Loading...
HomeMy WebLinkAbout07.a. (Handout) Accept the 2013 Recycled Water Quality and Distribution Annual ReportItem No. 7a. 2013 Recycled Water Quality &Distribution Annual Report Melody LaBella Board Meeting March 6, 2014 Central Contra Costa Sanitary District 2013 Recycled Water Report ➢ Required by General Order 96-011 ➢ Report includes all required elements ➢Recycled water quality ➢Recycled water used by customers ➢Tabulation of annual customer site inspections ➢Summary of violations ➢Status of recycled water development I. Q. olardw 1 2013 Recycled Water Report ➢ Recycled Water Quality ➢In compliance ➢ Recycled Water Used ➢200 MG to customers ➢400 MG in Treatment Plant ➢Customer Site Inspections ➢Excellent compliance ➢Missed 2 inspections b Concord Recycled Water Project i 2.3 miles of t CT ' New Pipe 70 million gallons per ® year �. Up to 36 Customers $1.2 million in State and Federal Grants 2 Toilet . Urinal Flushing Projects DVC_ DIABLO VALLEY COLLEGE r _s. TO CONSERVE WATER, THIS 811ILDNG USES a li 7y FECKLED *ATER �- Tu FLUSH TOIET3AUDLrWLS. L � ' 3 Refinery Recycled Water Project ' Central Contra Costa Sanitary District ' CONTRA COSTA ® WATER DISTRICT Prods 1169.Pnblk Hes d3he En ' o Acknowledgements • Water produced by the Treatment Plant and monitored by the Laboratory • Program managed by Engineering Dept. • Distribution system operated by Collection System Operations Dept. • Customer billing by Administration Dept. • Distribution system repairs by CCWD • Board support of Recycled Water Program 4