HomeMy WebLinkAbout06.b. Award contract re Lafayette Sewer Renovations, Phase 8, DP 8404Central Contra Costa Sanitary District BOARD OF DIRECTORS 6 , b POSITION PAPER Board Meeting Date: March 21, 2013 subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH CARONE & COMPANY, INC. FOR THE CONSTRUCTION OF THE LAFAYETTE SEWER RENOVATIONS, PHASE 8, DISTRICT PROJECT 8404 Submitted By: Initiating Dept./Div.: Nancy Molina, Associate Engineer Engineering /Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: S. Mestetsky — Senior Engineer A. Antkowiak — Capital Projects Division Manager C. Swanson Provisional General Manager ISSUE: On March 5, 2013, five (5) sealed bids were received and opened for the construction of the Lafayette Sewer Renovations, Phase 8, District Project 8404. The Board of Directors must award the contract or reject bids within 50 days of the bid opening. Authorize the General Manager to execute the contract documents subject to SUBMITTAL requirements. RECOMMENDATION: Find that the project is exempt from the California Environmental Quality Act (CEQA), award a construction contract, and authorize the General Manager to execute the Contract Documents subject to favorable review of insurance certificates, bond submittals, appropriate Contractor license, and any other required submittals (SUBMITTALS). FINANCIAL IMPACTS: Approximately $2,379,500, including design, bid price, contingency, and construction management. ALTERNATIVES /CONSIDERATIONS: Reject all bids, which is not recommended. BACKGROUND: This project is the eighth phase of multiple phases in Lafayette (see Attachment 1). The Lafayette Sewer Renovations, Phase 8 project will renovate 8,300 linear feet of 6- and 8 -inch sewer lines in the South Peardale area. Construction of the sewers in easements will involve close cooperation with customers for site access and restoration. District staff prepared the plans and specifications for the project. The Engineer's estimate for construction of the Lafayette Sewer Renovations, Phase 8, is $1,500,000. This project was advertised on February 13 and 19, 2013. Five (5) sealed bids, ranging from $1,321,305 to $2,176,373, were received and publicly opened on March 5, 2013. The Engineering Department conducted a technical and commercial review of the bids C:\ Users \danderson\AppData \Local \Microsoft \Windows \Temporary Internet Files \Content.Outlook \DVCG8C5G \8404 PP Award - Lafayette 8.doc Page 1 of 6 POSITION PAPER Board Meeting Date: March 21, 2013 Subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH CARONE & COMPANY, INC. FOR THE CONSTRUCTION OF THE LAFAYETTE SEWER RENOVATIONS, PHASE 8, DISTRICT PROJECT 8404 and determined that Carone & Company, Inc. is the lowest responsive bidder with a bid amount of $1,321,305. A summary of bids received is shown in Attachment 2. The District will administer the construction contract and will provide contract administration, inspection, survey, office engineering, and submittal review. The funds required to complete this project, as shown in Attachment 3, are $1,779,500. The total cost of the Lafayette Sewer Renovations, Phase 8, is anticipated to be $2,379,500. This project is included in the fiscal year (FY) 2012 -2013 Capital Improvement Budget (CIB) on page CS -14. Staff has conducted a cash -flow analysis of the Collection System Program budget and concluded that adequate funds are available for this project. Staff has concluded that this project is exempt from the California Quality Act (CEQA) under CCCSD CEQA Guidelines Section 15302, because it involves replacement of existing sewer facilities at substantially the same locations and with the same purpose and level of activity as the facilities being replaced. Any capacity increases are for non - growth inducing, wet weather purposes. This project also is exempt under District CEQA Guidelines Section 15061(b)(3), since it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment. This certainty is based on the District's past experience with numerous sewer construction projects of this nature, the relatively short distances involved, and the District's mitigating construction specifications. These specifications are standardized general and special conditions that are made part of the project bid documents to address environmental considerations, such as protecting trees and riparian areas, as well as compliance with applicable federal, state, county, district, municipal and local laws, ordinances, orders, and regulations. Approval of this project will establish the Board of Directors' independent finding that this project is exempt from CEQA. RECOMMENDED BOARD ACTION: Staff recommends the following: Find that the project is exempt from CEQA, 2. Award a construction contract in the amount of $1,321,305 for the construction of the Lafayette Sewer Renovations, Phase 8, District Project 8404, to Carone & Company, Inc., the lowest responsive bidder, and C:\ Users \danderson\AppData \Local \Microsoft \Windows \Temporary Internet Files \Content.Outlook \DVCG8C5G \8404 PP Award - Lafayette 8.doc Page 2 of 6 POSITION PAPER Board Meeting Date: March 21, 2013 subiect: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH CARONE & COMPANY, INC. FOR THE CONSTRUCTION OF THE LAFAYETTE SEWER RENOVATIONS, PHASE 8, DISTRICT PROJECT 8404 3. Authorize the General Manager to execute the Contract Documents subject to SUBMITTAL requirements. Attachments: 1 — Project Locations 2 — Summary of Bids 3 — Post -Bid / Preconstruction Estimate C:\ Users \danderson\AppData \Local \Microsoft \Windows \Temporary Internet Files \Content.Outlook \DVCG8C5G \8404 PP Award - Lafayette 8.doc Page 3 of 6 C:\ Users \danderson\AppData \Local \Microsoft \Windows \Temporary Internet Files \Content.Outlook \DVCG8C5G \8404 PP Award - Lafayette 8.doc Page 4 of 6 ATTACHMENT 2 LAFAYETTE SEWER RENOVATIONS, PHASE 8 DISTRICT PROJECT 8404 SUMMARY OF BIDS PROJECT NO.: DP 8404 DATE: MARCH 5, 2013 PROJECT NAME: LAFAYETTE SEWER RENOVATIONS, PHASE 8 PROJECT LOCATION: SOUTH PEARDALE DRIVE, LAFAYETTE, CA NO. OF ADDENDA: 1 ENGINEER ESTIMATE: $1,500,000 NO. BIDDER BID PRICE 1 Carone & Company, Inc. $1,321,305 Concord, CA 94520 2 Bay Pacific Pipelines, Inc. $1,356,350 Novato, CA 94947 3 K. J. Woods Construction, Inc. $1,878,000 San Francisco, CA 94124 4 California Trenchless, Inc. $2,064,755 Dublin, CA 94568 5 McGuire & Hester $2,176,373 Oakland, CA 94603 BIDS OPENED BY /s/ Elaine Boehme, CMC DATE: March 5, 2013 C:\ Users \dandersonWppData \Local \Microsoft \Windows \Temporary Internet Files \Content.Outlook \DVCG8C5G \8404 PP Award - Lafayette 8.doc Page 5 of 6 ATTACHMENT 3 LAFAYETTE SEWER RENOVATIONS, PHASE 8 DISTRICT PROJECT 8404 POST -BID / PRECONSTRUCTION ESTIMATE No. Item Description Amounts % Construction Cost 1. CONSTRUCTION a. Construction Contract $1,321,305 b. Contingency at 15% $198,195 c. Permit $30,000 SUBTOTAL - CONSTRUCTION COST $1,549,500 100% 2. CONSTRUCTION MANAGEMENT a. District Forces - Inspection $140,000 - Construction Management $30,000 - Public Relations $12,000 b. Consultants - Material Testing $20,000 - Geotechnical and Arborist $32,000 SUBTOTAL - CONSTRUCTION MANAGEMENT $234,000 15% 3. PREBID EXPENDITURES a. Engineering $376,000 24% b. Right of Way $95,000 6% c. Survey $125,000 8% SUBTOTAL - PREBID EXPENDITURES $596,000 38% 4. TOTAL PROJECT COST $2,379,500 5. FUNDS AUTHORIZED TO DATE $600,000 6. ADDITIONAL ALLOCATION NEEDED TO COMPLETE PROJECT (Line 4 - Line 5 ) 1 779 500 C:\ Users \danderson\AppData \Local \Microsoft \Windows \Temporary Internet Files \Content.0utlook \DVCG8C5G \8404 PP Award - Lafayette 8.doc Page 6 of 6