HomeMy WebLinkAboutENGINEERING & OPERATIONS ACTION SUMMARY 02-11-14Central Contra Costa Sanitary District SPECIAL MEETING OF THE BOARD OF DIRECTORS CENTRAL CONTRA COSTA DAVID R.97LLIAMS SANITARY DISTRICT President ENGINEERING & OPERATIONS MICHAEL R.Mro Tem President Pro Tem COMMITTEE PACILH.CAUSEY JAMES A. NEJEDLY TAD J. PILECKI ACTION SUMMARY PHONE: (925) 228 -9500 FAX: (925) 676 -7211 Chair Pilecki www.centralsan.org Member Causey Tuesday, February 11, 2014 2:00 p.m. 2"d Floor Conference Room 5019 Imhoff Place Martinez, California PRESENT: Chair Tad Pilecki, Member Paul Causey, General Manager Roger Bailey, Capital Projects Division Manager Andrew Antkowiak, Senior Engineer Sasha Mestetsky, Senior Engineer Edgar Lopez, Environmental Services Division Manager Danea Gemmell, Senior Engineer Dana Lawson, Plant Operations Maintenance Division Manager Neil Meyer, Secretary of the District Elaine Boehme (left after Item 3.), Senior Administrative Technician Christina Gee 1. Call Meeting to Order Chair Pilecki called the meeting to order at 2:03 p.m. 2. Public Comments None. 3. Set meeting schedule for 2014 Member Causey noted that he would not be able to attend the March 17, 2014 meeting. Secretary of the District Elaine Boehme stated that Board President Williams will serve as Alternate for that meeting. COMMITTEE ACTION: Set the meeting schedule that was attached to the agenda packet and added a meeting on Tuesday, December 9, 2014 at 1:00 p.m. to go over the material for the December 18, 2014 Capital Improvement Budget (CIB) Board Workshop. Engineering & Operations Committee Action Summary February 11, 2014 Page 2 4. Receive Cash Flow Analysis, Change Order Log, Quarterly Reports, and Bid Schedules to compare budgeted versus actual costs The Committee suggested that the Capital Project Summaries be condensed to include only the program /project summary reports and that the Cash Flow Analysis section be removed from future reports. Member Causey expressed concerns with the public's ability to understand the budget the way it is currently presented. General Manager Roger Bailey responded that this concern was being addressed as part of the Information Technology (IT) Master Plan, which will be brought back to the full Board at a later date. The Committee requested that the change order log be rearranged to make the information easier to follow. Member Pilecki requested additional information to explain why the Electric Blower Renovation, District Project 7272, expenditures to date were such a high percentage of the estimated construction cost. The Committee requested that Environmental Services consultant contracts be included in future lists of Active Consultant Contracts. The Committee requested a column be added for the Capital Improvement Plan (CIP) budget in the Bid Schedule section. Member Pilecki requested a breakdown of the costs of the Collection System Cathodic Protection System Upgrade, District Project 8410. COMMITTEE ACTION: Recommended changes to future reports for brevity and clarity. Requested additional information regarding District Projects 7272, and 8410. *5. Receive update on projects with budget overruns within the 15 percent General Manager authority Senior Engineer Edgar Lopez distributed a report regarding the Seismic Improvements for Headquarters Office Building (HOB), District Project 8226, and San Ramon Pumping Station Upgrades, District Project 6003 (attached). COMMITTEE ACTION: Received update and requested the total cost of moving the HOB staff. The Committee also requested to see a cost breakdown, including the Board - approved award (lowest bid) plus contingency plus construction management plus total project cost and pre - bid expenditures. The Committee requested that if a project is approaching a budget overrun within the 15 percent General Manager authority, that the project be brought before the Committee. Engineering & Operations Committee Action Summary February 11, 2014 Page 3 6. Receive update on Asset Management Program Senior Engineer Dana Lawson reported that she has lateraled to oversee the Asset Management group, and P.J. Turnham will be promoted into the group as a Maintenance Planner, effective February 18, 2014. Ms. Lawson stated that she sent a Request for Proposal (RFP) to eight consultants and received three back, from GHD, MWH, and Carollo. General Manager Roger Bailey stated that staff is debating between a centralized program or different software for each division to fit the departments' more specific needs. Centralized programs are standardized across the board, however, they are not as specialized and tend to be more expensive. Staff will bring its recommendation to the Board. Member Causey noted that the current practice of allocating $30 million to the Capital Program does not address the fluctuating needs of maintenance and asset management costs. He asked that staff address this within the framework of what it is doing and suggested working with employees of other agencies with asset management experience. Member Pilecki suggested that the full Board receive an Asset Management update annually. General Manager Roger Bailey stated that after a consultant is selected and more information is gathered on staffing and software needs, the Board will be updated then and at program milestones. COMMITTEE ACTION: Received the update and provided input to staff. *7. Receive construction update on the Primary Renovations Project, District Project 7285 Mr. Lopez gave a PowerPoint presentation (attached) on the Primary Renovations Project, which includes replacement and renovation of the grit system, primary equipment, scum thickener, primary effluent pumps, and primary effluent valves; installation of new MCC and electrical, and installation of VFDs. The original contract amount budget was $10,2 77, 000, with $29,124 in change orders to date. COMMITTEE ACTION: Received the update. *8. Receive update on the Pleasant Hill — Grayson Creek Trunk Sewer Project, District Project 8412 (referred to the Committee by the Board at its February 6, 2014 meeting) Senior Engineer Sasha Mestetsky provided information on the project, supplemental maps, and Ten -Year Program estimated Collection System expenditures (attached). He explained that the budget was higher than in the Engineering & Operations Committee Action Summary February 11, 2014 Page 4 CIB because multiple projects were combined. Member Causey noted that combining projects was fine with him as long as staff keeps the Board informed. COMMITTEE ACTION: Received the update and recommended Board approval of the Pleasant Hill - Grayson Creek Trunk Sewer, District Project 8412, for California Environmental Quality Act (CEQA) /permitting purposes. 9. Announcements a. Staff determined that the California Environmental Quality Act (CEQA) compliance section is not required to be included in the Capital Improvement Budget (CIB) and Ten -Year Plan document. The CEQA section will be removed from the Fiscal Year 2014 -15 CIB /Plan b. Next meeting scheduled for Monday, March 17, 2014 at 1:00 p.m. COMMITTEE ACTION: Received the announcements. 10. Suggestions for future agenda items None. 11. Adjournment.— at 4:50 p.m. * Attachment st PROJECT BUDGET OVERRUNS WITHIN THE 15% GM AUTHORITY 2/11/14 ENGR. & OPS COMMITTEE MEETING SIESMIC IMPROVEMENTS FOR HOB, DP 8226: Budget: Board - approved total budget at construction award: $ 5,716,000 General Manager's allocation of funds for project budget overruns —4% . Add: $ 225,000 New Total Project Budget: $ 5,941,000 Total Estimated Costs in 13/14 CIB: $ 6,221,000 Major overrun contributors: - Higher costs due to lead issues, includes abatement costs and associated consultant work. -Costs for moving HOB staff was more than anticipated. -Final closeout and staff time is taking longer than expected due to subcontractor issues. Additional staff time is most likely needed for the project. SAN RAMON PS UPGRADES, DP 8226: Board - approved total budget at construction award: $ 402,000 General Manager's allocation of funds for project budget overruns —12% . Add: 50,000 New Total Project Budget: $ 452,000 Total Estimated Costs in 13/14 CIB: $ 457,000 Major overrun contributors: These additional funds will be used for extra work requested by the Collection System Operations group. The work consists of upgrading the communications between the newly installed pump and motor vibration sensor and the District's Wonderware SCADA program and screens. This work was not included in the original Contract. CAEngineering \8226 & 6003 Overrun Memo v2.doc Item No. 7 Construction Update: Primary Renovations Project DP 7285 February 11, 2014 Project Information • NTP July 15, 2013 • 840 Calendar Days to complete all work • Contractor, WM Lyles (General) and Steiny (Electrical sub) • Designer, HDR • District staff - Clint Shima (PM), Noe Meza, and Paul Fuentes 2/10/2014 1 Background • Primary Tanks constructed in mid 60s and early 70s. • Scope of work: — Replace grit system with new washers (Huber) — Renovate primary equipment and scum thickener — New MCC and electrical — Rehab two Primary Effluent Pumps and install VFDs — Rehabilitation of existing primary effluent valve Grit Washer • Winter installation • Huber Technology • Two Units (400 gpm /ea.) • 304 stainless steel Unloading grit equipment L 2/10/2014 2 j Grit Equipment Coating Grit Piping Screw Conveyors Primary Sedimentation Tank Equipment • Starting in May 2014 • Replace 3W Sprays • Replace scum skimmers • Replace sludge shafts and drives • Install baffles • Replace MCC and RIO Panel • Next winter replace Walker Process Scum Thickener Temporary MCC 2/10/2014 3 Primary Effluent Pumps • Two 600 -hp Flowserve pump rehab • Siemens Robicon VFD • Pump equipment scheduled to arrive mid -April VFD Room (Old Electric Shop) Cogeneration Generator The generator weighs 11 -tons and required electrical and mechanical work to allow clearance. This is change order work. L 2/10/2014 4 • Original Contract amount: • Change Orders: • Total Contract amount: • Payment to WM Lyles: $ 10,277,000 $ 29,124 $ 10,306,124 $ 1,310,000 (13 %) • Original Schedule showed project spending $ 2.9 million to 1/31/14. Actual spending is $ 1.6 million. Construction off to slow start. Questions? 2/10/2014 5 t Pleasant Hill — Grayson Creek Trunk Sewer Project Manager, Department/Division: Sasha Mestetsky, Engineering /Capital Projects Project Description: The Collection System Master Plan 2010 Update analyzed the District's entire sewer system using an updated ArcSNAP hydraulic model. The design flows to the sewers in this project corridor were calculated at 130% to 270% of full pipe capacity. The capacity deficient sewers includes a 12 -inch pipe that runs along Mercury Way from Pleasant Hill Rd. and connects into a 15 -inch sewer that runs parallel to Grayson Creek to Milburn Dr. The recommended project involves installing approximately 5,000 feet of 18 -inch and 24 -inch relief sewers and diverting the sewage away from the capacity deficient sewers. The relief sewer alignment is within city streets and extends from Pleasant Hill Rd. along Westover Dr., then Maureen Ln and Elinora Dr. The relief sewer will connect to a 36 -inch trunk sewer at Elinora Dr. and Ardith Lane. The City of Pleasant Hill expects to receive grant funding for paving. The District may need to include replacement of additional sewer lines to this project to avoid work in the proposed paving areas. Project Schedule and Cost: Start Date Completion Date Total Cost Planning - - $0 Design 07/01/2012 04/01/2013 $0 Construction 04/01/2013 06/30/2015 $2,900,000 Total: $2,900,000 Estimated expenditures this FY are: $800,000 Anticipated Allocations this FY are: $800,000 Project Fiscal Year Allocation /Expenditure Table: Project Title /Subprogram: Project NumberlFilename: Project Manager,% Expansion: Pleasant Hill - Grayson Creek Trunk / 3 8412 / trunk_Ph_graysoncrk Mestetsky / 0 2012 -13 2013 -14 2014 -15 2015 -16 2016 -17 2017 -18 A. Current Carry-over 0 0 0 0 0 0 B. Anticipated Allocations 500,000 800,000 1,600,000 0 0 0 C. Authorized this Year 500,000 800,000 1,600,000 0 0 0 D. Estimated Expenditures (500,000) (800,000) (1,600,000) 0 0 0 E. Estimated Carry-over 0 0 0 0 0 0 2013 -14 CIB Collection System Program Page 36 T-1 N L 46 aOre n (Y OV Figure 5-3 Capacity Deficiencies and Improvements for Corridor C4-A: Pleasant Hill - Pleasant Hill Road/Grayson Creek Percent Full Pipe Capacity New Pipe Diameter -4 24" Project Corridor CCCSD Collection System Master Plan Update 2010 2040 Development, 5-year Event (sized for 2040 development, 20-year event) No Slope or Invert Elev New or Modified Pipe � —T� <=100% Existing Pipe Diameter 12" 0 500 1,000 2,000 3,000 M = Feet >100% to < =130% Creek RMC Water and Environment, 2010 >130% Waterbody 2013 Capital Improvement Plan Page 25 Ten -year Program Estimated Expenditures - Collection System 'Yeo,-+ I Y6a,- 2 V;rear 3 q Start feaV Proj # Project Title Year Manager 2013 -14 2014 -15 2015 -16 2016 -17 2017 -18 2018 -19 2019 -20 2020 -21 2021 -22 2022 -23 Totals 1 - Renovation 5991 Pleasant Hill Sewer Renovations - 12/08 Mestetsky 0 250,000 2,100,000 0 0 0 0 0 0 0 2,350,000 5976 Diablo Renovations - ph 2 08/09 Wenslawski 1,5oo,000 600,000 0 0 0 0 0 0 0 0 2,100,000 8405 2013 & 2014 CIPP Project 07/10 Mestetsky 2,500,000 150,000 1,800,000 0 0 0 0 0 0 0 3,450,000 5999 CIPP Blanket Contract 07/10 Molina 100,000 100,000 0 0 0 0 0 0 0 0 200,000 5955 Suspended Pipe Support 07/10 Mestetsky 40,000 0 0 0 0 0 0 0 0 0 40,000 5982 Pipeburst Blanket Contract 07/10 Rozul 100,000 100,000 0 0 0 0 0 0 0 0 200,000 8404 Lafayette Sewer Renovation - ph 8 07/10 Molina 1,800,000 10,000 0 0 0 0 0 0 0 0 2,110,000 5948 TV Inspection Program - ph 2 07/10 Rozul 800,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 0 0 0 6,800,000 5973 North Orinda Sewer Renovations - 08/10 Mestetsky 10,000 0 0 0 0 0 0 0 0 0 1 0,000 8401 Walnut Creek Sewer Renovations -13 07/11 Antkowiak 1,000 0 0 0 0 0 0 0 0 0 1,000 pCS22 Concrete Pipe Renovation Program 07/12 Mestetsky 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 0 9,000 8413 Walnut Creek Sewer Renovations - (D 07/12 Molina 1,000,000 1,200,000 0 0 0 0 0 0 0 0 2,200,000 8410 Cathodic Protection System 07/12 Mestetsky 50,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 0 850,000 pCS40 Collection System Urgent Projects - 07/12 Mestetsky 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 0 450,000 8415 Martinez Sewer Renovations Phase 4 07/12 Wenslawski 250,000 1,800,000 0 0 0 0 0 0 0 0 2,225,000 pCS36 Lafayette Sewer Renovations - ph 9 07/12 Mestetsky 250,000 1,800,000 0 0 0 0 0 0 0 0 2,200,000 8411 North Orinda Sewer Renovations - 07/12 Wenslawski 250,000 2,000,000 0 0 0 0 0 0 0 0 2,000,000 pCS99 Watershed 44 Creek Xing 07/12 Mestetsky 50,000 0 0 0 0 0 0 0 0 0 50,000 8417 Survey Monument Installation 10/12 St. John 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 0 450,000 pCS42 North Orinda Sewer Renovations - 07/13 Antkowiak o 250,000 1,600,000 0 0 0 0 0 0 0 2,200,000 none Lafayette Sewer Renovations - ph 07/14 Antkowiak 0 250,000 2,100,000 0 0 0 0 0 0 0 2,350,000 none Walnut Creek Sewer Renovations - 07114 Antkowiak o 0 0 250,000 2,000,000 0 0 0 0 0 2,250,000 none North Orinda Sewer Renovations - 07/14 Antkowiak o 250,000 2,100,000 0 0 0 0 0 0 0 2,350,000 none Walnut Creek Sewer Renovations - 07/15 Antkowiak 0 0 0 0 250,000 2,000,000 0 0 0 0 2,250,000 none Walnut Creek Sewer Renovations - 07/15 Antkowiak o 0 250,000 2,000,000 0 0 0 0 0 0 2,250,000 none South Orinda Sewer Renovations - 07/15 Antkowiak o 0 250,000 2,000,000 0 0 0 0 0 0 2,250,000 none Diablo Renovations - ph 3 07/15 Antkowiak o 0 250,000 2,000,000 0 0 0 0 0 0 2,250,000 none Lafayette Sewer Renovations - ph 07/15 Antkowiak 0 0 250,000 2,000,000 0 0 0 0 0 0 2,250,000 pCS32 Pleasant Hill Sewer Renovations - 07/15 Mestetsky 0 0 250,000 2,000,000 0 0 0 0 0 0 2,250,000 none Martinez Sewer Renovations - ph 5 07/16 Antkowiak 0 0 0 250,000 1,800,000 0 0 0 0 0 2,050,000 none Pleasant Hill Sewer Renovations - 07116 Antkowiak 0 0 0 250,000 1,600,000 0 0 0 0 0 2,050,000 none Lafayette Sewer Renovations - ph 07/16 Antkowiak 0 0 0 250,000 2,000,000 0 0 0 0 0 2,250,000 none Walnut Creek Sewer Renovations - 07/16 Antkowiak o 0 0 0 0 250,000 2,000,000 0 0 0 2,250,000 none South Orinda Sewer Renovations - 07/16 Antkowiak 0 0 0 250,000 2,100,000 0 0 0 0 0 2,350,000 none South Orinda Sewer Renovations - 07/17 Antkowiak o 0 0 0 250,000 2,100,000 0 0 0 0 2,350,000 2013 Capital Improvement Plan Page 25 Ten -year Program Estimated Expenditures - Collection System (continued) 2013 Capital Improvement Plan Page 26 Start Proj # Project Title Year Manager 2013 -14 2014 -15 2015 -16 2016 -17 2017 -18 2018 -19 2019 -20 2020 -21 2021 -22 2022 -23 Totals none Walnut Creek Sewer Renovations - 07/17 Antkowiak 0 0 0 0 0 0 280,000 2,100,000 0 0 2,380,000 pCS23 Walnut Creek Civic Center Main 07/17 Mestetsky 0 0 0 0 200,000 1,500,000 0 0 0 0 1,700,000 none Lafayette Sewer Renovations - ph 07/17 Antkowiak 0 0 0 0 250,000 2,100,000 0 0 0 0 2,350,000 pCS06 Mount Diablo Blvd Main 07/17 Mestetsky 0 0 0 0 213,000 2,000,000 0 0 0 0 2,213,000 none Locust Street Improvements 07/18 Mestetsky 0 0 0 0 0 450,000 2,600,000 0 0 0 3,050,000 none North Main Trunk Improvements 07/18 Mestetsky 0 0 0 0 0 300,000 1,700,000 0 0 0 2,000,000 none Walnut Creek Sewer Renovations - 07/19 Antkowiak 0 0 0 0 0 0 0 0 300,000 2,000,000 2,300,000 none Walnut Creek Sewer Renovations -: 07/20 Antkowiak 0 0 0 0 0 0 0 300,000 2,100,000 0 2,400,000 pCS11 TV Inspection Program - Phase 3 07/20 Antkowiak 0 0 0 0 0 0 0 1,000,000 1,000,000 1,000,000 3,000,000 none A -Line Relief -39 Inch Rehab 08/20 Antkowiak 0 0 0 0 0 0 0 100,000 1,829,000 200,000 2,129,000 none Collection System Renovation 07/13 Mestetsky 50,000 100,000 100,000 100,000 100,000 1,600,000 3,300,000 9,500,000 7,700,000 0 22,550,000 none Collection System Renovation LT 07/22 Mestetsky 0 0 0 0 0 0 0 0 0 7,000,000 7,000,000 2 - Reg. Compliance/Planning/Safety 5993 Forcemain Assessment 07/09 Waples 50,000 50,000 0 0 0 0 0 0 0 0 100,000 5962 Manhole Remote Level Monitoring 07/09 Waples 100,000 100,000 0 0 0 0 0 0 0 0 200,000 8418 Collection System Modeling 07/12 Waples 250,000 50,000 50,000 50,000 50,000 0 0 0 0 0 450,000 PCS41 Collection System Planning - Long 07/13 Waples 120,000 120,000 120,000 120,000 120,000 170,000 170,000 170,000 170,000 170,000 1,450,000 none Manhole Remote Level Monitoring - 07/15 Rhoads 0 0 100,000 100,000 100,000 100,000 100,000 0 0 0 500,000 3 - Expansion ytt1r f I Y�-Z f yvd t- 3 1 Yew k 5937 Alhambra Vly Assmt Districts 11/07 Leavitt 5,000 0 0 0 0 0 0 0 0 0 5,000 8402 Contractual Assessment Districts 07/11 Leavitt 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 0 0 4,000,000 pCS33 Trunk Sewer Expansion Program 07/12 Mestetsky 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 0 9,000 8412 Pleasant Hill - Grayson Creek Trunk 07/12 Mestetsky 800,000 1.600,000 0 0 0 0 0 0 0 0 2,400,000 pCS17 Development Sewerage - Capital 07/13 Godsey 681,000 800,000 800,000 800,000 800,000 800,000 800,000 800,000 800,000 800,000 7,881,000 PCS09 San Ramon Sched C Interceptor - 07/13 Mestetsky 5,000 400,000 2,600.000 0 0 0 0 0 0 0 3,005,000 pCS08 Lancaster Rd WC, Tr 13 -600 07/15 Mestetsky 0 0 250,000 1,600,000 0 0 0 0 0 0 1,850,000 pCS20 Moraga Way Orinda, Tr 10- 200/300 07/16 Mestetsky 0 0 0 500,000 2,000,000 0 0 0 0 0 2,500,000 pCS38 Pleasant Hill Road Corridor 07/17 Mestetsky 0 0 0 0 235,000 965,000 0 0 0 0 1,200,000 none Martinez Alhambra Avenue Trunks 07/18 Mestetsky 0 0 0 0 0 600,000 1,250,000 2,050,000 50,000 0 3,950,000 none Walnut Creek - Walnut Blvd Corridor- 07/18 Rozul 0 0 0 0 0 200,000 1,700,000 0 0 0 1,900.000 pCS18 Trunk Sewer Expansion Program - LT 07/19 Antkowiak 0 0 0 0 0 0 1,000 1,000 1,000 1,000 4,000 none Lafayette - Happy Valley Road 07/20 Mestetsky o 0 0 0 0 0 0 200,000 1,000,000 0 1,200,000 none A- Line -Phase 2B 07120 Mestetsky 0 0 0 0 0 0 0 . 50,000 100,000 7,500,000 7,650,000 PCS10 Walnut Creek - Palmer Road 07/20 Mestetsky 0 0 0 0 0 0 0 50,000 300,000 500,000 850,000 none Contractual Assessment Districts - 07/21 Leavitt 0 0 0 0 0 0 0 0 500,000 500,000 1,000,000 none Nelson Ave Sewer Repl 07/22 Mestetsky o 0 0 0 0 0 0 0 0 70,000 70,000 none Lafayette Lower Pleasant Hill Road 07122 Mestetsky 0 0 0 0 0 0 0 0 0 257,000 257,000 none Diablo Rd Dan, Tr 3,9-400 Phase 1 07122 Mestetsky 0 0 0 0 0 0 0 0 0 100,000 100,000 2013 Capital Improvement Plan Page 26