' BOARD OF DIRECTORS 6.a.
POSITION PAPER
Board Meeting Date: June 6, 2013
Subject., AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE
GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS
SUBJECT TO SUBMITTAL REQUIREMENTS WITH BRIDGE MASTERS,
INC. FOR THE CONSTRUCTION OF THE SUSPENDED PIPE SUPPORT
EVALUATION AND REPAIR, DISTRICT PROJECT 5955
Submitted By. Initiating Dept. /Div.:
Richard Foss, Assistant Engineer Engineering / Capital Projects
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
M. Penny — Associate Engineer e 7
S. Mestetsky — Senior Engineer c. swanson
A. Antkowiak — Capital Projects Division Manager Provisional General Manager
ISSUE: On May 23, 2013, two (2) sealed bids were received and opened for the
construction of the Suspended Pipe Support Evaluation and Repair, District
Project 5955. The Board of Directors must award the contract or reject bids within 50
days of the bid opening. Authorize the General Manager to execute the contract
documents subject to SUBMITTAL requirements.
RECOMMENDATION: Award a construction contract, and authorize the General
Manager to execute the Contract Documents subject to favorable review of insurance
certificates, bond submittals, appropriate Contractor license, and any other required
submittals (SUBMITTALS).
FINANCIAL IMPACTS: Approximately $392,000, including design, bid price,
contingency, and construction management.
ALTERNATIVES /CONSIDERATIONS: Reject all bids, which is not recommended.
BACKGROUND: In 2009, the structural supports failed for a 20 -inch recycled water
pipeline crossing Grayson Creek. Based on this experience, District staff, with the
assistance of a consultant structural engineer (TJC and Associates, Inc.), undertook a
project that identified and evaluated 53 pipes suspended from bridges throughout the
District service area. Of the 53 suspended pipe crossings, 41 were deemed to be
adequate, and 12 needed a more in -depth structural evaluation. After the more
detailed evaluation, staff determined that 8 pipe support systems needed modifications
or replacement to protect the pipes from seismic events. All repairs will be conducted in
the vicinity of active creeks, which require an extensive permitting process because of
the temporary scaffolding to support the pipes and construction workers, and measures
to protect the creek environment. District staff have applied and obtained permits with
the cities of San Ramon, Pleasant Hill, Orinda, Lafayette, the Town of Danville, Contra
C:\ Users \danderson\AppData \Local \Microsoft \Windows \Temporary Internet Files \Content.Outlook \DVCG8C5G \5955 Award PP -
Suspended Pipe Support.doc Page 1 of 5
POSITION PAPER
Board Meeting Date: June 6, 2013
Subject., AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL
MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO
SUBMITTAL REQUIREMENTS WITH BRIDGE MASTERS, INC. FOR THE
CONSTRUCTION OF THE SUSPENDED PIPE SUPPORT EVALUATION
AND REPAIR, DISTRICT PROJECT 5955
Costa County, Flood Control, and the California Department of Fish and Wildlife. The
suspended pipe locations are shown in Attachment 1.
TJC and Associates, Inc. and District staff prepared plans and specifications for the
project. The Engineer's estimate for construction of the Suspended Pipe Support
Evaluation and Repair, District Project 5955, is $120,000. This project was advertised
on May 6 and 13, 2013. Two (2) sealed bids ranging from $125,215.80 to $277,000
were received and publicly opened on May 23, 2013. The Engineering Department
conducted a technical and commercial review of the bids and determined that Bridge
Masters, Inc. is the lowest responsive bidder with a bid amount of $125,215.80. A
summary of bids received is shown in Attachment 2.
The District will administer the construction contract and will provide contract
administration, inspection, survey, office engineering, and submittal review. The funds
required to complete this project, as shown in Attachment 3, are $202,000. The total
cost of the Suspended Pipe Support Evaluation and Repair is anticipated to be
$392,000. The engineering level of effort to evaluate all 53 sites, combined with
extensive coordination to obtain environmental permits, and the special nature of the
work, resulted in the higher total project cost.
This project is included in the fiscal year (FY) 2012 -2013 Capital Improvement Budget
(CIB) on page CS -27. Staff has conducted a cash -flow analysis of the Collection
System Program budget and concluded that adequate funds are available for this
project.
The Board found this project exempt from the California Environmental Quality Act at its
July 19, 2012, Board meeting.
RECOMMENDED BOARD ACTION: Staff recommends the following:
Award a construction contract in the amount of $125,215.80 for the construction
of the Suspended Pipe Support Evaluation and Repair, District Project 5955, to
Bridge Masters, Inc., the lowest responsive bidder, and
2. Authorize the General Manager to execute the Contract Documents subject to
SUBMITTAL requirements.
Attached Suoportinq Documents:
1. Project Location Map
2. Summary of Bids
3. Post -Bid /Preconstruction Estimate
C:\ Users \danderson\AppData \Local \Microsoft \Windows \Temporary Internet Files \Content.Outlook \DVCG8C5G \5955 Award PP -
Suspended Pipe Support.doc Page 2 of 5
ATTACHMENT 1
C:\ Users \danderson\AppData \Local \Microsoft \Windows \Temporary Internet Files\Content.Outlook \DVCG8C5G \5955 Award PP
Suspended Pipe Support.doc Page 3 of 5
ATTACHMENT 2
SUSPENDED PIPE SUPPORT EVALUATION AND REPAIR
DISTRICT PROJECT 5955
SUMMARY OF BIDS
PROJECT NO.: 5955 DATE: MAY 23, 2013 / 2 PM
PROJECT NAME: SUSPENDED PIPE SUPPORT EVALUATION AND REPAIR
PROJECT LOCATION: VARIOUS LOCATIONS IN PLEASANT HILL, LAFAYETTE,
ORINDA, WALNUT CREEK, ALAMO, SAN RAMON, AND DANVILLE
NO. OF ADDENDA: 1
ENGINEER'S ESTIMATE: $120,000
NO.
BIDDER
BID PRICE
1
Bridge Masters, Inc.
$125,215.80
Bend, OR 97701
2
Pacific Infrastructure Corporation
$277,000
Pleasanton, CA 94566
BIDS OPENED BY /s/ Elaine Boehme, CMC
DATE: May 23, 2013
C:\ Users \danderson\AppData \Local \Microsoft \Windows \Temporary Internet Files \Content.Outlook \DVCG8C5G \5955 Award PP -
Suspended Pipe Support.doc Page 4 of 5
ATTACHMENT 3
SUSPENDED PIPE SUPPORT EVALUATION AND REPAIR
DISTRICT PROJECT 5955
POST -BID / PRECONSTRUCTION ESTIMATE
No.
Item Description
Amounts
% Construction Cost
1.
CONSTRUCTION
a. Construction Contract
$125,216
b. Contingency at 20%
$25,784
c. Permits
$12,000
SUBTOTAL - CONSTRUCTION COST
$163,000
100%
2.
CONSTRUCTION MANAGEMENT
a. District Forces
- Inspection
$34,000
- Construction Management
$16,000
- Public Relations
$2,000
b. Consultants
- TJC and Associates, Inc.
$7,000
- Material Testing
$7,000
- Biologist
$3,000
SUBTOTAL - CONSTRUCTION MANAGEMENT
$69,000
44%
3.
PREBID EXPENDITURES
a. District Engineering*
$81,000
52%
b. TJC and Associates, Inc.
$51,000
33%
c. Permits (Cities, County, Fish and Wildlife, and
$28,000
18%
Flood Control)
SUBTOTAL - PREBID EXPENDITURES
$160,00 0
103%
4.
TOTAL PROJECT COST
$392,000
5.
FUNDS AUTHORIZED TO DATE
$190,000
6.
ADDITIONAL ALLOCATION NEEDED TO
COMPLETE PROJECT Line 4 - Line 5)
UO2.000
*Includes initial identification and evaluation of 53 sites and extensive coordination to obtain environmental permits.