HomeMy WebLinkAbout07.a. (Handout) Accept the 2013 Recycled Water Quality and Distribution Annual ReportItem No. 7a.
2013 Recycled Water
Quality &Distribution
Annual Report
Melody LaBella
Board Meeting
March 6, 2014
Central Contra Costa Sanitary District
2013 Recycled Water Report
➢ Required by General Order 96-011
➢ Report includes all required elements
➢Recycled water quality
➢Recycled water used by customers
➢Tabulation of annual customer site inspections
➢Summary of violations
➢Status of recycled water development
I. Q.
olardw
1
2013 Recycled Water Report
➢ Recycled Water Quality
➢In compliance
➢ Recycled Water Used
➢200 MG to customers
➢400 MG in Treatment Plant
➢Customer Site Inspections
➢Excellent compliance
➢Missed 2 inspections
b
Concord Recycled Water Project
i
2.3 miles of
t CT ' New Pipe
70 million
gallons per
® year
�. Up to 36
Customers
$1.2 million in State and
Federal Grants
2
Toilet . Urinal Flushing Projects
DVC_ DIABLO VALLEY COLLEGE
r
_s.
TO CONSERVE WATER,
THIS 811ILDNG USES
a li 7y FECKLED *ATER
�- Tu FLUSH TOIET3AUDLrWLS.
L � '
3
Refinery Recycled Water Project
' Central Contra Costa
Sanitary District ' CONTRA COSTA
® WATER DISTRICT
Prods 1169.Pnblk Hes d3he En ' o
Acknowledgements
• Water produced by the Treatment Plant and
monitored by the Laboratory
• Program managed by Engineering Dept.
• Distribution system operated by Collection
System Operations Dept.
• Customer billing by Administration Dept.
• Distribution system repairs by CCWD
• Board support of Recycled Water Program
4