9.1 Provide additional services as necessary and as requested.