Loading...
HomeMy WebLinkAbout08.a. (Handout) Accept 2012 (NPDES) National Pollutant Discharge Elimination System Annual Report9-61. 6A^Vlc64�� 2012 National Pollutant Discharge Elimination System Annual Report Alan R. Weer Board Meeting January 24, 2013 Central Contra Costa Sanitary District 2012 NPDES Annual Report ➢ Total flow treated =13.7 billion gallons (14.8 billion in 2011) ➢ Average daily flow = 37.6 million gallons (39.5 million in 2011) ➢ Peak hourly flow = 183 million gallons per day ➢ Ash disposal = 3,700 tons (wet weight for soil amendment; 3,900 tons in 2011) Treatment Plant ➢ Completed over 15,000 analytical tests ➢ Approximately 11,000 hours of laboratory work ➢ Successful completion of the Outfall Improvements Project ➢ 100 percent compliance with NPDES Permit requirements ➢ NACWA Platinum Award -15th Consecutive Year! 2012 NPDES Annual Report Acknowledgements: Board of Directors Laboratory Source Control Collection System and Pumping Stations Engineering Administration Plant Operations and Maintenance Recommendation Accept the 2012 NPDES Annual Report