Loading...
HomeMy WebLinkAbout08.a. (Handout) DAF Tank No. 1 Emergency Repair Updates (144ndm4- Item 8.a DAF Tank No. 1 Emergency Repair Update Clint Shima, P.E. Associate Engineer June 20, 2013 Central Contra Costa Sanitary District Emergency Repair Timeline • April 19 - DAF Tank No. 1 failed • May 2 - Board authorizes emergency repairs • May 3 - Repair Work Begins • June 10 - DAF Tank No. 1 back in service so 17 New Arms Installed Torque Testing DAF Tank No. 1 _ CD� Future Work • Started contingency capital project for evaluation and design • Inspected DAF Tank Nos. 2 & 3 for future work scope • Minor repairs made by Plant Maintenance • Maintenance will replace original drive on DAF Tank No. 2. (planned prior to failure of DAF No. 1) • Will return to the Board with a recommended improvement project 3 Estimated Costs • Currently Authorized = $250,000 • Estimated Contractor /Vendor Costs = $175,000 • District Engineering/Inspection costs being tracked as part of DP 7298, TP Piping Renovations, Phase 7. Estimated at $50,000. Summary /Staff Recommendation • Receive the report • Terminate emergency DAF tank repair situation in accordance with Public Contract Code 22050(c)(3) llv'r � 4